Home Projects More like: WAMS based self-tuning FACTS controllers for improved utilisation of existing power transmission assets [Clear] # Title Funder Funding Start End Status 81 E Van Innovate UK £2,843,796 Sept. 30, 2009 March 31, 2013 Closed 82 E Van Innovate UK £7,109,490 Sept. 30, 2009 March 31, 2013 Closed 83 Superconducting Ferromagnetic Metamaterials Enabling the Development of Resilient High Voltage / High Current Transmission Systems EPSRC £1,214,660 Jan. 7, 2020 Jan. 6, 2023 Closed 84 Superconducting Ferromagnetic Metamaterials Enabling the Development of Resilient High Voltage / High Current Transmission Systems EPSRC £485,864 Jan. 7, 2020 Jan. 6, 2023 Active 85 Data-Driven Predictive Control for Ensuring Grid Security with High Penetration of Wind Energy EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 86 Mid-stage development of the CCell Wave Energy Converter EPSRC £2,863,585 July 5, 2015 July 5, 2018 Closed 87 Interfacing Next-Generation Grid-Scale Storage to the Electrical Power Network (Inter-Storage) EPSRC £840,201 Aug. 31, 2022 Aug. 30, 2024 Active 88 Interfacing Next-Generation Grid-Scale Storage to the Electrical Power Network (Inter-Storage) EPSRC £4,201,005 Aug. 31, 2022 Dec. 31, 2024 Active 89 Addressing the complexity of future power system dynamic behaviour FLF £2,977,695 March 31, 2024 March 31, 2027 Active 90 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) UKRI £1,518,462 May 31, 2020 April 29, 2023 Active 91 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) UKRI £1,936,726 April 30, 2019 May 30, 2020 Closed 92 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) FLF £3,796,155 May 31, 2020 May 1, 2024 Active 93 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) FLF £4,841,815 April 30, 2019 May 31, 2020 Closed 94 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £1,069,724 Oct. 30, 2014 Oct. 28, 2017 Closed 95 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £2,674,310 Oct. 30, 2014 Oct. 29, 2017 Closed 96 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £1,469,570 May 30, 2013 Dec. 16, 2016 Closed 97 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £3,673,925 May 30, 2013 Dec. 16, 2016 Closed 98 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £1,589,160 Sept. 30, 2021 Sept. 29, 2024 Active 99 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £3,972,900 Sept. 30, 2021 Sept. 30, 2024 Active 100 Smart Microelectromechanical Systems (MEMS) Actuators EPSRC £201,404 April 12, 2010 April 11, 2012 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »