Home Projects More like: WAMS based self-tuning FACTS controllers for improved utilisation of existing power transmission assets [Clear] # Title Funder Funding Start End Status 61 Analytical Middleware for Informed Distribution Networks (AMIDiNe) EPSRC £3,515,455 Sept. 30, 2019 Sept. 30, 2022 Closed 62 Novel low-cost methods for marine mammal and environmental monitoring NERC £706,970 Jan. 1, 2018 June 30, 2020 Closed 63 Novel low-cost methods for marine mammal and environmental monitoring NERC £1,767,425 Jan. 1, 2018 July 1, 2020 Closed 64 Condition Monitoring Power Electronics for Reliability (COMPERE) EPSRC £1,452,045 Nov. 1, 2007 Oct. 31, 2010 Closed 65 Condition Monitoring Power Electronics for Reliability (COMPERE) EPSRC £1,313,875 Sept. 3, 2007 Sept. 3, 2010 Closed 66 High Voltage Test Systems For Electricity Network Research EPSRC £3,713,268 March 31, 2017 March 30, 2018 Closed 67 High Voltage Test Systems For Electricity Network Research EPSRC £9,283,170 March 31, 2017 March 31, 2018 Closed 68 Increasing the Observability of Electrical Distribution Systems using Smart Meters (IOSM) EPSRC £199,464 Sept. 29, 2012 March 29, 2014 Closed 69 Increasing the Observability of Electrical Distribution Systems using Smart Meters (IOSM) EPSRC £498,660 Sept. 29, 2012 March 29, 2014 Closed 70 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 71 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 72 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 73 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 74 Increasing the Life of Marine Turbines by Design and Innovation EPSRC £1,148,100 April 30, 2012 Oct. 31, 2015 Closed 75 Dynamic Loadings on Turbines in a Tidal Array (DyLoTTA) EPSRC £1,607,090 June 30, 2016 March 30, 2020 Closed 76 Accelerating the deployment of offshore wind using DC technology Horizon Europe Guarantee £884,170 Feb. 22, 2023 Feb. 21, 2027 Active 77 Accelerating the deployment of offshore wind using DC technology Horizon Europe Guarantee £3,536,685 Sept. 30, 2022 Sept. 30, 2026 Active 78 Accelerating the deployment of offshore wind using DC technology UKRI £707,337 Sept. 30, 2022 Sept. 29, 2026 Active 79 Accelerating the Deployment of Offshore wind using Dc technology UKRI £176,834 Sept. 30, 2022 Sept. 29, 2026 Active 80 Accelerating the Deployment of Offshore wind using Dc technology Horizon Europe Guarantee £884,170 Sept. 30, 2022 Sept. 30, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »