# Title Funder Funding Start End Status
1 WAMS based self-tuning FACTS controllers for improved utilisation of existing power transmission assets EPSRC
£1,283,260
July 2, 2008 July 2, 2011 Closed
2 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC
£1,760,862
March 31, 2013 March 30, 2016 Closed
3 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC
£4,402,155
March 31, 2013 March 31, 2016 Closed
4 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC
£196,306
Oct. 4, 2010 Jan. 4, 2013 Closed
5 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC
£490,765
Oct. 4, 2010 Jan. 4, 2013 Closed
6 Developing Fundamental Theory and Enabling Technologies for Parallel Operation of Inverters to Facilitate Large-scale Utilisation of Renewable Energy EPSRC
£744,330
March 1, 2013 June 29, 2016 Closed
7 Developing Fundamental Theory and Enabling Technologies for Parallel Operation of Inverters to Facilitate Large-scale Utilisation of Renewable Energy EPSRC
£1,860,825
March 1, 2013 June 30, 2016 Closed
8 Optimal sensor deployment and data analytics for power distribution network visibility and control EPSRC, NERC
£0
Sept. 30, 2017 May 31, 2022 Closed
9 Wake Properties Prediction by means of machine learning algorithms EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
10 Wake Properties Prediction by means of machine learning algorithms EPSRC
£0
Dec. 1, 2022 Nov. 30, 2026 Active
11 Wake Properties Prediction by means of machine learning algorithms EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Closed
12 Load Reduction Device Integration Feasibility In Llyr Innovate UK
£226,899
Sept. 30, 2022 Sept. 29, 2023 Active
13 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC
£1,341,844
March 1, 2013 Feb. 29, 2016 Closed
14 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC
£3,354,610
March 1, 2013 Feb. 29, 2016 Closed
15 Interoperable energy site dispatch controller driving energy access by enabling seamless integration of multiple power and energy solutions (The Auto-Controller) Innovate UK
£997,800
March 1, 2020 Feb. 28, 2021 Closed
16 Interoperable energy site dispatch controller driving energy access by enabling seamless integration of multiple power and energy solutions (The Auto-Controller) Innovate UK
£399,120
March 1, 2020 Feb. 28, 2021 Closed
17 Development of a dynamic predictor of battery cooling in automotive applications EPSRC
£0
Sept. 30, 2019 March 30, 2023 Active
18 Millimetre-wave and Terahertz On-chip Circuit Test Cluster for 6G Communications and Beyond (TIC6G) EPSRC
£5,259,212
Jan. 1, 2022 Dec. 31, 2023 Active
19 Accurate Time and radio signal distribution through Optical access networks to enable sub-Metre positioning accuracy (ATOM) Innovate UK
£192,867
Nov. 1, 2022 Oct. 31, 2023 Active
20 Accurate Time and radio signal distribution through Optical access networks to enable sub-Metre positioning accuracy (ATOM) Innovate UK
£964,335
Nov. 1, 2022 Jan. 31, 2024 Active
Reset