Home Projects More like: Understanding the fatigue behavior of tidal turbine blades [Clear] # Title Funder Funding Start End Status 81 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 82 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 83 A Micro-Mechanistic Study of Oxygen-Diffusion-Assisted Crack Growth in a Polycrystalline Nickel-Based Superalloy EPSRC £393,718 Nov. 12, 2007 Nov. 11, 2010 Closed 84 Excalibur - A novel subsea infrastructure solution for the deployment of tidal arrays Innovate UK £224,178 Sept. 30, 2016 June 29, 2017 Closed 85 ALL-TTidal: Arrays of Long Life Turbines for Tidal EPSRC £245,256 Sept. 30, 2014 June 29, 2015 Closed 86 Tidal Energy Converter Enabling Technology: Removable Subsea Rock Anchor and Subsea Drill Rig Innovate UK £728,046 June 30, 2014 Sept. 29, 2015 Closed 87 Tidal Energy Converter Enabling Technology: Removable Subsea Rock Anchor and Subsea Drill Rig Innovate UK £1,213,410 June 30, 2014 Sept. 30, 2015 Closed 88 Measured dynamic loading and power performance of tidal turbines in realistic flow conditions EPSRC £371,400 Sept. 30, 2014 Sept. 29, 2015 Closed 89 A General Approach to the Analysis of Fatigue Cracks in Lubricated Contacts EPSRC £410,246 Sept. 10, 2007 Sept. 9, 2010 Closed 90 NaREC Marine Testing Facility (Nautilus) Innovate UK £22,514,716 Aug. 31, 2009 Sept. 29, 2013 Closed 91 NaREC Marine Testing Facility (Nautilus) Innovate UK £56,286,790 Aug. 31, 2009 Sept. 30, 2013 Closed 92 Mechanical characterisation of CMSX-3 and CMSX-4 with PT and PTAL Coatings under thermo-mechanical fatigue loading conditions EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 93 Limiting Biofouling of Tidal Turbines through Surface Engineering EPSRC £0 Oct. 1, 2017 Sept. 29, 2021 Closed 94 Limiting Biofouling of Tidal Turbines through Surface Engineering EPSRC £0 Oct. 1, 2017 Sept. 30, 2021 Closed 95 Physiological systems integration in the optimisation of exercise tolerance BBSRC £97,284 Sept. 30, 2011 Feb. 28, 2014 Closed 96 Physiological systems integration in the optimisation of exercise tolerance BBSRC £425,066 Aug. 31, 2011 Feb. 28, 2014 Closed 97 Physiological systems integration in the optimisation of exercise tolerance BBSRC £243,210 Sept. 30, 2011 Feb. 28, 2014 Closed 98 Physiological systems integration in the optimisation of exercise tolerance BBSRC £1,062,665 Aug. 31, 2011 Feb. 28, 2014 Closed 99 3D Assessment of Surface Integrity and Performance EPSRC £904,294 July 31, 2011 Oct. 31, 2014 Closed 100 Marine mussel plaque-inspired anchoring systems for offshore floating structures EPSRC £1,008,755 April 9, 2023 March 9, 2025 Active Reset Search Term(s): Status: --------- Active Closed Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »