# Title Funder Funding Start End Status
21 Characterisation and behaviour of advanced Ni-based superalloys at elevated temperatures EPSRC
£0
Sept. 29, 2019 March 28, 2023 Active
22 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK
£460,570
Sept. 30, 2010 March 31, 2013 Closed
23 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK
£1,151,425
Sept. 30, 2010 March 31, 2013 Closed
24 Fatigue Effects in Composite Tidal Turbine Blades caused by Discrete Point Loading during Service EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
25 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC
£200,696
Dec. 1, 2016 March 30, 2018 Closed
26 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC
£501,740
Dec. 1, 2016 March 31, 2018 Closed
27 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK
£1,109,806
Aug. 31, 2010 Nov. 30, 2013 Closed
28 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK
£2,774,515
Aug. 31, 2010 Nov. 30, 2013 Closed
29 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC
£626,438
Oct. 23, 2014 Oct. 22, 2018 Closed
30 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC
£701,926
Oct. 14, 2014 April 14, 2019 Closed
31 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC
£803,262
Oct. 23, 2014 April 22, 2019 Closed
32 Platform location and connection Innovate UK
£690,604
March 1, 2013 Sept. 29, 2014 Closed
33 Fully Submerged Evolution of SeaGen for Exposed Open Deep Water Locations EPSRC
£291,274
Dec. 1, 2010 Nov. 30, 2012 Closed
34 Flow control to mitigate fatigue load through the use of flexible tidal turbine blades EPSRC
£192,096
Sept. 30, 2014 June 29, 2015 Closed
35 Non-Destructive Detection of In-Service Corrosion on Gas Turbine Components EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
36 Thermo-mechanical property measurement of nuclear graphites at elevated temperatures EPSRC
£0
Sept. 30, 2019 Dec. 31, 2023 Active
37 Fully Submerged Evolution of SeaGen for Exposed Open Deep Water Locations Innovate UK
£99,520
Dec. 1, 2010 Nov. 30, 2012 Closed
38 Fully Submerged Evolution of SeaGen for Exposed Open Deep Water Locations Innovate UK
£248,800
Dec. 1, 2010 Nov. 30, 2012 Closed
39 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC
£3,231,690
Oct. 2, 2022 Oct. 1, 2025 Active
40 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC
£16,158,450
Oct. 2, 2022 Oct. 2, 2025 Active
Reset