Home Projects More like: Understanding the fatigue behavior of tidal turbine blades [Clear] # Title Funder Funding Start End Status 21 Characterisation and behaviour of advanced Ni-based superalloys at elevated temperatures EPSRC £0 Sept. 29, 2019 March 28, 2023 Active 22 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK £460,570 Sept. 30, 2010 March 31, 2013 Closed 23 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK £1,151,425 Sept. 30, 2010 March 31, 2013 Closed 24 Fatigue Effects in Composite Tidal Turbine Blades caused by Discrete Point Loading during Service EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 25 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £200,696 Dec. 1, 2016 March 30, 2018 Closed 26 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £501,740 Dec. 1, 2016 March 31, 2018 Closed 27 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £1,109,806 Aug. 31, 2010 Nov. 30, 2013 Closed 28 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £2,774,515 Aug. 31, 2010 Nov. 30, 2013 Closed 29 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £626,438 Oct. 23, 2014 Oct. 22, 2018 Closed 30 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £701,926 Oct. 14, 2014 April 14, 2019 Closed 31 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £803,262 Oct. 23, 2014 April 22, 2019 Closed 32 Platform location and connection Innovate UK £690,604 March 1, 2013 Sept. 29, 2014 Closed 33 Fully Submerged Evolution of SeaGen for Exposed Open Deep Water Locations EPSRC £291,274 Dec. 1, 2010 Nov. 30, 2012 Closed 34 Flow control to mitigate fatigue load through the use of flexible tidal turbine blades EPSRC £192,096 Sept. 30, 2014 June 29, 2015 Closed 35 Non-Destructive Detection of In-Service Corrosion on Gas Turbine Components EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 36 Thermo-mechanical property measurement of nuclear graphites at elevated temperatures EPSRC £0 Sept. 30, 2019 Dec. 31, 2023 Active 37 Fully Submerged Evolution of SeaGen for Exposed Open Deep Water Locations Innovate UK £99,520 Dec. 1, 2010 Nov. 30, 2012 Closed 38 Fully Submerged Evolution of SeaGen for Exposed Open Deep Water Locations Innovate UK £248,800 Dec. 1, 2010 Nov. 30, 2012 Closed 39 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC £3,231,690 Oct. 2, 2022 Oct. 1, 2025 Active 40 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC £16,158,450 Oct. 2, 2022 Oct. 2, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »