Home Projects More like: Novel Adaptive Filtering Techniques for Multidimensional Signals [Clear] # Title Funder Funding Start End Status 1 Modeling and Analysis of Higher-Order Switched Linear Systems EPSRC £8,870 April 30, 2014 Aug. 30, 2014 Closed 2 Modeling and Analysis of Higher-Order Switched Linear Systems EPSRC £22,175 April 30, 2014 Aug. 31, 2014 Closed 3 RATIONAL ENGINEERING OF SYNTHETIC ELECTRON TRANSFER CIRCUITS IN BACTERIA. EPSRC £0 Sept. 30, 2018 Sept. 22, 2022 Active 4 Adaptive hierarchical radiation transport methods to meet future challenges in reactor physics EPSRC £5,796,670 Dec. 1, 2011 Nov. 30, 2015 Closed 5 Scalable Non-invasive Radiometric Wireless Sensor Network for Partial Discharge Monitoring in the Future Smart Grid EPSRC £1,120,324 April 2, 2013 March 31, 2018 Closed 6 Scalable Non-invasive Radiometric Wireless Sensor Network for Partial Discharge Monitoring in the Future Smart Grid EPSRC £2,800,810 April 2, 2013 April 1, 2018 Closed 7 Dynamic Responsive Signal Control for Railway Junctions EPSRC £1,721,200 Jan. 1, 2011 June 30, 2013 Closed 8 Neuromorphic memristive circuits to simulate inhibitory and excitatory dynamics of neuron networks: from physiological similarities to deep learning EPSRC £1,931,134 Jan. 6, 2020 Jan. 31, 2024 Active 9 Communication through complex media: a novel interdisciplinary paradigm to bridge information theory and multiscale flow and transport theory. EPSRC £0 Dec. 1, 2018 May 31, 2021 Closed 10 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) UKRI £1,518,462 May 31, 2020 April 29, 2023 Active 11 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) UKRI £1,936,726 April 30, 2019 May 30, 2020 Closed 12 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) FLF £3,796,155 May 31, 2020 May 1, 2024 Active 13 Indicative Data: Extracting 3D Models of Cities from Unavailability and Degradation of Global Navigation Satellite Systems (GNSS) FLF £4,841,815 April 30, 2019 May 31, 2020 Closed 14 Photonically-synthesized Digital-to-Analogue Conversion EPSRC £737,688 July 31, 2018 March 30, 2022 Closed 15 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £652,520 Jan. 5, 2009 July 3, 2012 Closed 16 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £1,631,300 Jan. 5, 2009 July 4, 2012 Closed 17 Understanding and reducing artefacts in simultaneously acquired EEG and fMRI data EPSRC £678,358 Feb. 1, 2012 July 30, 2015 Closed 18 OCT for 2D and 3D velocity measurement in micro-fluidic flows EPSRC £948,662 June 29, 2014 Sept. 29, 2017 Closed 19 At the limits of adaptive systems: constrained adaptive control EPSRC £582,074 March 1, 2016 Aug. 30, 2019 Closed 20 High Performance Processing of Distributed Acoustic Sensing Data EPSRC £0 Aug. 31, 2019 Dec. 31, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »