Home Projects More like: Novel Adaptive Filtering Techniques for Multidimensional Signals [Clear] # Title Funder Funding Start End Status 41 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £198,046 Jan. 16, 2012 May 14, 2013 Closed 42 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £495,115 Jan. 16, 2012 May 15, 2013 Closed 43 A time to every purpose: SCN cell-specific control of daily physiological timing BBSRC £929,814 March 31, 2016 March 31, 2019 Closed 44 A time to every purpose: SCN cell-specific control of daily physiological timing BBSRC £2,324,535 March 31, 2016 March 31, 2019 Closed 45 A label-free tool to unravel the dynamics of lipid bilayers containing single membrane proteins: iGOR microscopy BBSRC £302,272 Feb. 15, 2019 Aug. 30, 2020 Closed 46 AdAPTS: Adaptive Aerostructures for Power and Transportation Sustainability EPSRC £2,238,112 Sept. 30, 2020 Sept. 29, 2025 Active 47 Laser induced breakdown spectroscopy tandem with laser ablation NERC £297,678 Sept. 30, 2019 July 29, 2020 Closed 48 A low-cost solution for tracking small-bodied insects in the field: Developing solar-powered, active RFID tags NERC £129,700 May 15, 2014 March 15, 2015 Closed 49 A low-cost solution for tracking small-bodied insects in the field: Developing solar-powered, active RFID tags NERC £324,250 May 15, 2014 March 15, 2015 Closed 50 How does the Drosophila brain compute and see visual motion? BBSRC £1,090,084 Feb. 1, 2008 Jan. 31, 2011 Closed 51 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC £361,552 Oct. 29, 2012 Oct. 28, 2014 Closed 52 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC £903,880 Oct. 29, 2012 Oct. 28, 2014 Closed 53 BOULDER: Accounting for BOUlders in Landslide-flood Disaster Evaluation and Resilience NERC £1,264,355 Sept. 30, 2018 Oct. 31, 2019 Closed 54 BOULDER: Accounting for BOUlders in Landslide-flood Disaster Evaluation and Resilience NERC £535,060 Nov. 1, 2019 May 31, 2022 Closed 55 HIGH PERFORMANCE COMPUTING SUPPORT FOR UNITED KINGDOM CONSORTIUM ON TURBULENT REACTING FLOWS (UKCTRF) EPSRC £338,958 Jan. 8, 2014 Jan. 7, 2019 Closed 56 HIGH PERFORMANCE COMPUTING SUPPORT FOR UNITED KINGDOM CONSORTIUM ON TURBULENT REACTING FLOWS (UKCTRF) EPSRC £847,395 Jan. 8, 2014 Jan. 7, 2019 Closed 57 High Power 200 GHz Pulsed/Continuous Wave (CW) Microwave Source for Dynamic Nuclear Polarization (DNP) Spectroscopy EPSRC £100,092 Jan. 1, 2013 Dec. 31, 2014 Closed 58 High-field Dynamic Nuclear Polarization Magic Angle Spinning NMR for Chemistry, Physics, Materials, Pharmaceuticals and Biomolecular Science EPSRC £1,313,425 Sept. 29, 2014 Sept. 29, 2018 Closed 59 Mission Planning for Long-Term Deployment using Probabilistic Environment Models EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 60 Spectroscopic Probes of Energy Regulation & Metabolism (SPERM): Using High Resolution MR spectroscopy to identify biomarkers of male fertility MRC £1,478,880 March 31, 2015 June 29, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »