# Title Funder Funding Start End Status
1 F.E.S-Board® Internal Wall Lining System Innovate UK
£25,000
Feb. 1, 2013 July 31, 2013 Closed
2 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£1,997,756
March 31, 2016 March 31, 2019 Closed
3 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£4,994,390
March 31, 2016 March 31, 2019 Closed
4 Thermulon - Production of high-performance insulation - Incorporating waste materials into the production process Innovate UK
£298,434
May 31, 2020 Nov. 30, 2021 Closed
5 Development of a market ready, ultra-low energy, compact cooling and decentralised ventilation unit utilising PCM and a heat pump targeted at office applications Innovate UK
£524,858
Sept. 30, 2020 Jan. 31, 2022 Closed
6 Novel Variable Conductance Heat Pipe Coupled with a Stirling Engine EPSRC
£74,830
Feb. 1, 2014 April 29, 2015 Closed
7 Novel Variable Conductance Heat Pipe Coupled with a Stirling Engine EPSRC
£187,075
Feb. 1, 2014 April 30, 2015 Closed
8 Heat supply through Solar Thermochemical Residential Seasonal Storage (Heat-STRESS) EPSRC
£1,336,448
May 31, 2016 Sept. 28, 2019 Closed
9 Heat supply through Solar Thermochemical Residential Seasonal Storage (Heat-STRESS) EPSRC
£58,358
Sept. 30, 2019 Nov. 30, 2019 Closed
10 Heat supply through Solar Thermochemical Residential Seasonal Storage (Heat-STRESS) EPSRC
£3,341,120
May 31, 2016 Sept. 29, 2019 Closed
11 Heat supply through Solar Thermochemical Residential Seasonal Storage (Heat-STRESS) EPSRC
£145,895
Sept. 30, 2019 Nov. 30, 2019 Closed
12 Eco Heat surfaces Innovate UK
£252,104
Sept. 30, 2020 June 29, 2021 Closed
13 Eco Heat surfaces Innovate UK
£630,260
Sept. 30, 2020 June 30, 2021 Closed
14 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC
£164,776
July 31, 2016 July 30, 2019 Closed
15 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC
£1,081,208
July 31, 2016 April 29, 2020 Closed
16 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC
£2,703,020
July 31, 2016 April 30, 2020 Closed
17 Future-proofing facilities management (Future FM ) EPSRC
£979,400
Sept. 29, 2014 March 30, 2018 Closed
18 Future-proofing facilities management (Future FM ) EPSRC
£2,448,500
Sept. 29, 2014 March 31, 2018 Closed
19 Development of prototype using phase change materials to enhance active thermal mass energy storage in buildings to achieve low energy and comfortable indoor climates. Innovate UK
£136,270
Jan. 1, 2015 June 29, 2016 Closed
20 Compact Solar-Powered Thermal Energy Storage Battery (SolarHeatStore) Innovate UK
£365,506
Aug. 31, 2018 Aug. 30, 2020 Closed
Reset