Home Projects More like: F.E.S-Board® Internal Wall Lining System [Clear] # Title Funder Funding Start End Status 81 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £1,045,512 Aug. 31, 2020 Aug. 30, 2023 Active 82 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £2,613,780 Aug. 31, 2020 Feb. 29, 2024 Active 83 New Empirically-Based Models of Energy Use in the Building Stock EPSRC £2,314,145 Jan. 1, 2012 Dec. 31, 2013 Closed 84 Gas-Fired Heat Pumps - Transforming the UK's Domestic Heating Sector EPSRC £195,638 Sept. 30, 2009 Sept. 29, 2010 Closed 85 Gas-Fired Heat Pumps - Transforming the UK's Domestic Heating Sector EPSRC £489,095 Sept. 30, 2009 Sept. 30, 2010 Closed 86 Hunting for the perfect phase change material (PCM) for the built environment EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 87 Building envelope integrated solar thermal systems for space and water heating EPSRC £0 Jan. 1, 2018 Sept. 29, 2021 Closed 88 Building envelope integrated solar thermal systems for space and water heating EPSRC £0 Jan. 1, 2018 Sept. 30, 2021 Closed 89 Development of a low carbon heating and cooling system with storage and gender based temperature regulation for public and commercial buildings Innovate UK £537,210 Sept. 30, 2020 Sept. 29, 2021 Closed 90 Development of a low carbon heating and cooling system with storage and gender based temperature regulation for public and commercial buildings Innovate UK £1,343,025 Sept. 30, 2020 Sept. 30, 2021 Closed 91 Non Steady Analytical Models for Energy Pile Testing and Design EPSRC £199,538 Dec. 1, 2016 Sept. 13, 2019 Closed 92 Non Steady Analytical Models for Energy Pile Testing and Design EPSRC £498,845 Dec. 1, 2016 Sept. 14, 2019 Closed 93 Building Banter EPSRC £43,230 Aug. 31, 2010 Nov. 30, 2011 Closed 94 Building Banter EPSRC £108,075 Aug. 31, 2010 Nov. 30, 2011 Closed 95 Follow on of Range extended- refrigerated BEVs for CO2 abatement in fleets project Innovate UK £3,016,470 March 11, 2021 March 11, 2023 Closed 96 Beyond Individual Persuasion: Towards a Paradigm Shift in Interactive Visualisation and Sensing for Environmental Change EPSRC £3,376,175 Sept. 30, 2021 March 31, 2024 Active 97 Advanced building façade design for optimal delivery of end use energy demand EPSRC £3,306,214 June 30, 2019 June 29, 2024 Active 98 Advanced building façade design for optimal delivery of end use energy demand EPSRC £8,265,535 June 30, 2019 June 30, 2024 Active 99 The impact of thermally-regulated cell wall modifications on Streptococcus pneumoniae pathogenesis MRC £2,596,485 Jan. 2, 2023 Nov. 30, 2026 Active 100 Thermulon – non-combustible high performance building insulation Innovate UK £676,074 Nov. 1, 2020 Dec. 31, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »