Home Projects More like: Modelling Creep and Creep-Fatigue Damage for CSEF Power Plant Steels [Clear] # Title Funder Funding Start End Status 81 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £701,926 Oct. 14, 2014 April 14, 2019 Closed 82 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £803,262 Oct. 23, 2014 April 22, 2019 Closed 83 Limiting Biofouling of Tidal Turbines through Surface Engineering EPSRC £0 Oct. 1, 2017 Sept. 29, 2021 Closed 84 Limiting Biofouling of Tidal Turbines through Surface Engineering EPSRC £0 Oct. 1, 2017 Sept. 30, 2021 Closed 85 Long Term, In Situ Material Degradation Studies Utilizing High Resolution Laboratory X-ray Tomography EPSRC £202,046 March 11, 2010 March 10, 2012 Closed 86 Grid integration of multiple flywheel energy storage systems Innovate UK £197,166 March 1, 2014 Feb. 28, 2015 Closed 87 Grid integration of multiple flywheel energy storage systems Innovate UK £492,915 March 1, 2014 Feb. 28, 2015 Closed 88 MOSAIC (Monitoring, Scanning and Active Inspection of Cables) Innovate UK £985,508 Dec. 1, 2013 Nov. 30, 2016 Closed 89 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 90 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 91 Heterogeneous case-carburised bearing steel microstructures EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 92 Enhancing nuclear fuel efficiency through improved understanding of irradiation damage in zirconium cladding EPSRC £7,500,055 Jan. 1, 2011 March 31, 2017 Closed 93 Formalisation and experimental validation of a novel design methodology to estimate finite lifetime under fretting fatigue loading EPSRC £0 Sept. 25, 2016 May 5, 2021 Closed 94 Performance and Reliability of Metallic Materials for Nuclear Fission Power Generation EPSRC £1,718,140 June 30, 2010 March 31, 2015 Closed 95 The Development of Nuclear Manufacturing Techniques for Nuclear Applications EPSRC £342,768 April 30, 2013 April 29, 2015 Closed 96 The Development of Nuclear Manufacturing Techniques for Nuclear Applications EPSRC £856,920 April 30, 2013 April 30, 2015 Closed 97 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC £555,894 Dec. 3, 2007 June 1, 2011 Closed 98 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC £177,708 Sept. 30, 2007 Sept. 29, 2010 Closed 99 MAINTAiN - Multi-scAle INTegrity assessment for Advanced high-temperature Nuclear systems EPSRC £1,970,165 March 31, 2018 Sept. 30, 2022 Closed 100 BRIM: Building Resilience Into risk Management EPSRC £2,083,445 March 1, 2016 Nov. 30, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »