# Title Funder Funding Start End Status
41 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£199,806
Feb. 12, 2020 Aug. 10, 2021 Closed
42 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£499,515
Feb. 12, 2020 Aug. 11, 2021 Closed
43 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC
£628,950
June 30, 2022 June 29, 2025 Active
44 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC
£3,144,750
June 30, 2022 June 30, 2025 Active
45 Environmental degradation of SiC/SiC EPSRC
£0
June 30, 2017 June 29, 2020 Closed
46 Environmental Impact on the Structural Integrity of Nuclear Components Innovate UK
£5,429,245
March 31, 2013 June 30, 2016 Closed
47 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC
£0
Feb. 1, 2018 Feb. 28, 2022 Closed
48 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC, NERC
£0
Feb. 1, 2018 Feb. 28, 2022 Closed
49 Hydrogen in metals - from fundamentals to the design of new steels (HEmS) EPSRC
£10,969,246
Dec. 9, 2013 Dec. 8, 2019 Closed
50 Hydrogen in metals - from fundamentals to the design of new steels (HEmS) EPSRC
£27,423,115
Dec. 9, 2013 Dec. 8, 2019 Closed
51 SUPERGEN 2 - Conventional Power Plant Lifetime Extension Consortium - CORE EPSRC
£12,575,991
June 30, 2008 Dec. 30, 2012 Closed
52 SUPERGEN 2 - Conventional Power Plant Lifetime Extension Consortium - CORE EPSRC
£20,959,985
June 30, 2008 Dec. 30, 2012 Closed
53 A Nuclear Decommissioning Manipulator with Novel Variable Impedance Actuator EPSRC
£1,987,545
Nov. 1, 2021 Sept. 30, 2024 Active
54 Development and Evaluation of Sustainable Technologies for Flexible Operation of Conventional Power Plants. EPSRC
£3,888,880
Sept. 15, 2013 March 14, 2019 Closed
55 Development and Evaluation of Sustainable Technologies for Flexible Operation of Conventional Power Plants. EPSRC
£9,722,200
Sept. 15, 2013 March 14, 2019 Closed
56 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC
£2,449,800
March 1, 2022 May 30, 2025 Active
57 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC
£6,124,500
May 31, 2022 May 31, 2025 Active
58 On line and global structural health monitoring of high temperature steam lines EPSRC
£847,680
Aug. 31, 2013 Nov. 30, 2016 Closed
59 An Experimental and Modelling study of the Evolution of Inelastic Strain and its Implications to Re-crystallisation in Single Crystal Turbine Blades EPSRC
£0
March 31, 2019 Sept. 29, 2020 Closed
60 Environmental Crack Growth of Structural Materials in Pressurised Gas (ENCAMP) Innovate UK
£567,968
Feb. 1, 2018 Oct. 31, 2019 Closed
Reset