Home Projects More like: Modelling the geological factors in pipe failure for better infrastructure management [Clear] # Title Funder Funding Start End Status 41 Micronutrient and pollution transfer in East African lake catchments: impacts on the food-water-energy security nexus NERC £0 Sept. 30, 2019 May 31, 2023 Closed 42 Smart pipes for sustainable infrastructure innovation Innovate UK £451,108 Sept. 30, 2020 Aug. 30, 2021 Closed 43 Control of biofouling in water pipes using guided waves EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 44 CO2 Aquifer Storage Site Evaluation and Monitoring ( CASSEM ) EPSRC £3,597,110 July 31, 2008 Jan. 31, 2011 Closed 45 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £679,558 April 30, 2009 Nov. 30, 2012 Closed 46 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £133,878 April 30, 2009 Nov. 30, 2012 Closed 47 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £439,862 Jan. 1, 2009 Oct. 31, 2012 Closed 48 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,698,895 April 30, 2009 Nov. 30, 2012 Closed 49 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,099,655 Jan. 1, 2009 Oct. 31, 2012 Closed 50 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £334,695 April 30, 2009 Nov. 30, 2012 Closed 51 Self-Powered IoT Water Distribution Monitoring System Innovate UK £100,000 Sept. 30, 2022 March 30, 2023 Active 52 Exploring the unintended consequences of zerodeforestation oil palm NERC £0 Sept. 30, 2022 March 30, 2026 Active 53 Advanced Materials and Manufacture of High Voltage AC and DC Power Cables for Deepwater Offshore Wind Applications Innovate UK £339,241 Dec. 1, 2022 Nov. 30, 2024 Active 54 Advanced Materials and Manufacture of High Voltage AC and DC Power Cables for Deepwater Offshore Wind Applications Innovate UK £1,696,205 Dec. 1, 2022 Nov. 30, 2024 Active 55 iFuelActive - Smart diesel fuel solutions for the low carbon transition. Innovate UK £697,548 June 30, 2020 June 29, 2021 Closed 56 iFuelActive - A smart, cloud-connected, diesel fuel solution that will capture operational economies for end-users and support the transition to a low-carbon industry Innovate UK £698,626 June 30, 2021 June 29, 2022 Closed 57 Infrared emission from the quenching of electronically excited states EPSRC £676,560 Dec. 1, 2014 Nov. 30, 2017 Closed 58 Infrared emission from the quenching of electronically excited states EPSRC £1,691,400 Dec. 1, 2014 Nov. 30, 2017 Closed 59 Using Data Science to Improve Asset Resilience and Environmental Performance Innovate UK £46,921 Nov. 1, 2022 March 30, 2023 Active 60 Non Steady Analytical Models for Energy Pile Testing and Design EPSRC £199,538 Dec. 1, 2016 Sept. 13, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »