Home Projects More like: Modelling the geological factors in pipe failure for better infrastructure management [Clear] # Title Funder Funding Start End Status 21 Impact of hydraulic fracturing in the overburden of shale resource plays: Process-based evaluation (SHAPE-UK) NERC £840,975 Aug. 30, 2018 Aug. 30, 2023 Closed 22 4D-Printed MEMS Energy Harvesting and Wireless Power Transfer EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 23 Using simple spectral technology to engage farmers in building soil health NERC £0 Sept. 30, 2021 March 19, 2025 Active 24 NaREC Site Infrastructure Innovate UK £4,900,000 Jan. 1, 2011 April 29, 2013 Closed 25 NaREC Site Infrastructure Innovate UK £12,250,000 Jan. 1, 2011 April 30, 2013 Closed 26 UNION (Ultrasonic Nuclear InspectiON) Innovate UK £3,934,675 March 31, 2015 March 31, 2018 Closed 27 Climate-change effects on the performance of bioengineered clay fill embankments EPSRC £199,284 Nov. 7, 2016 May 5, 2018 Closed 28 Offshore Cable Burial: How deep is deep enough? EPSRC £781,144 Feb. 14, 2022 Aug. 12, 2025 Active 29 Offshore Cable Burial: How deep is deep enough? EPSRC £578,838 Sept. 30, 2021 Aug. 30, 2025 Active 30 Offshore Cable Burial: How deep is deep enough? EPSRC £928,624 Sept. 30, 2021 Sept. 29, 2025 Active 31 Offshore Cable Burial: How deep is deep enough? EPSRC £2,321,560 March 31, 2022 Sept. 30, 2025 Active 32 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 33 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 34 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 35 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 36 Carbon Emissions under Arctic Snow (CEAS) NERC £167,166 July 31, 2021 July 30, 2023 Active 37 Cable Extraction Innovate UK £183,158 Dec. 1, 2013 Nov. 30, 2014 Closed 38 In-Situ Test of High Temperature Pipes in Nuclear Power Plant (UltraHotTest) Innovate UK £96,200 Nov. 1, 2016 Jan. 31, 2017 Closed 39 In-Situ Test of High Temperature Pipes in Nuclear Power Plant (UltraHotTest) Innovate UK £240,500 Nov. 1, 2016 Jan. 31, 2017 Closed 40 Micronutrient and pollution transfer in East African lake catchments: impacts on the food-water-energy security nexus NERC £0 Sept. 30, 2019 May 30, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »