Home Projects More like: Premium upgraded Biomass Solid Fuels - Fundamentals of torrefaction and performance of torrefied fuels [Clear] # Title Funder Funding Start End Status 1 Premium upgraded Biomass Solid Fuels - Fundamentals of torrefaction and performance of torrefied fuels EPSRC £3,000,095 Sept. 30, 2010 June 30, 2014 Closed 2 The Feasibility of Using Microwave Induced Plasma Torrefaction for the Production of an Energy Dense, Carbon Neutral Fuel from Wood Pellets EPSRC £168,250 Feb. 4, 2014 Feb. 3, 2015 Closed 3 The Feasibility of Using Microwave Induced Plasma Torrefaction for the Production of an Energy Dense, Carbon Neutral Fuel from Wood Pellets EPSRC £420,625 Feb. 4, 2014 Feb. 3, 2015 Closed 4 Technical evaluation of using torrified biomass from the "Rotawave" process to economically reduce carbon output from coal-fired power generation Innovate UK £136,816 May 31, 2012 March 31, 2013 Closed 5 Technical evaluation of using torrified biomass from the "Rotawave" process to economically reduce carbon output from coal-fired power generation Innovate UK £342,040 May 31, 2012 March 31, 2013 Closed 6 Optimisation of Biomass/Coal Co-Firing Processes through Integrated Measurement and Computational Modelling EPSRC £721,162 Aug. 31, 2008 Dec. 31, 2011 Closed 7 Optimisation of Biomass/Coal Co-Firing Processes through Integrated Measurement and Computational Modelling EPSRC £803,112 Aug. 31, 2008 Dec. 31, 2011 Closed 8 Optimisation of Biomass/Coal Co-Firing Processes through Integrated Measurement and Computational Modelling EPSRC £177,628 Oct. 15, 2008 Oct. 14, 2011 Closed 9 Optimisation of Biomass/Coal Co-Firing Processes through Integrated Measurement and Computational Modelling EPSRC £2,007,780 Aug. 31, 2008 Dec. 31, 2011 Closed 10 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £3,627,210 Dec. 1, 2009 Jan. 10, 2011 Closed 11 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £2,968,295 Feb. 1, 2011 Aug. 15, 2014 Closed 12 Laminar Burning Velocity Measurements Over Wide-Ranging Temperatures and Pressures for Renewable and Conventional Fuels EPSRC £278,372 Nov. 1, 2010 June 29, 2014 Closed 13 Bulk Use of Biomass and Co-fired Ash in Novel Binders NERC £141,106 April 21, 2013 Oct. 20, 2013 Closed 14 Bulk Use of Biomass and Co-fired Ash in Novel Binders NERC £352,765 April 21, 2013 Oct. 21, 2013 Closed 15 Newton Bhabha Industrial Waste: Valorising Waste from Sugar Cane Industries via Innovations in Pretreatment, Biotransformation and Intensification BBSRC £2,024,962 Aug. 27, 2018 March 30, 2022 Closed 16 Investigating Corrosion in Supercritical Fluids EPSRC £565,452 Sept. 10, 2019 March 10, 2023 Active 17 Investigating Corrosion in Supercritical Fluids EPSRC £1,413,630 Sept. 10, 2019 March 10, 2023 Closed 18 Development and Evaluation of Sustainable Technologies for Flexible Operation of Conventional Power Plants. EPSRC £3,888,880 Sept. 15, 2013 March 14, 2019 Closed 19 Development and Evaluation of Sustainable Technologies for Flexible Operation of Conventional Power Plants. EPSRC £9,722,200 Sept. 15, 2013 March 14, 2019 Closed 20 Maximising the Carbon Impact of Wind Power EPSRC £471,480 Nov. 1, 2015 April 29, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »