# Title Funder Funding Start End Status
61 Nano-structured Catalysts for CO2 Transformation to Fuels and Products EPSRC
£7,440,825
April 30, 2013 April 30, 2017 Closed
62 Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing EPSRC
£2,320,158
March 31, 2016 March 30, 2022 Closed
63 Increasing the early age strength of High Volume Fly Ash (HVFA) concrete EPSRC
£195,514
Sept. 9, 2012 March 9, 2015 Closed
64 Ultra-high voltage (>30KV) power devices through superior materials for HVDC transmission EPSRC
£1,453,046
June 30, 2017 Jan. 20, 2021 Closed
65 Ultra-high voltage (>30KV) power devices through superior materials for HVDC transmission EPSRC
£3,632,615
June 30, 2017 Jan. 20, 2021 Closed
66 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC
£778,028
Jan. 1, 2012 June 29, 2015 Closed
67 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC
£1,945,070
Jan. 1, 2012 June 30, 2015 Closed
68 SBRC NOTTINGHAM: Sustainable Routes to Platform Chemicals BBSRC
£28,485,710
July 30, 2014 March 30, 2022 Closed
69 Study of Novel Biofuels from Biomass - Methyl-Furans (MF) EPSRC
£1,863,208
April 30, 2016 Oct. 31, 2019 Closed
70 Study of Novel Biofuels from Biomass - Methyl-Furans (MF) EPSRC
£4,658,020
April 30, 2016 Oct. 31, 2019 Closed
71 Novel low energy plasma/catalytic gas cleaning process to deliver high quality syngas from the gasification of waste biomass EPSRC
£1,823,078
Jan. 1, 2015 Aug. 30, 2018 Closed
72 A Multiscale Simulation Approach to Tackle Fuel Spray Atomisation and Combustion EPSRC
£295,917
March 24, 2014 March 23, 2015 Closed
73 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC
£483,202
Aug. 31, 2014 Aug. 30, 2017 Closed
74 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC
£1,208,005
Aug. 31, 2014 Aug. 31, 2017 Closed
Reset