Home Projects More like: Scaling a Mixed-Feedback Approach to Controlling Neuromorphic Circuits [Clear] # Title Funder Funding Start End Status 81 Power-Adaptive Computing: Run-Time Management Design on FPGA SoC Devices EPSRC £0 Sept. 30, 2017 Nov. 30, 2021 Closed 82 Power-Adaptive Computing: Run-Time Management Design on FPGA SoC Devices EPSRC, NERC £0 Sept. 30, 2017 Nov. 30, 2021 Closed 83 Development of cryo-CMOS to enable the next generation of scalable quantum computers Innovate UK £4,846,790 Nov. 1, 2021 Oct. 31, 2024 Active 84 Expanding Measurement Range of Distributed Photonic Sensors for Holistic Power Grid Management (EMERGE) Innovate UK £394,342 Aug. 31, 2022 Oct. 31, 2023 Active 85 Expanding Measurement Range of Distributed Photonic Sensors for Holistic Power Grid Management (EMERGE) Innovate UK £1,971,710 Aug. 31, 2022 Oct. 31, 2023 Active 86 Novel High Performance Wave Energy Converters with advanced control, reliability and survivability systems through machine-learning forecasting EPSRC £4,054,500 July 31, 2021 Sept. 30, 2024 Active 87 Optimal control with application to passive and renewable energy systems EPSRC £0 Sept. 30, 2020 Aug. 31, 2024 Active 88 Elucidating early stage ALS pathomecanisms that drive mitochondrial dysfunction MRC £1,701,162 Jan. 1, 2020 May 6, 2023 Active 89 Elucidating early stage ALS pathomecanisms that drive mitochondrial dysfunction MRC £4,252,905 Jan. 1, 2020 May 7, 2023 Closed 90 Integrated Functional Materials for System-in-Package Applications EPSRC £991,072 Aug. 31, 2006 Feb. 28, 2010 Closed 91 Integrated Functional Materials for System-in-Package Applications EPSRC £855,746 Sept. 30, 2006 March 30, 2010 Closed 92 Integrated Functional Materials for System-in-Package Applications EPSRC £848,684 Oct. 4, 2006 April 3, 2010 Closed 93 Integrated Functional Materials for System-in-Package Applications EPSRC £2,121,710 Oct. 4, 2006 April 4, 2010 Closed 94 Integrated Functional Materials for System-in-Package Applications EPSRC £2,477,680 Aug. 31, 2006 Feb. 28, 2010 Closed 95 Integrated Functional Materials for System-in-Package Applications EPSRC £2,139,365 Sept. 30, 2006 March 31, 2010 Closed 96 Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation EPSRC £735,060 Jan. 1, 2020 Dec. 31, 2023 Active 97 Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation EPSRC £1,837,650 Jan. 1, 2020 Dec. 31, 2023 Active 98 The applicability of grey-box performance-based modelling techniques in existing office buildings in the UK EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 99 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £200,696 Dec. 1, 2016 March 30, 2018 Closed 100 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £501,740 Dec. 1, 2016 March 31, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »