Home Projects More like: Scaling a Mixed-Feedback Approach to Controlling Neuromorphic Circuits [Clear] # Title Funder Funding Start End Status 41 Realistic fault modelling to enable optimization of low power IoT and Cognitive fault-tolerant computing systems EPSRC £892,480 Jan. 1, 2021 Dec. 31, 2023 Active 42 Converter Architectures EPSRC £2,518,800 Nov. 1, 2017 Oct. 30, 2021 Closed 43 Converter Architectures EPSRC £6,297,000 Nov. 1, 2017 Oct. 31, 2021 Closed 44 An investigation of the bidirectional relationship between tau protein propagation and neural circuit activity in mouse models of Alzheimer's disease MRC £0 Sept. 26, 2021 Sept. 29, 2025 Active 45 Robust Formal Verification and Synthesis of Cyber-Physical Systems EPSRC £0 Jan. 10, 2022 July 8, 2025 Active 46 DC-DC Converter control board Innovate UK £182,946 Dec. 1, 2014 Feb. 28, 2017 Closed 47 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £217,650 Sept. 30, 2007 Dec. 31, 2008 Closed 48 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £161,474 Sept. 30, 2007 Dec. 31, 2008 Closed 49 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £403,685 Sept. 30, 2007 Dec. 31, 2008 Closed 50 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £544,125 Sept. 30, 2007 Dec. 31, 2008 Closed 51 Energy Harvesting Triboelectric Nano-Generators for the Internet-of-Things EPSRC £1,265,252 Aug. 31, 2019 Aug. 30, 2023 Active 52 Energy Harvesting Triboelectric Nano-Generators for the Internet-of-Things EPSRC £3,163,130 Aug. 31, 2019 Aug. 31, 2024 Active 53 P3TC Innovate UK £188,892 March 1, 2012 Aug. 30, 2013 Closed 54 Metal Oxide RF Integrated Circuits for Internet of Things Connectivity EPSRC £0 Sept. 26, 2018 Dec. 31, 2021 Closed 55 Flexible Hybrid Electronics (FHE) for robotic skin applications EPSRC £0 Aug. 31, 2019 Sept. 29, 2023 Active 56 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £591,264 Dec. 15, 2014 April 29, 2018 Closed 57 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £1,478,160 Dec. 15, 2014 April 30, 2018 Closed 58 Optimisation of WBG power converters to reduce EMI EPSRC £0 Sept. 19, 2021 Sept. 29, 2025 Active 59 Optimisation of WBG power converters to reduce EMI EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 60 Analysis of mitochondrial homeostasis in ageing and neurodegeneration MRC £1,682,908 Aug. 31, 2015 Feb. 28, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »