# Title Funder Funding Start End Status
61 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£1,698,895
April 30, 2009 Nov. 30, 2012 Closed
62 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£1,099,655
Jan. 1, 2009 Oct. 31, 2012 Closed
63 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£334,695
April 30, 2009 Nov. 30, 2012 Closed
64 The creation of localized current and future weather for the built environment EPSRC
£1,229,256
Aug. 31, 2015 Aug. 30, 2019 Closed
65 The creation of localized current and future weather for the built environment EPSRC
£471,008
Aug. 31, 2015 Aug. 30, 2019 Closed
66 The creation of localized current and future weather for the built environment EPSRC
£303,508
Aug. 31, 2015 Aug. 30, 2018 Closed
67 The creation of localized current and future weather for the built environment EPSRC
£3,073,140
Aug. 31, 2015 Aug. 31, 2019 Closed
68 A Simulation-based Optimisation Tool for the Minimisation of Building Carbon Emissions and Water Usage Innovate UK
£878,924
June 30, 2010 Aug. 30, 2012 Closed
69 Active-LIVing Envelopes (ALIVE) EPSRC
£200,552
March 31, 2016 Nov. 30, 2017 Closed
70 Active-LIVing Envelopes (ALIVE) EPSRC
£501,380
March 31, 2016 Nov. 30, 2017 Closed
71 Integrated Carbon, Waste and Cost Modelling for Design of Low Impact Buildings EPSRC
£298,832
Feb. 1, 2010 Jan. 31, 2012 Closed
72 Refresh: Remodeling Building Design Sustainability from a Human Centered Approach EPSRC
£3,388,700
June 30, 2013 Sept. 30, 2019 Closed
73 Industrial Doctorate Centre: Technologies for Sustainable Built Environments EPSRC
£11,952,930
Sept. 30, 2009 March 30, 2018 Closed
74 Industrial Doctorate Centre: Technologies for Sustainable Built Environments EPSRC
£29,882,325
Sept. 30, 2009 March 31, 2018 Closed
75 Nowcasting the risks of wildfire NERC
£0
Sept. 30, 2021 Sept. 29, 2024 Active
76 Flexibility from Cooling and Storage (Flex-Cool-Store) EPSRC
£2,227,836
Sept. 27, 2021 Sept. 26, 2024 Active
77 Flexibility from Cooling and Storage (Flex-Cool-Store) EPSRC
£5,569,590
Sept. 27, 2021 Sept. 27, 2024 Active
78 Urban Climate and Energy System Resilience and Adaptability EPSRC
£0
Sept. 25, 2022 Sept. 24, 2026 Active
79 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC
£3,231,690
Oct. 2, 2022 Oct. 1, 2025 Active
80 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC
£16,158,450
Oct. 2, 2022 Oct. 2, 2025 Active
Reset