Home Projects More like: Decision support for building adaptation in a low-carbon climate change future [Clear] # Title Funder Funding Start End Status 61 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,698,895 April 30, 2009 Nov. 30, 2012 Closed 62 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,099,655 Jan. 1, 2009 Oct. 31, 2012 Closed 63 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £334,695 April 30, 2009 Nov. 30, 2012 Closed 64 The creation of localized current and future weather for the built environment EPSRC £1,229,256 Aug. 31, 2015 Aug. 30, 2019 Closed 65 The creation of localized current and future weather for the built environment EPSRC £471,008 Aug. 31, 2015 Aug. 30, 2019 Closed 66 The creation of localized current and future weather for the built environment EPSRC £303,508 Aug. 31, 2015 Aug. 30, 2018 Closed 67 The creation of localized current and future weather for the built environment EPSRC £3,073,140 Aug. 31, 2015 Aug. 31, 2019 Closed 68 A Simulation-based Optimisation Tool for the Minimisation of Building Carbon Emissions and Water Usage Innovate UK £878,924 June 30, 2010 Aug. 30, 2012 Closed 69 Active-LIVing Envelopes (ALIVE) EPSRC £200,552 March 31, 2016 Nov. 30, 2017 Closed 70 Active-LIVing Envelopes (ALIVE) EPSRC £501,380 March 31, 2016 Nov. 30, 2017 Closed 71 Integrated Carbon, Waste and Cost Modelling for Design of Low Impact Buildings EPSRC £298,832 Feb. 1, 2010 Jan. 31, 2012 Closed 72 Refresh: Remodeling Building Design Sustainability from a Human Centered Approach EPSRC £3,388,700 June 30, 2013 Sept. 30, 2019 Closed 73 Industrial Doctorate Centre: Technologies for Sustainable Built Environments EPSRC £11,952,930 Sept. 30, 2009 March 30, 2018 Closed 74 Industrial Doctorate Centre: Technologies for Sustainable Built Environments EPSRC £29,882,325 Sept. 30, 2009 March 31, 2018 Closed 75 Nowcasting the risks of wildfire NERC £0 Sept. 30, 2021 Sept. 29, 2024 Active 76 Flexibility from Cooling and Storage (Flex-Cool-Store) EPSRC £2,227,836 Sept. 27, 2021 Sept. 26, 2024 Active 77 Flexibility from Cooling and Storage (Flex-Cool-Store) EPSRC £5,569,590 Sept. 27, 2021 Sept. 27, 2024 Active 78 Urban Climate and Energy System Resilience and Adaptability EPSRC £0 Sept. 25, 2022 Sept. 24, 2026 Active 79 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC £3,231,690 Oct. 2, 2022 Oct. 1, 2025 Active 80 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC £16,158,450 Oct. 2, 2022 Oct. 2, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »