Home Projects More like: Decision support for building adaptation in a low-carbon climate change future [Clear] # Title Funder Funding Start End Status 21 Evaluating the potential of coupling the sunlight beam index with lumped parameter modelling in low energy building design EPSRC £0 Sept. 30, 2016 March 30, 2020 Closed 22 Evaluating the potential of coupling the sunlight beam index with lumped parameter modelling in low energy building design EPSRC £0 Sept. 30, 2016 March 31, 2020 Closed 23 Utilising In-Use Data to Reduce Costs, Decarbonise, Verify Build Quality and Ensure Healthy Buildings Innovate UK £107,880 March 31, 2023 June 30, 2023 Closed 24 Low carbon climate-responsive Heating and Cooling of Cities (LoHCool) EPSRC £1,597,972 Sept. 30, 2015 March 31, 2019 Closed 25 Low carbon climate-responsive Heating and Cooling of Cities (LoHCool) EPSRC £3,994,930 Sept. 30, 2015 March 31, 2019 Closed 26 Adaptation and Resilience to a Changing Climate (ARCC) - Coordination Network (ACN) EPSRC £4,077,020 Jan. 1, 2009 Jan. 31, 2014 Closed 27 Global Home Pilot Demonstrator Innovate UK £7,671,148 March 31, 2020 Sept. 29, 2022 Active 28 The applicability of grey-box performance-based modelling techniques in existing office buildings in the UK EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 29 Developing better outputs from building thermal simulation tools to improve decision making in the design of low energy buildings EPSRC £198,246 Aug. 31, 2012 Nov. 30, 2013 Closed 30 Developing better outputs from building thermal simulation tools to improve decision making in the design of low energy buildings EPSRC £495,615 Aug. 31, 2012 Nov. 30, 2013 Closed 31 Building as a Power Plant: The use of buildings to provide demand response EPSRC £334,176 July 31, 2017 March 31, 2019 Closed 32 Building as a Power Plant: The use of buildings to provide demand response EPSRC £835,440 July 31, 2017 March 31, 2019 Closed 33 Avoiding dangerous climate change: analysis with an integrated assessment model NERC £2,291,815 Jan. 1, 2009 Dec. 31, 2013 Closed 34 Multi-objective performance-based design of tall buildings using energy harvesting enabled tuned mass-damper-inerter (TMDI) devices EPSRC £1,253,690 Jan. 1, 2015 Sept. 30, 2017 Closed 35 UK participation in IEA EBC Annex 79: Occupant behaviour-centric building design and operation EPSRC £132,475 Sept. 7, 2019 Sept. 7, 2024 Active 36 Energy efficient bio-based natural fibre insulation Innovate UK £1,953,395 Aug. 31, 2008 Feb. 29, 2012 Closed 37 Characterising the influence of stakeholders on building energy consumption. ESRC £0 April 30, 2019 Aug. 30, 2022 Active 38 EcoWatt2050 EPSRC £1,895,310 March 1, 2014 Oct. 31, 2017 Closed 39 EcoWatt2050 EPSRC £4,738,275 March 1, 2014 Oct. 31, 2017 Closed 40 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC £201,240 Nov. 1, 2012 April 29, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »