Home Projects More like: University College London and FCB Studios Limited [Clear] # Title Funder Funding Start End Status 1 A Simulation-based Optimisation Tool for the Minimisation of Building Carbon Emissions and Water Usage EPSRC £362,332 Aug. 26, 2010 Aug. 25, 2012 Closed 2 Design 4.0: Pedagogic best practice for technology-driven design futures ESRC £83,368 Feb. 1, 2022 July 30, 2023 Active 3 Design 4.0: Pedagogic best practice for technology-driven design futures FIC £208,420 Feb. 1, 2022 Dec. 31, 2023 Active 4 A Simulation-based Optimisation Tool for the Minimisation of Building Carbon Emissions and Water Usage Innovate UK £878,924 June 30, 2010 Aug. 30, 2012 Closed 5 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £400,894 Oct. 2, 2016 Oct. 1, 2018 Closed 6 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £1,002,235 Oct. 2, 2016 Oct. 2, 2018 Closed 7 Design Mining: A Microbial Fuel Cell Pilot Study EPSRC £596,866 Aug. 31, 2015 Nov. 7, 2017 Closed 8 Design Mining: A Microbial Fuel Cell Pilot Study EPSRC £1,492,165 Aug. 31, 2015 Nov. 7, 2017 Closed 9 Low Energy and Sustainable Solutions Online kNowledge System (LESSONS) Innovate UK £673,680 March 31, 2010 March 31, 2013 Closed 10 Carbon Lite - holistic low carbon design tool EPSRC £255,568 Sept. 23, 2007 Feb. 23, 2010 Closed 11 Carbon Lite - holistic low carbon design tool EPSRC £638,920 Sept. 23, 2007 Feb. 23, 2010 Closed 12 UK DESIGN: NET ZERO AHRC £33,384 July 19, 2020 Jan. 19, 2021 Closed 13 Designing actively robust products with Bayesian Optimisation EPSRC £0 Sept. 26, 2021 Sept. 29, 2025 Active 14 Designing actively robust products with Bayesian Optimisation EPSRC £0 Oct. 3, 2021 Dec. 30, 2025 Active 15 Development of machine learning approaches to geotechnical design of marine renewable energy foundations EPSRC £0 Sept. 30, 2021 March 31, 2025 Active 16 CarbonCounter Innovate UK £814,940 March 1, 2010 Aug. 30, 2013 Closed 17 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £1,568,907 Nov. 1, 2021 Oct. 31, 2024 Active 18 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £691,414 Oct. 3, 2021 Oct. 2, 2024 Active 19 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £266,638 Aug. 31, 2021 Aug. 30, 2024 Active 20 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £2,025,440 Jan. 1, 2023 Jan. 31, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »