# Title Funder Funding Start End Status
1 A Simulation-based Optimisation Tool for the Minimisation of Building Carbon Emissions and Water Usage EPSRC
£362,332
Aug. 26, 2010 Aug. 25, 2012 Closed
2 Design 4.0: Pedagogic best practice for technology-driven design futures ESRC
£83,368
Feb. 1, 2022 July 30, 2023 Active
3 Design 4.0: Pedagogic best practice for technology-driven design futures FIC
£208,420
Feb. 1, 2022 Dec. 31, 2023 Active
4 A Simulation-based Optimisation Tool for the Minimisation of Building Carbon Emissions and Water Usage Innovate UK
£878,924
June 30, 2010 Aug. 30, 2012 Closed
5 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC
£400,894
Oct. 2, 2016 Oct. 1, 2018 Closed
6 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC
£1,002,235
Oct. 2, 2016 Oct. 2, 2018 Closed
7 Design Mining: A Microbial Fuel Cell Pilot Study EPSRC
£596,866
Aug. 31, 2015 Nov. 7, 2017 Closed
8 Design Mining: A Microbial Fuel Cell Pilot Study EPSRC
£1,492,165
Aug. 31, 2015 Nov. 7, 2017 Closed
9 Low Energy and Sustainable Solutions Online kNowledge System (LESSONS) Innovate UK
£673,680
March 31, 2010 March 31, 2013 Closed
10 Carbon Lite - holistic low carbon design tool EPSRC
£255,568
Sept. 23, 2007 Feb. 23, 2010 Closed
11 Carbon Lite - holistic low carbon design tool EPSRC
£638,920
Sept. 23, 2007 Feb. 23, 2010 Closed
12 UK DESIGN: NET ZERO AHRC
£33,384
July 19, 2020 Jan. 19, 2021 Closed
13 Designing actively robust products with Bayesian Optimisation EPSRC
£0
Sept. 26, 2021 Sept. 29, 2025 Active
14 Designing actively robust products with Bayesian Optimisation EPSRC
£0
Oct. 3, 2021 Dec. 30, 2025 Active
15 Development of machine learning approaches to geotechnical design of marine renewable energy foundations EPSRC
£0
Sept. 30, 2021 March 31, 2025 Active
16 CarbonCounter Innovate UK
£814,940
March 1, 2010 Aug. 30, 2013 Closed
17 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£1,568,907
Nov. 1, 2021 Oct. 31, 2024 Active
18 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£691,414
Oct. 3, 2021 Oct. 2, 2024 Active
19 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£266,638
Aug. 31, 2021 Aug. 30, 2024 Active
20 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£2,025,440
Jan. 1, 2023 Jan. 31, 2025 Active
Reset