Home Projects More like: University College London and FCB Studios Limited [Clear] # Title Funder Funding Start End Status 61 Novel design of SWATH vessel for the storage of hydrogen tanks and powertrain Innovate UK £49,548 Nov. 1, 2022 April 29, 2023 Active 62 Project 11 Core Demonstrator Concept Innovate UK £23,861,703 Sept. 30, 2013 March 30, 2015 Closed 63 Turbocharger Aero-thermal Design Optimisation under Realistic Engine Conditions for Low Carbon Vehicles EPSRC £197,588 Nov. 30, 2014 Jan. 29, 2016 Closed 64 EPSRC Centre for Innovative Manufacturing in Through-life Engineering Services EPSRC £11,668,788 July 11, 2011 July 10, 2016 Closed 65 Sea Bed Sampler Innovate UK £72,410 May 31, 2015 Nov. 30, 2015 Closed 66 Zhyphen EVolution Charging Hub (ZEVCH) Innovate UK £632,330 July 31, 2021 March 30, 2022 Closed 67 UK Design for Additive Manufacturing Network EPSRC £236,040 Sept. 30, 2020 July 30, 2023 Active 68 High Voltage PEMD Training Portal Innovate UK £48,411 Sept. 30, 2022 Sept. 29, 2023 Active 69 High Voltage PEMD Training Portal ISCF £242,055 Sept. 30, 2022 Sept. 30, 2023 Closed 70 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses Innovate UK £1,433,670 March 1, 2019 Feb. 28, 2021 Closed 71 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses ISCF £3,584,175 March 1, 2019 Feb. 28, 2021 Closed 72 Power-Adaptive Computing: Run-Time Management Design on FPGA SoC Devices EPSRC £0 Sept. 30, 2017 Nov. 30, 2021 Closed 73 Power-Adaptive Computing: Run-Time Management Design on FPGA SoC Devices EPSRC, NERC £0 Sept. 30, 2017 Nov. 30, 2021 Closed 74 Energy, Technology, Behaviour, Culture and Regulation; The complex problems and transition engineering solutions for the future of local, sustainable NERC £0 Sept. 30, 2022 May 30, 2026 Active 75 Articulated Splined Couplings for Future Aero Gas-Turbine Engines EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 76 Exploration of bi-directional VETT configuration Innovate UK £336,318 March 31, 2015 April 29, 2016 Closed 77 Exploration of bi-directional VETT configuration Innovate UK £840,795 March 31, 2015 April 30, 2016 Closed 78 Dynamic Adaptation in Heterogeneous Multicore Embedded Processors EPSRC £2,435,114 Nov. 1, 2010 July 30, 2014 Closed 79 Instream Tidal Energy Research (InTER) Project Innovate UK £1,956,648 Aug. 31, 2017 Nov. 30, 2019 Closed 80 Resilient and Sustainable Infrastructure Systems Design and Analysis EPSRC £0 Nov. 12, 2019 May 11, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »