Home Projects More like: Feasibility of applying C-Capture process with low cost materials to reduce cost of biogas upgrading [Clear] # Title Funder Funding Start End Status 1 Biomethanisation of CO2 in anaerobic digestion plants EPSRC £3,705,134 June 30, 2015 Dec. 31, 2019 Closed 2 Biomethanisation of CO2 in anaerobic digestion plants EPSRC £9,262,835 June 30, 2015 Dec. 31, 2019 Closed 3 19-ERACoBioTech SYNBIOGAS: Synthetic landfill microbiomes for enhanced anaerobic digestion to biogas BBSRC £924,286 Jan. 1, 2020 June 29, 2023 Active 4 19-ERACoBioTech SYNBIOGAS: Synthetic landfill microbiomes for enhanced anaerobic digestion to biogas BBSRC £2,310,715 Jan. 1, 2020 Dec. 31, 2023 Active 5 Sustainable Transformation and Recovery of Energy and Ammonia using Membrane Crystallisation (STREAM-C) UKRI £129,270 Nov. 1, 2022 April 29, 2024 Active 6 Integrated biological approaches for high-grade biomethane vehicle fuel production from food waste BBSRC £812,778 June 30, 2022 June 29, 2025 Active 7 Integrated biological approaches for high-grade biomethane vehicle fuel production from food waste BBSRC £2,031,945 June 30, 2022 June 30, 2025 Active 8 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK £99,400 Feb. 1, 2013 May 30, 2013 Closed 9 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK £248,500 Feb. 1, 2013 May 31, 2013 Closed 10 Design of a liquid-piston compressor for raw-wet-biogas to produce biomethane for vehicles and back up power. Innovate UK £139,292 May 31, 2018 Nov. 30, 2019 Closed 11 Design of a liquid-piston compressor for raw-wet-biogas to produce biomethane for vehicles and back up power. Innovate UK £348,230 May 31, 2018 Nov. 30, 2019 Closed 12 RNG Production Cost Reduction due to Methane Enhancement Generation by Microbial Communities Innovate UK £88,720 Nov. 1, 2021 March 30, 2022 Closed 13 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £798,210 Aug. 31, 2013 June 29, 2017 Closed 14 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £1,995,525 Aug. 31, 2013 June 30, 2017 Closed 15 Sustainable gas pathways for Brazil; from microcosm to macrocosm NERC £1,972,666 April 30, 2016 Oct. 31, 2019 Closed 16 Delivering Low Carbon Anaerobic Wastewater Treatment and Renewable Energy Production EPSRC £398,214 March 31, 2008 Sept. 29, 2009 Closed 17 Delivering Low Carbon Anaerobic Wastewater Treatment and Renewable Energy Production EPSRC £995,535 March 31, 2008 Sept. 30, 2009 Closed 18 Optimisation of micro biogas upgrading system Innovate UK £10,000 July 31, 2014 Jan. 31, 2015 Closed 19 Carbon Capture Porous Liquids in Blue Hydrogen Production - Reducing Energy and Cost Innovate UK £48,232 Nov. 1, 2022 April 29, 2023 Active 20 Investigation of control and on-line optimisation opportunities of a waste-water treatment plant EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »