Home Projects More like: Feasibility of applying C-Capture process with low cost materials to reduce cost of biogas upgrading [Clear] # Title Funder Funding Start End Status 21 Investigation of control and on-line optimisation opportunities of a waste-water treatment plant EPSRC £0 Sept. 30, 2017 Sept. 30, 2021 Closed 22 Novel purification technology for biogas from anaerobic digestion Innovate UK £193,424 Sept. 30, 2013 Dec. 31, 2014 Closed 23 Digital twinning of an innovative low head, low cost hydro mini grid generator Innovate UK £49,982 Nov. 1, 2022 March 30, 2023 Active 24 Improving Gas Network Infrastructure Planning Innovate UK £392,834 June 30, 2017 March 31, 2019 Closed 25 Improving Gas Network Infrastructure Planning ISCF £982,085 June 30, 2017 March 31, 2019 Closed 26 A pre-treatment technique for improving anaerobic digestion hydrolysis, to increase energy output by 20% and achieve 2x throughput Innovate UK £137,426 July 31, 2018 July 30, 2019 Closed 27 A novel AD fermenter to increase energy output by 20% and improve throughput by 3x to improve AD profitability and productivity Innovate UK £139,342 Dec. 1, 2018 Nov. 30, 2019 Closed 28 A novel AD fermenter to increase energy output by 20% and improve throughput by 3x to improve AD profitability and productivity Innovate UK £348,355 Dec. 1, 2018 Nov. 30, 2019 Closed 29 A pre-treatment technique for improving anaerobic digestion hydrolysis, to increase energy output by 20% and achieve 2x throughput Innovate UK £343,565 July 31, 2018 July 31, 2019 Closed 30 Sustainable renewable energy VALUE chains for answering FARMers’ needs (VALUE4FARM) Horizon Europe Guarantee £2,794,565 Aug. 31, 2023 Feb. 28, 2027 Active 31 Biotech - Aerofilter for small scale anaerobic digestion plants Innovate UK £49,386 Dec. 1, 2012 March 31, 2013 Closed 32 Recovery and re-use of energy, water and nutrients from waste in the food chain (Redivivus) EPSRC £745,146 Dec. 31, 2014 Dec. 31, 2018 Closed 33 Recovery and re-use of energy, water and nutrients from waste in the food chain (Redivivus) EPSRC £1,862,865 Dec. 31, 2014 Dec. 31, 2018 Closed 34 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £2,594,834 Sept. 30, 2020 Sept. 29, 2024 Active 35 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £6,487,085 Sept. 30, 2020 Sept. 30, 2024 Active 36 Enhancing the Methane Generation from Food Waste Anaerobic Digestion Mediated by Fluidic Oscillator Generated Microbubbles EPSRC £161,774 Feb. 20, 2017 Feb. 19, 2018 Closed 37 Enhancing the Methane Generation from Food Waste Anaerobic Digestion Mediated by Fluidic Oscillator Generated Microbubbles EPSRC £404,435 Feb. 20, 2017 Feb. 19, 2018 Closed 38 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded consumer packaging sector Innovate UK £5,542,770 March 1, 2022 Feb. 29, 2024 Active 39 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded food packaging sector Innovate UK £5,127,380 March 1, 2022 Feb. 29, 2024 Active 40 Robust Decentralised Low Energy Faecal Sludge Dewatering leading to Sanitation, Clean Water and Sustainable Energy Resource EPSRC £84,364 Feb. 1, 2017 April 29, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »