Home Projects More like: e-WaGS: Efficient Water Gas Shift Technology for Low-Carbon Electric Power Generation from Fossil Fuels [Clear] # Title Funder Funding Start End Status 1 Novel Pyro-Gasification Technology for Hydrogen Production from Solid Waste EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 2 Novel Pyro-Gasification Technology for Hydrogen Production from Solid Waste EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 3 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC £1,513,108 Jan. 1, 2013 Oct. 31, 2016 Closed 4 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC £3,782,770 Jan. 1, 2013 Oct. 31, 2016 Closed 5 Clean Coal Technology: A Novel Process for the Combustion of Coal Using an Oxygen Carrier EPSRC £521,522 April 16, 2006 Oct. 15, 2009 Closed 6 Clean Coal Technology: A Novel Process for the Combustion of Coal Using an Oxygen Carrier EPSRC £1,303,805 April 16, 2006 Oct. 16, 2009 Closed 7 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £2,904,795 Jan. 30, 2013 Sept. 11, 2015 Closed 8 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £1,135,455 Sept. 11, 2015 Nov. 11, 2017 Closed 9 Redefining power generation from carbonaceous fuels with carbonate looping combustion and gasification technologies EPSRC £314,424 July 31, 2017 June 29, 2019 Closed 10 Redefining power generation from carbonaceous fuels with carbonate looping combustion and gasification technologies EPSRC £786,060 July 31, 2017 June 30, 2019 Closed 11 Reactor design and performance optimisation for catalytic hydrogen production from methane EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 12 Distributed Hydrogen Production with Carbon Capture: A Novel Process for the Production of Hydrogen from Biomass EPSRC £351,698 Sept. 30, 2007 March 30, 2009 Closed 13 Novel Carrier Materials EPSRC £0 Sept. 22, 2019 April 29, 2023 Active 14 Novel Carrier Materials EPSRC, NERC £0 Sept. 30, 2019 Oct. 21, 2023 Closed 15 Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing EPSRC £2,320,158 March 31, 2016 March 30, 2022 Closed 16 Novel thermodynamic cycles utilising waste BOS gas from an Integrated Steel Production Process Innovate UK £235,342 Feb. 1, 2014 Jan. 31, 2015 Closed 17 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £2,199,782 Dec. 1, 2014 May 30, 2018 Closed 18 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £5,499,455 Dec. 1, 2014 May 31, 2018 Closed 19 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC £778,028 Jan. 1, 2012 June 29, 2015 Closed 20 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC £1,945,070 Jan. 1, 2012 June 30, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »