Home Projects More like: e-WaGS: Efficient Water Gas Shift Technology for Low-Carbon Electric Power Generation from Fossil Fuels [Clear] # Title Funder Funding Start End Status 81 Advanced Surface Protection to Enable Carbon abatement Technologies (ASPECT) Innovate UK £6,464,610 Sept. 30, 2008 Sept. 30, 2012 Closed 82 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £2,066,770 March 31, 2015 Nov. 30, 2018 Closed 83 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £5,166,925 March 31, 2015 Nov. 30, 2018 Closed 84 CHROME – Clean Hydrogen Manufacture Innovate UK £364,527 June 30, 2022 June 29, 2023 Active 85 CHROME – Clean Hydrogen Manufacture Innovate UK £1,822,635 June 30, 2022 June 30, 2023 Closed 86 Hydrogen generation from biomass derived glycerol using sorption enhanced reaction processes EPSRC £540,636 Sept. 30, 2007 March 30, 2009 Closed 87 Hydrogen generation from biomass derived glycerol using sorption enhanced reaction processes EPSRC £1,351,590 Sept. 30, 2007 March 31, 2009 Closed 88 Electro-catalytic conversion of ammonia into hydrogen EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 89 Upgrading of bio-oil using novel catalysts EPSRC £0 Sept. 30, 2016 Sept. 29, 2019 Closed 90 Upgrading of bio-oil using novel catalysts EPSRC £0 Sept. 30, 2016 Sept. 30, 2019 Closed 91 Power to Liquids Research Facility EPSRC £8,872,785 Jan. 3, 2023 Jan. 2, 2027 Active 92 Oxide and chalcogenide MOCVD (metal-organic chemical vapour deposition) EPSRC £5,278,044 June 30, 2020 June 29, 2024 Active 93 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £845,452 Nov. 1, 2007 Oct. 30, 2010 Closed 94 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £2,113,630 Nov. 1, 2007 Oct. 31, 2010 Closed 95 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC £701,084 Aug. 25, 2020 Aug. 24, 2023 Active 96 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC £1,752,710 Aug. 25, 2020 Aug. 25, 2023 Closed 97 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £625,446 March 17, 2008 July 15, 2011 Closed 98 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £1,563,615 March 17, 2008 July 16, 2011 Closed 99 Next Generation Liquid Phase Biorefinery Catalysts EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 100 Next Generation Liquid Phase Biorefinery Catalysts EPSRC £0 Sept. 30, 2020 March 31, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »