Home Projects More like: Wake Properties Prediction by means of machine learning algorithms [Clear] # Title Funder Funding Start End Status 1 Wake Properties Prediction by means of machine learning algorithms EPSRC £0 Dec. 1, 2022 Nov. 30, 2026 Active 2 Wake Properties Prediction by means of machine learning algorithms EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Closed 3 Reliability-Oriented Assessment and Design Towards Energy system integration with offshore Renewables (ROADsTER) EPSRC £184,581 July 31, 2022 Jan. 31, 2024 Active 4 Reliability-Oriented Assessment and Design Towards Energy system integration with offshore Renewables (ROADsTER) EPSRC £922,905 Feb. 1, 2023 July 31, 2024 Active 5 SWEPT2 EPSRC £179,650 April 30, 2015 April 29, 2018 Closed 6 SWEPT2 EPSRC £449,125 April 30, 2015 April 30, 2018 Closed 7 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 8 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 9 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK £609,893 May 31, 2021 March 30, 2023 Active 10 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK £914,838 May 31, 2021 March 31, 2023 Closed 11 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £652,520 Jan. 5, 2009 July 3, 2012 Closed 12 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £1,631,300 Jan. 5, 2009 July 4, 2012 Closed 13 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 14 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 15 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience UKRI £2,755,446 Feb. 1, 2022 Jan. 31, 2026 Active 16 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience FLF £6,888,615 Feb. 1, 2022 Jan. 31, 2026 Active 17 SWEPT2 EPSRC £78,596 April 30, 2015 April 29, 2018 Closed 18 SWEPT2 EPSRC £196,490 April 30, 2015 April 30, 2018 Closed 19 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £2,953,388 Nov. 2, 2015 April 30, 2019 Closed 20 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £7,383,470 Nov. 2, 2015 May 1, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »