Home Projects More like: Wake Properties Prediction by means of machine learning algorithms [Clear] # Title Funder Funding Start End Status 21 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 30, 2025 Active 22 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 31, 2025 Active 23 Wind Turbine Integrated Lidar (WinTIL) Innovate UK £1,393,956 Sept. 30, 2015 March 30, 2017 Closed 24 Breakdown of helical vortices in wind farms EPSRC £196,818 Aug. 31, 2015 Sept. 10, 2016 Closed 25 Breakdown of helical vortices in wind farms EPSRC £69,672 Nov. 1, 2016 May 1, 2017 Closed 26 Breakdown of helical vortices in wind farms EPSRC £174,180 Nov. 1, 2016 May 2, 2017 Closed 27 Breakdown of helical vortices in wind farms EPSRC £492,045 Aug. 31, 2015 Sept. 11, 2016 Closed 28 Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) Innovate UK £349,122 March 1, 2014 Feb. 28, 2015 Closed 29 Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) Innovate UK £872,805 March 1, 2014 Feb. 28, 2015 Closed 30 Autonomous Wind-turbine Infrastructure Inspection Innovate UK £484,278 March 31, 2017 March 30, 2018 Closed 31 Autonomous Wind-turbine Infrastructure Inspection Innovate UK £1,210,695 March 31, 2017 March 31, 2018 Closed 32 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 29, 2024 Active 33 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 30, 2024 Active 34 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £276,434 Feb. 1, 2019 April 29, 2020 Closed 35 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £691,085 Feb. 1, 2019 April 30, 2020 Closed 36 Wake Anemometry for Yaw control: laboratory Demonstration, Ruggedisation and Field Testing Innovate UK £299,984 Sept. 30, 2016 Dec. 31, 2017 Closed 37 Impact of Spatio-Climatic Variability on Environment-Hosted Land-based Renewables: Microclimates NERC £150,358 May 31, 2010 Dec. 31, 2011 Closed 38 Impact of Spatio-Climatic Variability on Environment-Hosted Land-Based Renewables: Microclimates NERC £323,760 May 31, 2010 Aug. 30, 2013 Closed 39 Impact of Spatio-Climatic Variability on Environment-Hosted Land-based Renewables: Microclimates NERC £579,342 May 31, 2010 March 30, 2015 Closed 40 Impact of Spatio-Climatic Variability on Environment-Hosted Land-based Renewables: Microclimates NERC £267,120 Sept. 14, 2010 Dec. 14, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »