Home Projects More like: Detection of Faults in Planetary Gearboxes in Wind Turbines [Clear] # Title Funder Funding Start End Status 41 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £7,383,470 Nov. 2, 2015 May 1, 2019 Closed 42 Materials, Manufacturing and Oils Technologies for High Power Gearbox systems (MAMOTH PGB) Innovate UK £13,748,714 Dec. 1, 2014 Feb. 28, 2019 Closed 43 Reliawind Condition Monitoring for Offshore Wind Turbines Innovate UK £10,000 April 30, 2014 Oct. 31, 2014 Closed 44 Reliawind Condition Monitoring for Offshore Wind Turbines Innovate UK £25,000 April 30, 2014 Oct. 31, 2014 Closed 45 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £400,894 Oct. 2, 2016 Oct. 1, 2018 Closed 46 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £1,002,235 Oct. 2, 2016 Oct. 2, 2018 Closed 47 WARNSS (Wireless Autonomous Rail Networked Sensing System) Innovate UK £605,720 April 30, 2015 July 30, 2017 Closed 48 WARNSS (Wireless Autonomous Rail Networked Sensing System) Innovate UK £1,514,300 April 30, 2015 July 31, 2017 Closed 49 Refuse (33t) and Fire Truck (12-18t) Electric Drive Unit Innovate UK £397,501 June 30, 2021 March 30, 2022 Closed 50 Articulated Splined Couplings for Future Aero Gas-Turbine Engines EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 51 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 29, 2024 Active 52 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 30, 2024 Active 53 Autonomous Offshore Wind Farm Inspection Innovate UK £1,978,958 March 31, 2018 Sept. 29, 2020 Closed 54 Autonomous Offshore Wind Farm Inspection ISCF £4,947,395 March 31, 2018 Sept. 30, 2020 Closed 55 Prediction of power losses in electric vehicle transmissions EPSRC £0 Sept. 5, 2019 March 5, 2023 Active 56 Prediction of power losses in electric vehicle transmissions EPSRC £0 Sept. 5, 2019 March 5, 2023 Closed 57 Wind turbine wake analysis and modelling EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 58 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 59 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 60 Reliability-Oriented Assessment and Design Towards Energy system integration with offshore Renewables (ROADsTER) EPSRC £184,581 July 31, 2022 Jan. 31, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »