# Title Funder Funding Start End Status
21 Transmission heAlth Monitoring (TAM) Innovate UK
£209,970
Sept. 30, 2016 March 30, 2018 Closed
22 Disruptive Integrated Electric Transmissions for Industrial Vehicles (DIET) Innovate UK
£8,542,215
Nov. 1, 2016 July 31, 2019 Closed
23 Feasibility Assessment of ReliaWind Condition Monitoring Technology for Offshore Wind Turbine Drivetrains Innovate UK
£192,852
April 30, 2013 Feb. 28, 2014 Closed
24 Feasibility Assessment of ReliaWind Condition Monitoring Technology for Offshore Wind Turbine Drivetrains Innovate UK
£482,130
April 30, 2013 Feb. 28, 2014 Closed
25 WindTwin - Digital Twin of Wind Turbines for real time continuous monitoring and inspection Innovate UK
£2,707,636
June 30, 2017 Dec. 31, 2019 Closed
26 WindTwin - Digital Twin of Wind Turbines for real time continuous monitoring and inspection Innovate UK
£6,769,090
June 30, 2017 Dec. 31, 2019 Closed
27 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
28 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
29 Reliability and Efficiency of Electric Vehicle Transmissions EPSRC
£0
Oct. 2, 2020 March 31, 2024 Active
30 Wind Technologies Ltd - Development and testing of a 2 MW medium-speed Brushless DFIG for wind turbines Innovate UK
£499,948
Sept. 30, 2012 May 30, 2014 Closed
31 Wind Technologies Ltd - Development and testing of a 2 MW medium-speed Brushless DFIG for wind turbines Innovate UK
£1,249,870
Sept. 30, 2012 May 31, 2014 Closed
32 BWOP heat generator Innovate UK
£48,951
Nov. 1, 2022 Feb. 28, 2023 Active
33 Reducing cost of energy for offshore wind through integrated wind turbine and support structure design leading to reduction of support structure cost Innovate UK
£195,000
May 31, 2013 April 29, 2014 Closed
34 Lifetime Extension: Methodology Development And Implementation For Wind Turbine Drivetrains EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
35 Leading Edge For Turbines (LEFT) Innovate UK
£1,408,908
March 31, 2018 Dec. 31, 2020 Closed
36 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£202,124
May 31, 2018 June 29, 2020 Closed
37 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£505,310
May 31, 2018 June 30, 2020 Closed
38 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience UKRI
£2,755,446
Feb. 1, 2022 Jan. 31, 2026 Active
39 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience FLF
£6,888,615
Feb. 1, 2022 Jan. 31, 2026 Active
40 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£2,953,388
Nov. 2, 2015 April 30, 2019 Closed
Reset