Home Projects More like: Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability [Clear] # Title Funder Funding Start End Status 1 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 2 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 3 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC, NERC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 4 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC £555,894 Dec. 3, 2007 June 1, 2011 Closed 5 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC £177,708 Sept. 30, 2007 Sept. 29, 2010 Closed 6 Fatigue Effects in Composite Tidal Turbine Blades caused by Discrete Point Loading during Service EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 7 Understanding intermediate temperature fatigue crack growth in single crystal Ni-based superalloys EPSRC £0 Sept. 29, 2021 Sept. 29, 2025 Active 8 Formalisation and experimental validation of a novel design methodology to estimate finite lifetime under fretting fatigue loading EPSRC £0 Sept. 25, 2016 May 5, 2021 Closed 9 Flow control to mitigate fatigue load through the use of flexible tidal turbine blades EPSRC £192,096 Sept. 30, 2014 June 29, 2015 Closed 10 Tidal Blade Design EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 11 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £1,109,806 Aug. 31, 2010 Nov. 30, 2013 Closed 12 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £2,774,515 Aug. 31, 2010 Nov. 30, 2013 Closed 13 Structural Composites Research Facility (SCRF) EPSRC £2,799,560 May 31, 2017 Nov. 30, 2020 Closed 14 Structural Composites Research Facility (SCRF) EPSRC £6,998,900 May 31, 2017 Nov. 30, 2020 Closed 15 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 16 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £1,819,700 June 30, 2021 June 29, 2024 Active 17 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £4,549,250 June 30, 2021 June 30, 2024 Active 18 Increasing the Life of Marine Turbines by Design and Innovation EPSRC £1,148,100 April 30, 2012 Oct. 31, 2015 Closed 19 FloWTurb: Response of Tidal Energy Converters to Combined Tidal Flow, Waves, and Turbulence EPSRC £1,491,084 April 12, 2016 Oct. 31, 2019 Closed 20 Modelling Creep and Creep-Fatigue Damage for CSEF Power Plant Steels EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »