Home Projects More like: Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability [Clear] # Title Funder Funding Start End Status 41 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £3,972,900 Sept. 30, 2021 Sept. 30, 2024 Active 42 Wind blade design for disassembly EPSRC £0 Sept. 19, 2021 Sept. 29, 2025 Active 43 Wind blade design for disassembly EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 44 Data rich imaging approaches assessing early fatigue crack growth mechanisms in Ni base superalloys EPSRC £0 Sept. 24, 2017 March 30, 2021 Closed 45 Data rich imaging approaches assessing early fatigue crack growth mechanisms in Ni base superalloys EPSRC £0 Sept. 24, 2017 March 30, 2021 Closed 46 Fibre waviness defects in composite structures EPSRC £501,840 April 30, 2009 April 29, 2012 Closed 47 Fibre waviness defects in composite structures EPSRC £519,408 April 30, 2009 July 30, 2012 Closed 48 ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing EPSRC £2,242,616 Sept. 30, 2017 March 30, 2020 Closed 49 ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing EPSRC £5,606,540 Sept. 30, 2017 March 31, 2020 Closed 50 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC £2,449,800 March 1, 2022 May 30, 2025 Active 51 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC £6,124,500 May 31, 2022 May 31, 2025 Active 52 Aerospace casting for the hybrid electric future EPSRC £1,874,488 June 30, 2020 June 29, 2025 Active 53 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 54 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 55 Investigation of Fatigue Performance of Additively Manufactured Freeform Components via Non-destructive Metrology EPSRC £0 Sept. 30, 2020 Sept. 29, 2023 Active 56 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 57 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 58 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK £2,943,394 Jan. 1, 2019 Dec. 31, 2020 Closed 59 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK £7,287,715 Jan. 1, 2019 Dec. 31, 2020 Closed 60 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK £460,570 Sept. 30, 2010 March 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »