# Title Funder Funding Start End Status
81 Characterisation of hydrodynamic loads on floating Wind Turbine Generator substructures EPSRC
£0
Aug. 31, 2020 Aug. 30, 2024 Active
82 ZEFAL The Zero Fault Level Generator for Active Urban Networks EPSRC
£156,042
March 31, 2008 March 30, 2010 Closed
83 ZEFAL The Zero Fault Level Generator for Active Urban Networks EPSRC
£390,105
March 31, 2008 March 31, 2010 Closed
84 Reliawind Limited – Study, assessment and proof of market potentials and economics of a new condition monitoring technology for wind turbine applications Innovate UK
£50,000
March 31, 2014 Sept. 29, 2014 Closed
85 SPONSORSHIP AWARD: An engineering network to address challenges in microreactor processing for scale up of nano-material synthesis EPSRC
£50,242
July 30, 2014 Sept. 29, 2015 Closed
86 Microchannel Condensation Heat Transfer EPSRC
£1,534,980
March 12, 2010 March 11, 2013 Closed
87 ZEFAL The Zero Fault Level Generator for Active Urban Networks EPSRC
£281,192
May 31, 2008 May 30, 2010 Closed
88 ZEFAL The Zero Fault Level Generator for Active Urban Networks EPSRC
£702,980
May 31, 2008 May 31, 2010 Closed
89 OCT for 2D and 3D velocity measurement in micro-fluidic flows EPSRC
£948,662
June 29, 2014 Sept. 29, 2017 Closed
90 Models of flow and mixing of CO2 and brines in heterogeneous porous media EPSRC
£0
Sept. 30, 2017 Dec. 31, 2021 Closed
91 Volcano Monitoring using InSAR: application to the Cascades Volcanoes NERC
£345,330
Sept. 30, 2011 Sept. 30, 2015 Closed
92 Modelling the multi-scale spatial variations in the geomechanical properties within the discontinuities of the Sherwood Sandstone Group and their infl NERC
£0
Sept. 11, 2022 March 11, 2026 Active
93 Modelling the multi-scale spatial variations in the geomechanical properties within the discontinuities of the Sherwood Sandstone Group and their infl NERC
£0
Sept. 11, 2022 March 11, 2026 Active
94 Hypogene karst: genesis and implications to optimisation of low enthalpy energy resources NERC
£254,650
May 15, 2022 Aug. 15, 2024 Active
95 Hypogene karst: genesis and implications to optimisation of low enthalpy energy resources NERC
£1,471,235
May 31, 2022 Nov. 30, 2024 Active
96 Hypogene karst: genesis and implications to optimisation of low enthalpy energy resources NERC
£1,444,455
March 31, 2022 June 30, 2024 Active
97 Labyrinth Seals in Reversible Pump Turbines Innovate UK
£25,492
March 1, 2020 May 30, 2020 Closed
98 Labyrinth Seals in Reversible Pump Turbines Innovate UK
£63,730
March 1, 2020 May 31, 2020 Closed
99 Impact of Spatio-Climatic Variability on Environment-Hosted Land-based Renewables: Microclimates NERC
£150,358
May 31, 2010 Dec. 31, 2011 Closed
100 Impact of Spatio-Climatic Variability on Environment-Hosted Land-Based Renewables: Microclimates NERC
£323,760
May 31, 2010 Aug. 30, 2013 Closed
Reset