Home Projects More like: The architecture and fluid flow properties of shallow fault systems: implications for environmental monitoring [Clear] # Title Funder Funding Start End Status 61 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £2,197,550 April 30, 2016 Oct. 31, 2019 Closed 62 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £1,051,125 April 30, 2016 Oct. 31, 2021 Closed 63 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £414,400 Nov. 1, 2019 Oct. 31, 2021 Closed 64 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £3,066,570 April 30, 2016 Oct. 31, 2021 Closed 65 A numerical study of turbulent manoeuvering-body wakes EPSRC £349,774 Sept. 30, 2009 March 31, 2013 Closed 66 Can quantum algorithms revolutionise the simulation of turbulent flows? EPSRC £201,821 Sept. 30, 2022 Jan. 31, 2024 Active 67 Can quantum algorithms revolutionise the simulation of turbulent flows? EPSRC £1,009,105 Jan. 3, 2023 May 2, 2024 Active 68 Platform: Underpinning Technologies for Finite Element Simulation EPSRC £2,574,718 Nov. 1, 2013 Oct. 31, 2018 Closed 69 On the edge? NERC £4,119,461 May 31, 2023 May 31, 2026 Active 70 PyFR: Towards Industry and Exascale EPSRC £2,161,814 Sept. 22, 2018 March 22, 2022 Closed 71 Reducing Flow Measurement Uncertainties Through Accurate Determination of Thermophysical Properties of H2 and CO2 rich Fluid Mixtures Innovate UK £251,890 July 31, 2023 Jan. 31, 2024 Active 72 Renewable Energy from Natural Flow Phenomena EPSRC £0 Sept. 30, 2021 March 31, 2025 Active 73 Experimental investigation of the effect of coherent secondary structures upon a tip vortex EPSRC £198,030 Sept. 8, 2010 March 8, 2013 Closed 74 Flow Control Reliability and Optimisation Innovate UK £25,492 April 30, 2020 Sept. 29, 2020 Closed 75 Flow Control Reliability and Optimisation Innovate UK £63,730 April 30, 2020 Sept. 30, 2020 Closed 76 Nonlinear water waves driven by the motion of a solid body EPSRC £1,013,418 Aug. 31, 2010 Aug. 27, 2014 Closed 77 Nonlinear water waves driven by the motion of a solid body EPSRC £2,533,545 Aug. 31, 2010 Aug. 28, 2014 Closed 78 Fundamental Understanding of Turbulent Flow over Fluid-Saturated Complex Porous Media EPSRC £562,697 March 31, 2023 Sept. 29, 2026 Active 79 Fundamental Understanding of Turbulent Flow over Fluid-Saturated Complex Porous Media EPSRC £509,251 March 31, 2023 Sept. 29, 2026 Active 80 Validation & Verification for Critical Heat Flux and CFD EPSRC £1,037,475 Aug. 31, 2011 May 31, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »