# Title Funder Funding Start End Status
1 Robust QoS Control of DSRC Vehicle Networks for Collaborative Road Safety Applications EPSRC
£202,112
March 30, 2011 Jan. 11, 2012 Closed
2 Robust QoS Control of DSRC Vehicle Networks for Collaborative Road Safety Applications EPSRC
£106,892
Jan. 12, 2012 Oct. 10, 2012 Closed
3 Investigation of control and on-line optimisation opportunities of a waste-water treatment plant EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
4 Investigation of control and on-line optimisation opportunities of a waste-water treatment plant EPSRC
£0
Sept. 30, 2017 Sept. 30, 2021 Closed
5 Investigating the role of Kv3.4 potassium channels in neurodegenerative pathways of relevance to Alzheimer's Disease. MRC
£0
Sept. 30, 2018 March 30, 2022 Active
6 Development of a traction controller for drivability improvement of electric vehicles EPSRC
£0
Jan. 1, 2017 Dec. 31, 2019 Closed
7 Towards In-Combustion-Event Feedback (ICEF) Control by Laser Ignition EPSRC
£1,648,354
July 31, 2012 March 4, 2016 Closed
8 Towards In-Combustion-Event Feedback (ICEF) Control by Laser Ignition EPSRC
£4,120,885
July 31, 2012 March 4, 2016 Closed
9 Spectroscopy and modelling of catalyst nanoparticles EPSRC
£0
Sept. 30, 2016 Aug. 17, 2020 Closed
10 Recovery and re-use of energy, water and nutrients from waste in the food chain (Redivivus) EPSRC
£745,146
Dec. 31, 2014 Dec. 31, 2018 Closed
11 Recovery and re-use of energy, water and nutrients from waste in the food chain (Redivivus) EPSRC
£1,862,865
Dec. 31, 2014 Dec. 31, 2018 Closed
12 Aggregative charging control of electric vehicle populations EPSRC
£200,828
Jan. 1, 2018 April 29, 2019 Closed
13 Aggregative charging control of electric vehicle populations EPSRC
£502,070
Jan. 1, 2018 April 30, 2019 Closed
14 Carbon, Control and Comfort: User-centred control systems for comfort, carbon saving and energy management EPSRC
£4,189,404
March 31, 2009 Sept. 29, 2012 Closed
15 Carbon, Control and Comfort: User-centred control systems for comfort, carbon saving and energy management EPSRC
£10,473,510
March 31, 2009 Sept. 30, 2012 Closed
16 Novel design of SWATH vessel for the storage of hydrogen tanks and powertrain Innovate UK
£49,548
Nov. 1, 2022 April 29, 2023 Active
17 Developing advanced metrics for real-time monitoring of anaerobic digestion (AD). EPSRC
£0
Oct. 14, 2018 Jan. 14, 2023 Active
18 Developing advanced metrics for real-time monitoring of anaerobic digestion (AD). EPSRC
£0
Oct. 14, 2018 Oct. 23, 2022 Closed
19 Turbulence, Sediment Stratification and Altered Resuspension under Waves (TSSAR Waves) NERC
£1,790,690
Sept. 30, 2009 March 31, 2013 Closed
20 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC
£600,358
Aug. 31, 2009 Nov. 30, 2011 Closed
Reset