# Title Funder Funding Start End Status
41 Center for Low Emission Vehicle Research (CLEVeR) EPSRC
£896,175
Jan. 2, 2014 Jan. 1, 2017 Closed
42 Simulating the kinetic ion response to magnetic islands in tokamak plasmas EPSRC
£3,183,550
Sept. 30, 2015 Nov. 30, 2020 Closed
43 Interaction between sensory and supporting cells in the organ of Corti: basis for sensitivity and frequency selectivity of mammalian cochlea. MRC
£3,129,814
Aug. 31, 2015 Aug. 30, 2020 Closed
44 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC
£201,454
March 21, 2017 May 23, 2018 Closed
45 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC
£503,635
March 21, 2017 May 24, 2018 Closed
46 The role of CESA protein modification in localisation and function of the cellulose synthase complex BBSRC
£855,736
Nov. 1, 2010 April 29, 2014 Closed
47 Active Vibration Control of Parametrically Excited Systems EPSRC
£494,920
April 29, 2013 April 29, 2015 Closed
48 CFD Modelling of the acoustic response of sprays EPSRC
£194,258
Jan. 15, 2016 July 13, 2017 Closed
49 Enhancement of Inductive Power Transfer (IPT) for Wireless EV Charging EPSRC
£1,059,850
Aug. 31, 2018 Nov. 30, 2021 Closed
50 Spectroscopy-driven design of an efficient photocatalyst for CO2 reduction (Ext.) EPSRC
£1,255,392
Jan. 1, 2018 June 29, 2021 Closed
51 Spectroscopy-driven design of an efficient photocatalyst for CO2 reduction (Ext.) EPSRC
£3,138,480
Jan. 1, 2018 June 30, 2021 Closed
52 Arable: Modelling the impact of cabbage stem flea beetle on oilseed rape crops BBSRC
£176,470
Feb. 1, 2023 July 31, 2023 Closed
53 A Security Investigation of Power Line Communication EPSRC
£0
Sept. 30, 2018 Sept. 30, 2022 Closed
54 CO2 injection and storage - Short and long-term behaviour at different spatial scales EPSRC
£2,424,408
Nov. 1, 2013 Aug. 30, 2017 Closed
55 CO2 injection and storage - Short and long-term behaviour at different spatial scales EPSRC
£6,061,020
Nov. 1, 2013 Aug. 31, 2017 Closed
56 Silicon Compatible GaN Power Electronics EPSRC
£12,393,434
March 1, 2013 Aug. 30, 2018 Closed
57 Silicon Compatible GaN Power Electronics EPSRC
£30,983,585
March 1, 2013 Aug. 31, 2018 Closed
58 All-optical electrophysiology: probing real-time dynamics of neural circuits BBSRC
£813,030
May 31, 2022 May 30, 2025 Active
Reset