Home Projects More like: Clay Hydration, Drying, and Cracking in Nuclear Waste Repositories [Clear] # Title Funder Funding Start End Status 81 Advanced Waste Management Strategies for High Dose Spent Adsorbents EPSRC £1,024,860 Nov. 30, 2015 March 29, 2018 Closed 82 The effects of fluid flow on the transport properties of faults in Enhanced Geothermal Systems EPSRC £0 Sept. 29, 2019 June 30, 2023 Closed 83 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £240,882 Oct. 16, 2022 Oct. 15, 2023 Active 84 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £1,204,410 Oct. 16, 2022 Nov. 16, 2023 Closed 85 Uranium Silicide/Uranium Diboride Composite Fuel Development EPSRC £1,236,495 Sept. 30, 2020 Jan. 6, 2023 Closed 86 Area Topography Sensing Mat for Digital Corrosion Monitoring of Smart Infrastructures Innovate UK £139,814 Nov. 1, 2018 Oct. 31, 2019 Closed 87 Area Topography Sensing Mat for Digital Corrosion Monitoring of Smart Infrastructures Innovate UK £349,535 Nov. 1, 2018 Oct. 31, 2019 Closed 88 Robotics and Artificial Intelligence for Nuclear Plus (RAIN+) ISCF £9,877,065 March 31, 2021 March 31, 2022 Closed 89 Engineered Zircaloy Cladding Modifications for Improved Accident Tolerance of LWR Fuel EPSRC £4,951,495 Aug. 31, 2013 Dec. 31, 2016 Closed 90 Plasma turbulence in transport barriers of magnetic confinement fusion devices EPSRC £0 Sept. 30, 2016 March 31, 2020 Closed 91 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £2,197,550 April 30, 2016 Oct. 31, 2019 Closed 92 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £1,051,125 April 30, 2016 Oct. 31, 2021 Closed 93 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £414,400 Nov. 1, 2019 Oct. 31, 2021 Closed 94 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £3,066,570 April 30, 2016 Oct. 31, 2021 Closed 95 Energy and the Physical Sciences:Beta-enhanced thermionic energy converters and nuclear batteries employing nanostructured diamond electrodes EPSRC £4,759,730 March 31, 2013 Sept. 30, 2016 Closed 96 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £199,806 Feb. 12, 2020 Aug. 10, 2021 Closed 97 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £499,515 Feb. 12, 2020 Aug. 11, 2021 Closed 98 Zirconium alloys for high burn-up fuel in current and advanced light water-cooled reactors EPSRC £3,097,355 March 31, 2007 March 31, 2012 Closed 99 Zirconium alloys for high burn-up fuel in current and advanced light water-cooled reactors EPSRC £3,328,610 July 31, 2007 July 31, 2012 Closed 100 Zirconium alloys for high burn-up fuel in current and advanced light water-cooled reactors EPSRC £1,327,705 May 31, 2007 May 31, 2012 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »