Home Projects More like: Clay Hydration, Drying, and Cracking in Nuclear Waste Repositories [Clear] # Title Funder Funding Start End Status 61 High Temperature Zirconium Alloys for Nuclear Fusion and Generation IV Fission Reactors EPSRC £1,508,740 Aug. 31, 2020 Feb. 28, 2023 Closed 62 Nuclear Decontamination using Engineered Bioproducts EPSRC, NERC £0 Sept. 30, 2018 Sept. 30, 2022 Closed 63 Safer low-cost nuclear material storage through cold-spray formed boron carbide coated components (SAFESTORE) Innovate UK £189,000 Dec. 1, 2010 Feb. 29, 2012 Closed 64 Safer low-cost nuclear material storage through cold-spray formed boron carbide coated components (SAFESTORE) Innovate UK £472,500 Dec. 1, 2010 Feb. 29, 2012 Closed 65 Development of Unified Experimental and Theoretical Approach to Predict Reactive Transport in Subsurface Porous Media EPSRC £1,973,135 March 31, 2014 Sept. 30, 2017 Closed 66 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC £330,242 Nov. 1, 2019 June 29, 2021 Closed 67 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC £655,948 Jan. 2, 2018 Oct. 31, 2019 Closed 68 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC £825,605 Nov. 1, 2019 June 30, 2021 Closed 69 Ceramic Coatings for Clad (The C^3 Project): Advanced Accident-Tolerant Ceramic Coatings for Zr-alloy Cladding EPSRC £5,375,720 June 23, 2013 Sept. 14, 2015 Closed 70 Ceramic Coatings for Clad (The C^3 Project): Advanced Accident-Tolerant Ceramic Coatings for Zr-alloy Cladding EPSRC £1,744,120 Dec. 15, 2015 Sept. 1, 2017 Closed 71 Intermolecular Electronic Interactions: Alternative Paths for Photochemistry EPSRC £2,193,810 Sept. 30, 2023 Sept. 30, 2026 Active 72 3D Assessment of Surface Integrity and Performance EPSRC £904,294 July 31, 2011 Oct. 31, 2014 Closed 73 Platform for Long-term Experimental Investigation of Alteration in Disposal Environments and Storage - PLEIADES EPSRC £2,989,900 Sept. 30, 2021 Sept. 30, 2023 Closed 74 A fully coupled XFEM model for hydraulic fracturing in multi-phase porous media NERC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 75 A fully coupled XFEM model for hydraulic fracturing in multi-phase porous media NERC £0 Sept. 30, 2017 Sept. 30, 2021 Closed 76 Turbulence in the edge of tokamaks EPSRC £1,271,210 Sept. 30, 2009 Aug. 31, 2011 Closed 77 Time-dependent deformation: bridging the strain rate gap in brittle rocks. NERC £3,317,760 Aug. 31, 2009 Aug. 31, 2019 Closed 78 Time-dependent deformation: bridging the strain rate gap in brittle rocks. NERC £213,590 July 31, 2009 July 31, 2014 Closed 79 ENVIRO-COAT: ENVIROnmentally assisted, engineered Corrosion prOducts for Aqueous corrosion miTigation EPSRC £1,733,840 March 31, 2020 March 31, 2023 Closed 80 Modeling and Validation of Irradiation Damage in Ni-based Alloys for Long-Term LWR Applications (US/UK) EPSRC £2,040,895 Jan. 1, 2016 Dec. 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »