# Title Funder Funding Start End Status
1 Fault tolerant control for increased safety and security of nuclear power plants EPSRC
£878,499
Dec. 1, 2018 Feb. 28, 2022 Closed
2 Fault tolerant control for increased safety and security of nuclear power plants EPSRC
£472,296
Sept. 30, 2018 Aug. 30, 2023 Active
3 Computational and communication architectures for MMC VSC-HVDC Construction EPSRC
£0
Sept. 11, 2018 March 30, 2022 Active
4 Computational and communication architectures for MMC VSC-HVDC Construction EPSRC
£0
Sept. 30, 2018 March 31, 2022 Closed
5 Grace Time EPSRC
£3,405,655
Dec. 1, 2015 May 31, 2020 Closed
6 Coated Zirconium Alloy Fuel Rod Cladding for Accident Tolerance EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
7 Intelligent Condition Monitoring for Civil Nuclear Structures EPSRC
£605,430
June 16, 2013 May 26, 2016 Closed
8 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC
£591,264
Dec. 15, 2014 April 29, 2018 Closed
9 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC
£1,478,160
Dec. 15, 2014 April 30, 2018 Closed
10 A Resilience Modelling Framework for Improved Nuclear Safety (NuRes) EPSRC
£522,516
Jan. 1, 2019 Dec. 31, 2021 Closed
11 A Resilience Modelling Framework for Improved Nuclear Safety (NuRes) EPSRC
£1,306,290
Jan. 1, 2019 Dec. 31, 2021 Closed
12 Multivariate Max-stable Processes with Application to the Forecasting of Multiple Hazards EPSRC
£878,108
June 28, 2018 Aug. 30, 2021 Closed
13 Multivariate Max-stable Processes with Application to the Forecasting of Multiple Hazards EPSRC
£85,630
Aug. 31, 2021 July 30, 2022 Closed
14 On the Development of a Novel Approach in Modelling of Turbulent Pulsating Flows EPSRC
£518,960
June 30, 2020 Dec. 31, 2022 Active
15 On the Development of a Novel Approach in Modelling of Turbulent Pulsating Flows EPSRC
£1,297,400
June 30, 2020 March 31, 2023 Closed
16 Design and Maintenance of Nuclear Safety Systems for Life Extension (DaMSSLE) EPSRC
£2,789,650
Dec. 1, 2015 Nov. 30, 2019 Closed
17 Integral Inherently Safe Light Water Reactor (I2S-LWR) EPSRC
£1,393,655
May 31, 2013 Jan. 31, 2017 Closed
18 Planar fault energies to order EPSRC
£285,810
May 31, 2015 May 30, 2016 Closed
19 Transmission heAlth Monitoring (TAM) EPSRC
£201,994
Sept. 30, 2016 March 30, 2018 Closed
20 Transmission heAlth Monitoring (TAM) EPSRC
£504,985
Sept. 30, 2016 March 31, 2018 Closed