Home Projects More like: Fault tolerant control for increased safety and security of nuclear power plants [Clear] # Title Funder Funding Start End Status 61 SiC fuel cladding: Macroscopic effects of radiation on mechanical and thermal properties from microstructural-scale characterisation and modelling EPSRC £2,367,410 Dec. 1, 2015 May 31, 2019 Closed 62 Robotic systems for retrieval of contaminated material from hazardous zones EPSRC £2,783,120 March 31, 2015 March 31, 2018 Closed 63 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £196,306 Oct. 4, 2010 Jan. 4, 2013 Closed 64 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £490,765 Oct. 4, 2010 Jan. 4, 2013 Closed 65 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £982,574 March 17, 2016 March 16, 2020 Closed 66 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £2,456,435 March 17, 2016 March 16, 2020 Closed 67 SYNAPS (Synchronous Analysis and Protection System) EPSRC £398,590 Nov. 1, 2015 Jan. 31, 2018 Closed 68 SYNAPS (Synchronous Analysis and Protection System) EPSRC £996,475 Nov. 1, 2015 Jan. 31, 2018 Closed 69 Thin neutron detector on a chip utilising silicon carbide EPSRC £1,201,775 Sept. 30, 2018 June 30, 2021 Closed 70 Enhanced Methodologies for Advanced Nuclear System Safety (eMEANSS) EPSRC £4,274,610 Jan. 14, 2022 Jan. 13, 2025 Active 71 Fracture of Graphite Fuel Bricks EPSRC £2,067,375 May 31, 2013 Nov. 30, 2015 Closed 72 JUNO: A Network for Japan - UK Nuclear Opportunities EPSRC £976,290 Nov. 30, 2016 Nov. 29, 2023 Active 73 JUNO: A Network for Japan - UK Nuclear Opportunities EPSRC £2,440,725 Nov. 30, 2016 Nov. 28, 2022 Closed 74 Performance and Reliability of Metallic Materials for Nuclear Fission Power Generation EPSRC £1,718,140 June 30, 2010 March 31, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »