Home Projects More like: EchoBolt Advanced Fastener Inspection for Wind Turbines [Clear] # Title Funder Funding Start End Status 21 Integration of Wind Power Generation with Compressed Air Energy Storage 1=Energy 2=Wind Power EPSRC, NERC £0 Sept. 30, 2018 June 30, 2022 Closed 22 Wind2DC: Medium Voltage DC Power Take Off Technologies for Floating Offshore Wind Turbine Energy Conversion and Collection Systems EPSRC £4,568,070 June 30, 2023 Feb. 28, 2027 Active 23 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 24 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 25 An improved installation technique for offshore wind: Replacing grouted foundation connections with a mechanical alternative Innovate UK £187,130 Jan. 1, 2020 Dec. 31, 2020 Closed 26 An improved installation technique for offshore wind: Replacing grouted foundation connections with a mechanical alternative Innovate UK £467,825 Jan. 1, 2020 Dec. 31, 2020 Closed 27 FLoating Offshore wind REpair & Novel Concept cost Estimates (FLORENCE) EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 28 Guru Verify: real-time, cloud-based, machine-learning commissioning tools to radically improve performance of heat networks Innovate UK £562,934 Feb. 1, 2019 Jan. 31, 2020 Closed 29 Guru Verify: real-time, cloud-based, machine-learning commissioning tools to radically improve performance of heat networks Innovate UK £1,407,335 Feb. 1, 2019 Jan. 31, 2020 Closed 30 Condition Monitoring OffshoreWind Turbine throughMachine Learning EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 31 Condition Monitoring OffshoreWind Turbine throughMachine Learning EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 32 Six Axis Monitoring (SAM) local position reference system for dynamic positioning for safer offshore wind installation, servicing and maintenance operations. Innovate UK £491,992 Sept. 30, 2020 March 30, 2022 Closed 33 Six Axis Monitoring (SAM) local position reference system for dynamic positioning for safer offshore wind installation, servicing and maintenance operations. Innovate UK £1,229,980 Sept. 30, 2020 March 31, 2022 Closed 34 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £1,819,700 June 30, 2021 June 29, 2024 Active 35 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £4,549,250 June 30, 2021 June 30, 2024 Active 36 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £370,240 Feb. 1, 2019 July 30, 2020 Closed 37 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £925,600 Feb. 1, 2019 July 31, 2020 Closed 38 TLPWIND UK: "Driving the cost down of offshore wind in UK Waters" Innovate UK £1,161,574 Aug. 31, 2014 March 30, 2016 Closed 39 Self-assembling Perovskite Absorbers - Cells Engineered into Modules (SPACE-Modules) EPSRC £3,655,648 March 1, 2017 Feb. 29, 2020 Closed 40 Self-assembling Perovskite Absorbers - Cells Engineered into Modules (SPACE-Modules) EPSRC £5,026,320 March 1, 2015 Feb. 28, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »