Home Projects More like: EchoBolt Advanced Fastener Inspection for Wind Turbines [Clear] # Title Funder Funding Start End Status 1 EchoBolt Advanced Fastener Inspection for Wind Turbines Innovate UK £591,676 Sept. 30, 2019 March 30, 2021 Closed 2 Wind-AI: Wind Turbine Performance modelling utilising Deep Learning with LIDAR Validation Innovate UK £644,332 March 31, 2020 June 29, 2021 Closed 3 Wind-AI: Wind Turbine Performance modelling utilising Deep Learning with LIDAR Validation Innovate UK £1,610,830 March 31, 2020 June 30, 2021 Closed 4 On the Behaviour of Discontinuous Interfaces under Dynamic Loading EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 5 Instrumentation Ready Gearbox Innovate UK £10,000 Feb. 1, 2014 July 30, 2014 Closed 6 Nanocatalyst improved electrolysers Innovate UK £176,296 June 30, 2022 Dec. 31, 2023 Active 7 Platforms for tidal energy convertors Innovate UK £141,802 Sept. 30, 2016 Dec. 31, 2017 Closed 8 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £590,322 Feb. 1, 2020 June 29, 2021 Closed 9 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £1,475,805 Feb. 1, 2020 June 30, 2021 Closed 10 Centre for Advanced Materials for Renewable Energy Generation EPSRC £4,074,878 Dec. 1, 2016 May 30, 2021 Closed 11 Centre for Advanced Materials for Renewable Energy Generation EPSRC £10,187,195 Dec. 1, 2016 May 31, 2021 Closed 12 SMART-W: Smart Assets to reduce the cost of delivering Offshore Wind Innovate UK £1,205,640 Nov. 1, 2020 Jan. 31, 2022 Closed 13 Maintenance free connection systems to replace bolted flange connections on wind turbines Innovate UK £240,612 Nov. 1, 2020 May 30, 2021 Closed 14 Maintenance free connection systems to replace bolted flange connections on wind turbines Innovate UK £601,530 Nov. 1, 2020 May 31, 2021 Closed 15 Pivoting Deck Vessel prototype construction Innovate UK £9,321,895 Dec. 1, 2016 Sept. 30, 2018 Closed 16 Dynamic loading, operation, and yield maximization of tidal turbines EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 17 Integrated offshore CO2 reservoir monitoring feasibility study Innovate UK £115,804 Sept. 30, 2020 Dec. 31, 2020 Closed 18 Intelligent Blade Controlled Wind Turbine Innovate UK £419,206 Dec. 1, 2019 March 30, 2021 Closed 19 Intelligent Blade Controlled Wind Turbine Innovate UK £1,048,015 Dec. 1, 2019 March 31, 2021 Closed 20 Integration of Wind Power Generation with Compressed Air Energy Storage 1=Energy 2=Wind Power EPSRC £0 Sept. 30, 2018 June 29, 2022 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »