# Title Funder Funding Start End Status
61 Flexible Responsive Systems in Wave Energy: FlexWave EPSRC
£1,346,770
Aug. 11, 2021 Aug. 10, 2024 Active
62 Flexible Responsive Systems in Wave Energy: FlexWave EPSRC
£3,366,925
Aug. 11, 2021 Jan. 11, 2025 Active
63 High Fidelity Ion Beam Simulation of High Dose Neutron Irradiation EPSRC
£2,538,690
June 25, 2014 Dec. 25, 2017 Closed
64 Structural Composites Research Facility (SCRF) EPSRC
£2,799,560
May 31, 2017 Nov. 30, 2020 Closed
65 Structural Composites Research Facility (SCRF) EPSRC
£6,998,900
May 31, 2017 Nov. 30, 2020 Closed
66 Ceramic Matrix Composites Condition Assessment and Damage Monitoring EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
67 Recycled aerospace grade Ti-6Al-4V for structural applications in offshore renewable energy systems NERC
£42,685
Aug. 31, 2022 Aug. 31, 2023 Closed
68 Recycled aerospace grade Ti-6Al-4V for structural applications in offshore renewable energy systems NERC
£8,537
Aug. 31, 2022 Aug. 30, 2023 Active
69 In-service X-ray radiography of offshore wind blades (RADBLAD) Innovate UK
£1,540,542
March 31, 2019 June 29, 2021 Closed
70 In-service X-ray radiography of offshore wind blades (RADBLAD) ISCF
£3,851,355
March 31, 2019 June 30, 2021 Closed
71 India - UK Civil Nuclear Collaboration: Development of Radiation Damage Resistant High Entropy Alloys for Advanced Nuclear Systems EPSRC
£848,980
July 31, 2018 Jan. 31, 2022 Closed
72 Fundamentals of static crack growth in nickel-based superalloys after friction welding EPSRC
£0
June 30, 2021 March 30, 2022 Active
73 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC
£0
Sept. 25, 2019 March 30, 2023 Active
74 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC
£0
Sept. 30, 2019 March 31, 2023 Closed
75 Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
76 Regenerative 3D printed cementitious skins for building components (Re3DSkin) EPSRC
£246,904
Aug. 31, 2022 Aug. 30, 2024 Active
77 Real-time Virtual Prototypes for the Power Electronics Supply Chain EPSRC
£5,182,945
June 30, 2023 June 30, 2026 Active
78 FaSCiNATe: Facility for the Structural Characterisation of materials for Nuclear Applications operating at high Temperatures EPSRC
£10,085,340
Sept. 30, 2021 Sept. 30, 2023 Closed
79 High Fidelity Modelling of Wind Turbine Main-Bearing Operational Loads EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
80 Creep and Creep-Fatigue Crack Growth Mechanisms in Alloy 709 EPSRC
£2,102,230
Dec. 1, 2015 Sept. 30, 2019 Closed
Reset