# Title Funder Funding Start End Status
41 Offshore Infrastructure Robotic Inspection System (OSIRIS) Demonstrator Innovate UK
£909,658
March 1, 2019 March 30, 2022 Active
42 Offshore Infrastructure Robotic Inspection System (OSIRIS) Demonstrator ISCF
£2,274,145
March 1, 2019 March 31, 2022 Closed
43 A whole-life approach to the development of high integrity welding technologies for Generation IV fast reactors EPSRC
£5,122,740
June 29, 2014 Dec. 31, 2020 Closed
44 CMMI-EPSRC: Quantitative Characterization of Mission Critical Microstructures of Engineering Metals with Diffusive Ultrasound EPSRC
£3,052,775
Aug. 28, 2022 Aug. 28, 2025 Active
45 Renewal and Development of the Leeds EPSRC Nanoscience and Nanotechnology Equipment Facility (LENNF) EPSRC
£975,084
April 7, 2013 April 6, 2016 Closed
46 Renewal and Development of the Leeds EPSRC Nanoscience and Nanotechnology Equipment Facility (LENNF) EPSRC
£2,437,710
April 7, 2013 April 7, 2016 Closed
47 A Micro-Mechanistic Study of Oxygen-Diffusion-Assisted Crack Growth in a Polycrystalline Nickel-Based Superalloy EPSRC
£393,718
Nov. 12, 2007 Nov. 11, 2010 Closed
48 Rapid Inspection of Complex Geometries Using Edge-Guided Ultrasonic Waves EPSRC
£292,314
Aug. 31, 2015 Dec. 1, 2017 Closed
49 MAINTAiN - Multi-scAle INTegrity assessment for Advanced high-temperature Nuclear systems EPSRC
£1,970,165
March 31, 2018 Sept. 30, 2022 Closed
50 Heterogeneous case-carburised bearing steel microstructures EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
51 Development of an in-situ characterisation facility for both proton and neutron irradiation EPSRC
£6,481,540
Sept. 30, 2021 March 31, 2024 Active
52 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£2,953,388
Nov. 2, 2015 April 30, 2019 Closed
53 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£7,383,470
Nov. 2, 2015 May 1, 2019 Closed
54 Environmental Crack Growth of Structural Materials in Pressurised Gas (ENCAMP) Innovate UK
£567,968
Feb. 1, 2018 Oct. 31, 2019 Closed
55 Environmental Crack Growth of Structural Materials in Pressurised Gas (ENCAMP) ISCF
£1,419,920
Feb. 1, 2018 Oct. 31, 2019 Closed
56 Lifetime Extension: Methodology Development And Implementation For Wind Turbine Drivetrains EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
57 Mechanistic Understanding of the Damage and Fracture in Ceramic-Matrix Composites under Extreme Conditions EPSRC
£555,578
March 31, 2020 Dec. 31, 2023 Active
58 High Performance Ductile Composite Technology (HiPerDuCT) EPSRC
£12,833,566
June 30, 2011 June 29, 2018 Closed
59 Flexible Responsive Systems in Wave Energy EPSRC
£69,928
Aug. 11, 2021 Aug. 10, 2024 Active
60 Flexible Responsive Systems in Wave Energy: FlexWave EPSRC
£583,568
Oct. 5, 2021 Oct. 4, 2024 Active
Reset