Reduced in-use building energy consumption from improved building temperature stability using dual-function ceramic aqueous paints

Find Similar History 34 Claim Ownership Request Data Change Add Favourite

Title
Reduced in-use building energy consumption from improved building temperature stability using dual-function ceramic aqueous paints

CoPED ID
f2b77784-44a2-4e5f-a430-7c45a3de37bc

Status
Closed


Value
£514,680

Start Date
March 1, 2009

End Date
Feb. 29, 2012

Description

More Like This


The need that this project strove to address was the improvement of building insulation using Decorative paints. This would reduce the energy needed to maintain a building at a comfortable living/working temperature with corresponding financial and environmental (carbon emission) savings. It was intended that this need would be met through this project formulating, synthesising, testing and proving the required Decorative paint that could be applied by traditional means thus allowing wide exploitation opportunities.
The tangible benefits that this project delivered were materials and paint formulations for improved insulating Decorative paints. Laboratory evaluation and modelling studies showed evidence that the paint had the desired improved insulating performance but the estimated payback period, of 5 -15 years depending on the source of a buildings heating, was long and would be even longer in already better insulated buildings. An extensive full trial of the preferred Decorative paint was carried out in a refurbished office building, with extensive logging of energy use and temperature, and against comparable areas that were treated with conventional paints. The paint maintained standard appearance and durability requirements, but normal variation in the energy use of the building was much more significant than any expected energy saving benefit and so it was not possible to demonstrate the desired insulation benefit. It was further concluded that it is probably impossible to demonstrate such a small benefit in a realistic setting.

No people listed.

Subjects by relevance
  1. Buildings
  2. Paints
  3. Emissions
  4. Decorative painting
  5. Construction
  6. Insulation
  7. Temperature
  8. Sustainable development
  9. Energy efficiency
  10. Energy consumption (energy technology)
  11. Projects

Extracted key phrases
  1. Use building energy consumption
  2. Improved building temperature stability
  3. Function ceramic aqueous paint
  4. Energy use
  5. Preferred decorative paint
  6. Well insulated building
  7. Energy saving benefit
  8. Office building
  9. Building heating
  10. Paint formulation
  11. Conventional paint
  12. Insulation benefit
  13. Need
  14. Tangible benefit
  15. Small benefit

Related Pages

UKRI project entry

UK Project Locations