Home Projects More like: Reduced in-use building energy consumption from improved building temperature stability using dual-function ceramic aqueous paints [Clear] # Title Funder Funding Start End Status 1 Bio-fabrication of sustainable functional bacterial cellulose aerogel for building insulation EPSRC £1,249,070 June 11, 2023 June 11, 2025 Active 2 Tackling the UK's 55 million litre problem of plastic waste from domestic paint. Innovate UK £111,746 Jan. 1, 2021 June 29, 2021 Closed 3 Energy efficient bio-based natural fibre insulation Innovate UK £1,953,395 Aug. 31, 2008 Feb. 29, 2012 Closed 4 Sustainable Coatings by Rational Design (SusCoRD) EPSRC £7,686,087 Nov. 1, 2018 June 29, 2024 Active 5 The Thermulon-process for making super-insulating aerogels – affordable insulation to aid the cost of living crisis Innovate UK £2,622,000 Dec. 1, 2022 July 31, 2024 Active 6 Net Zero Coating Innovate UK £48,018 Nov. 1, 2022 April 29, 2023 Active 7 New generation insulation material for use within the building envelope EPSRC £0 Sept. 30, 2019 Dec. 31, 2023 Active 8 New generation insulation material for use within the building envelope EPSRC, NERC £0 Sept. 30, 2019 Dec. 31, 2023 Active 9 Aerogel composites for carbon capture and thermal management in commercial buildings - Feasibility Study EPSRC £293,084 May 27, 2017 Nov. 27, 2018 Closed 10 Aerogel composites for carbon capture and thermal management in commercial buildings - Feasibility Study EPSRC £732,710 May 27, 2017 Nov. 27, 2018 Closed 11 Thermulon - Production of high-performance insulation - Incorporating waste materials into the production process Innovate UK £298,434 May 31, 2020 Nov. 30, 2021 Closed 12 Thermulon – non-combustible high performance building insulation Innovate UK £676,074 Nov. 1, 2020 Dec. 31, 2021 Closed 13 Eco-Energy Retrofit, Grove Housing Association, Belfast Innovate UK £300,000 March 1, 2010 March 31, 2013 Closed 14 Eco-Energy Retrofit, Grove Housing Association, Belfast Innovate UK £750,000 March 1, 2010 March 31, 2013 Closed 15 MilaFoam - a non-combustible lightweight insulation board Innovate UK £450,604 Feb. 1, 2022 July 30, 2023 Active 16 MilaFoam - a non-combustible lightweight insulation board Innovate UK £1,104,957 Feb. 1, 2022 July 31, 2023 Closed 17 Carbon Air High Performance Noiseproofing Materials Innovate UK £185,630 Jan. 1, 2015 Nov. 30, 2016 Closed 18 Carbon Air High Performance Noiseproofing Materials Innovate UK £464,075 Jan. 1, 2015 Nov. 30, 2016 Closed 19 B-bem: The Bayesian building energy management Portal EPSRC £2,254,605 Sept. 9, 2014 March 9, 2018 Closed 20 Diagnostic Net-Zero Carbon Refurbishment and Supply Chains Procurement Tool (Carbon Diagnostics) Innovate UK £119,600 Sept. 30, 2020 Dec. 31, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »