Name
Imperial College London

CoPED ID
6f052d9b-a9ec-4ca5-b2c4-2dda9e8bdda3

About


Projects in CoPED

New Phase Field Models for Unravelling Multi-Physics Material Degradation Challenges (NEWPHASE)

Status: Active
Total funding: £7,366,500
From: Sept. 30, 2021
To: Sept. 30, 2025
Organisations: 10
People: 2

Design and Modelling of Organic/Hydrogen Redox Flow Battery Systems

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: Sept. 30, 2025
Organisations: 2
People: 2


ContRol methods for rELiable sensIng informAtion in interConnected Energy systems

Status: Active
Total funding: £1,887,685
From: Jan. 1, 2023
To: Dec. 31, 2025
Organisations: 4
People: 1

Probing ammonia production in real time using electrochemical mass spectrometry

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: March 31, 2025
Organisations: 1
People: 1


Sustainable Zero-Carbon Solar Heating, Cooling and Power in Urban and Off-Grid Environments

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: Dec. 31, 2024
Organisations: 3
People: 2

Digital Circular Electrochemical Economy (DCEE)

Status: Active
Total funding: £4,823,100
From: Aug. 31, 2021
To: Aug. 31, 2024
Organisations: 5
People: 7


High End Computing Consortium for Wave Structure Interaction HEC WSI

Status: Active
Total funding: £1,779,795
From: Jan. 3, 2023
To: Jan. 2, 2027
Organisations: 27
People: 14

Aquifer thermal energy storage for decarbonisation of heating and cooling: Overcoming technical, economic and societal barriers to UK deployment

Status: Active
Total funding: £7,623,750
From: Nov. 1, 2021
To: Oct. 31, 2024
Organisations: 13
People: 16


Solar Photovoltaic Systems Integration

Status: Active
Total funding: £0
From: Nov. 1, 2020
To: April 30, 2024
Organisations: 1
People: 1

PRISM: Platform for Research In Simulation Methods

Status: Active
Total funding: £8,064,825
From: June 30, 2018
To: Dec. 31, 2023
Organisations: 28
People: 11


Reliability and Efficiency of Electric Vehicle Transmissions

Status: Active
Total funding: £0
From: Oct. 2, 2020
To: March 31, 2024
Organisations: 2
People: 1

EPSRC Centre for Doctoral Training in Nuclear Energy Futures

Status: Active
Total funding: £32,037,059
From: March 31, 2019
To: Sept. 30, 2027
Organisations: 25
People: 10


High performance deterministic radiation transport methods for SMRs

Status: Active
Total funding: £0
From: Sept. 30, 2022
To: Sept. 30, 2026
Organisations: 2
People: 1

High Performance, Deterministic, Radiation Transport Methods for Radiation Shielding Analyses of Small Modular Reactors

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: Sept. 30, 2024
Organisations: 2
People: 1


Advanced shielding materials to enable compact fusion reactors

Status: Active
Total funding: £11,156,850
From: April 24, 2022
To: April 24, 2027
Organisations: 11
People: 2

Design rules for defect-tolerant photovoltaics

Status: Active
Total funding: £3,785,770
From: June 6, 2021
To: June 6, 2024
Organisations: 3
People: 2


Neutron irradiation damage modelling of interface strengthened ferritic superalloys for high temperature fusion applications

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: Sept. 30, 2024
Organisations: 2
People: 2

Inertial Fusion Energy: Optimising High Energy Density Physics in Complex Geometries

Status: Active
Total funding: £24,567,716
From: June 30, 2023
To: June 30, 2028
Organisations: 3
People: 11


Characterising radiation damage in shielding materials for fusion energy

Status: Active
Total funding: £0
From: Sept. 30, 2022
To: Sept. 30, 2026
Organisations: 1
People: 0

Marine mussel plaque-inspired anchoring systems for offshore floating structures

Status: Active
Total funding: £1,008,755
From: April 9, 2023
To: March 9, 2025
Organisations: 4
People: 2


Electromagnetic Array Research over a Tectonic Hotspot (EARTH)

Status: Active
Total funding: £8,849,390
From: Sept. 11, 2023
To: Sept. 11, 2028
Organisations: 2
People: 2

H2terascale - Improved oxygen evolution catalysis to enable terawatt scale hydrogen production

Status: Active
Total funding: £1,263,520
From: April 27, 2022
To: Oct. 27, 2023
Organisations: 7
People: 3


Mastering Ion Transport at the Microscale in Solid Electrolytes for Solid-State Batteries

Status: Active
Total funding: £1,736,105
From: May 16, 2021
To: Nov. 16, 2024
Organisations: 10
People: 1

Characterisation and testing of novel electrodes and electrolytes for efficient N2 reduction

Status: Active
Total funding: £0
From: Sept. 30, 2019
To: Dec. 31, 2023
Organisations: 1
People: 0


Up-scaling solar hydrogen production

Status: Active
Total funding: £1,263,350
From: Jan. 1, 2023
To: Nov. 3, 2024
Organisations: 2
People: 1

Modelling and Control of Flexible Structures Interacting with Fluids (ModConFlex)

Status: Active
Total funding: £1,326,255
From: Feb. 1, 2023
To: Jan. 31, 2027
Organisations: 1
People: 1


Upscaling and Manufacturing of Ion-Selective Membranes for Energy Storage (IonMembrane)

Status: Active
Total funding: £635,205
From: April 30, 2023
To: Oct. 31, 2024
Organisations: 1
People: 1

ICE-PICK: Installation effects on cyclic axial and lateral performance of displacement piles in chalk

Status: Active
Total funding: £1,553,320
From: Feb. 11, 2022
To: Feb. 10, 2025
Organisations: 12
People: 1


ENGINEERING HALIDE PEROVSKITES FOR SOLAR FUEL PRODUCTION BY CO2 PHOTOCATALYTIC REDUCTION

Status: Active
Total funding: £0
From: Dec. 1, 2019
To: Jan. 31, 2024
Organisations: 1
People: 1

Next generation particle filters for stochastic partial differential equations

Status: Active
Total funding: £1,523,720
From: June 30, 2022
To: June 30, 2024
Organisations: 1
People: 2


The material-energy nexus: incorporating energy conservation into material flow analysis models

Status: Active
Total funding: £0
From: Oct. 1, 2021
To: March 31, 2025
Organisations: 1
People: 3

Nitrogenase inspired nitrogen electroreduction to ammonia

Status: Active
Total funding: £0
From: Oct. 2, 2022
To: Oct. 2, 2026
Organisations: 2
People: 1


Distributed Learning for Probabilistic Forecasting in Energy Systems

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: April 30, 2024
Organisations: 1
People: 1

MCSIMus: Monte Carlo Simulation with Inline Multiphysics

Status: Active
Total funding: £1,745,025
From: March 31, 2023
To: March 31, 2026
Organisations: 9
People: 2


Flexible organic and hybrid solar cells utilising new photoactive materials

Status: Active
Total funding: £0
From: June 30, 2021
To: March 31, 2025
Organisations: 2
People: 1

A new concept for compact radiation shielding: Reactive sintered tungsten borocarbides

Status: Active
Total funding: £5,590,110
From: March 1, 2021
To: Feb. 28, 2026
Organisations: 5
People: 2


Compositional and Structural Evolution of Plutonium Dioxide: Underpinning Future Decisions

Status: Active
Total funding: £2,232,295
From: Aug. 31, 2020
To: Aug. 31, 2024
Organisations: 1
People: 1

A Bayesian Neural Network (BNN) Machine Learning (ML) Surrogate Modelling Framework for High-Fidelity Thermal Fatigue Modelling of Components

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: Sept. 30, 2025
Organisations: 2
People: 2


Statistical Monitoring and Control of Nuclear Fusion Systems.

Status: Active
Total funding: £0
From: Sept. 30, 2019
To: March 31, 2024
Organisations: 2
People: 1

Process design of new reduced activation ferrite martensite (RAFM) steels for nuclear fusion reactors

Status: Active
Total funding: £1,922,952
From: Jan. 1, 2024
To: Feb. 28, 2027
Organisations: 12
People: 2


Effect of high temperature on chemo-mechanical degradation of compacted clays intended for the isolation of HLW and SNF

Status: Active
Total funding: £1,268,795
From: March 31, 2023
To: March 31, 2026
Organisations: 1
People: 2

CMMI-EPSRC: Quantitative Characterization of Mission Critical Microstructures of Engineering Metals with Diffusive Ultrasound

Status: Active
Total funding: £3,052,775
From: Aug. 28, 2022
To: Aug. 28, 2025
Organisations: 7
People: 1


Model reduction from data

Status: Active
Total funding: £4,038,210
From: March 31, 2022
To: March 31, 2025
Organisations: 1
People: 1

High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen

Status: Active
Total funding: £3,615,525
From: Jan. 10, 2022
To: Jan. 9, 2025
Organisations: 18
People: 5


Atomic-scale design of electrocatalysts for renewable energy conversion and storage in energy-rich

Status: Active
Total funding: £0
From: Oct. 6, 2020
To: March 7, 2024
Organisations: 1
People: 0

Network headroom, engineering upgrades and public acceptance (NEUPA): Connecting engineering for heat system change to consumers and citizens

Status: Active
Total funding: £6,160,045
From: June 30, 2020
To: Jan. 31, 2024
Organisations: 13
People: 8


Aquifer Thermal Energy Storage in the UK

Status: Active
Total funding: £0
From: Oct. 1, 2021
To: March 31, 2025
Organisations: 1
People: 2

Hydro-Mechanics of Fluid-Induced Seismicity in the Context of the Green-Energy Transition

Status: Active
Total funding: £4,689,005
From: Sept. 30, 2022
To: Sept. 30, 2027
Organisations: 12
People: 2


Smart assessment, management and optimisation of urban geothermal resources (SmartRes)

Status: Active
Total funding: £4,829,835
From: Dec. 1, 2022
To: Nov. 30, 2025
Organisations: 9
People: 6

Seismic performance and risk assessment of renewable energy structures

Status: Active
Total funding: £0
From: Nov. 1, 2021
To: April 30, 2025
Organisations: 1
People: 1


Ocean-REFuel - Ocean Renewable Energy Fuels

Status: Active
Total funding: £4,696,480
From: Dec. 1, 2021
To: Nov. 30, 2026
Organisations: 1
People: 1

Future Renewable Energy Systems Under Changing Climate

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: March 31, 2025
Organisations: 2
People: 1


ElementTracker: a digital framework to track elemental flows through the global economy

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: Nov. 10, 2025
Organisations: 1
People: 2

New Approaches to Understanding Hydrogen Embrittlement of Steels

Status: Active
Total funding: £0
From: Jan. 9, 2023
To: Jan. 8, 2027
Organisations: 2
People: 1


Supercharging Metal-Organic Frameworks (SuperMOF)

Status: Active
Total funding: £10,772,215
From: Aug. 31, 2023
To: Aug. 31, 2028
Organisations: 1
People: 1

Integrated Development of Low-Carbon Energy Systems (IDLES): A Whole-System Paradigm for Creating a National Strategy

Status: Active
Total funding: £35,238,320
From: Nov. 1, 2018
To: April 30, 2024
Organisations: 42
People: 17


High-resolution imaging with full-waveform inversion in medicine, wind energy and carbon capture and storage

Status: Active
Total funding: £11,782,810
From: Dec. 6, 2021
To: Dec. 5, 2025
Organisations: 8
People: 2

Enhancing AM part printability at the early design stage: a numerical and data-driven approach of DfAM

Status: Active
Total funding: £0
From: Dec. 1, 2021
To: May 31, 2025
Organisations: 1
People: 1


Next Generation Electro-Chemo-Mechanical Models for Hydrogen Embrittlement (NEXTGEM)

Status: Active
Total funding: £2,289,160
From: Sept. 30, 2021
To: Sept. 30, 2024
Organisations: 3
People: 1

Can quantum algorithms revolutionise the simulation of turbulent flows?

Status: Active
Total funding: £1,009,105
From: Jan. 3, 2023
To: May 2, 2024
Organisations: 2
People: 3


Advanced fracture mechanics modelling to understand earth-environment interactions

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: March 31, 2024
Organisations: 1
People: 3

Scale-resolving simulations of atmosphere / wind farm interactions

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: March 31, 2025
Organisations: 2
People: 2


Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation

Status: Active
Total funding: £12,901,400
From: June 30, 2021
To: June 30, 2026
Organisations: 9
People: 2

Optimisation of ionic liquid-based biomass processing

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: Sept. 30, 2025
Organisations: 1
People: 3


Nanovoids for Developing New Hydrogen-resistant Materials (NanoHMAT)

Status: Active
Total funding: £1,010,795
From: June 30, 2021
To: Oct. 31, 2023
Organisations: 1
People: 1

Towards the Rational Design and Scale-up of Green Photoreactors

Status: Active
Total funding: £0
From: Sept. 30, 2021
To: Sept. 30, 2025
Organisations: 2
People: 2


[D*]stratify: harnessing energetics to control thermally stratified fluids

Status: Active
Total funding: £3,201,295
From: Sept. 19, 2021
To: Sept. 19, 2025
Organisations: 2
People: 3

19-ERACoBioTech- 33 SyCoLim

Status: Active
Total funding: £2,598,115
From: Jan. 15, 2020
To: Jan. 14, 2024
Organisations: 3
People: 2


Harnessing Yarrowia metabolism to generate high value terpenoids

Status: Active
Total funding: £2,629,355
From: Jan. 1, 2021
To: Dec. 31, 2024
Organisations: 2
People: 1

Engineering industrially relevant traits in the farmed insect Hermetia illucens

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: Sept. 30, 2024
Organisations: 2
People: 3


High Frequency Applications of Memristors

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: March 31, 2024
Organisations: 1
People: 1

Towards a Parameter-Free Theory for Electrochemical Phenomena at the Nanoscale (NanoEC)

Status: Active
Total funding: £12,919,880
From: April 30, 2018
To: April 30, 2024
Organisations: 13
People: 2


Resilient Operation of Sustainable Energy Systems (ROSES)

Status: Active
Total funding: £3,878,925
From: June 30, 2020
To: June 30, 2024
Organisations: 9
People: 3

UK National Wind Tunnel Facility

Status: Active
Total funding: £4,067,250
From: March 31, 2023
To: March 31, 2026
Organisations: 1
People: 1


Novel constraints on sources and sinks of methane and carbon monoxide from measurements and modelling of radiocarbon

Status: Active
Total funding: £3,341,300
From: Dec. 1, 2022
To: Nov. 30, 2025
Organisations: 5
People: 2

EPSRC Centre for Doctoral Training in High Performance Embedded and Distributed Systems

Status: Active
Total funding: £20,495,075
From: March 31, 2014
To: March 31, 2024
Organisations: 26
People: 7


3D Printed Zn-ion Batteries For Wearable Devices (3DZnBat)

Status: Active
Total funding: £646,350
From: Jan. 1, 2023
To: June 30, 2024
Organisations: 1
People: 1

Realising Structural Power: Addressing the Manufacturing Challenges

Status: Active
Total funding: £2,523,255
From: May 31, 2023
To: May 31, 2026
Organisations: 8
People: 3


An automated high-throughput robotic platform for accelerated battery and fuels discovery - DIGIBAT

Status: Active
Total funding: £16,564,520
From: Jan. 1, 2023
To: Dec. 31, 2025
Organisations: 12
People: 7

Ion Diffusion in Electrochemical Energy Devices (INDEED)

Status: Active
Total funding: £6,203,880
From: June 30, 2023
To: Sept. 30, 2028
Organisations: 1
People: 1


Investigating coupling of metabolism with gene transcription to support the axonal regeneration programme for repair

Status: Active
Total funding: £4,094,990
From: March 1, 2023
To: Aug. 31, 2026
Organisations: 1
People: 2

SaFEGround - Sustainable, Flexible and Efficient Ground-source heating and cooling systems

Status: Active
Total funding: £7,602,525
From: Aug. 31, 2021
To: Aug. 31, 2024
Organisations: 13
People: 8


INFUSE: Interface with the Future - Underpinning Science to Support the Energy transition

Status: Active
Total funding: £20,957,145
From: Aug. 31, 2021
To: Aug. 31, 2026
Organisations: 4
People: 9

Multiscale, Multi-fidelity and Multiphysics Bayesian Neural Network (BNN) Machine Learning (ML) Surrogate Models for Modelling Design Based Accidents

Status: Active
Total funding: £0
From: Sept. 30, 2022
To: Sept. 30, 2026
Organisations: 2
People: 1


Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe)

Status: Active
Total funding: £4,297,940
From: Sept. 30, 2023
To: Sept. 30, 2027
Organisations: 1
People: 2

Real-time digital optimisation and decision making for energy and transport systems

Status: Active
Total funding: £7,073,065
From: April 30, 2023
To: March 31, 2025
Organisations: 5
People: 4


Sustainable Computing and Communication at the Edge (SONATA)

Status: Active
Total funding: £1,011,290
From: March 1, 2022
To: Feb. 28, 2025
Organisations: 1
People: 2

Enabling CO2 capture and storage using AI

Status: Active
Total funding: £3,945,220
From: April 30, 2023
To: March 31, 2025
Organisations: 1
People: 5


ThorougH experiMental and numerical investigation of Coupled processes for geologiC Carbon Storage

Status: Active
Total funding: £1,020,155
From: Aug. 31, 2023
To: Aug. 31, 2025
Organisations: 2
People: 3

Understanding the physics and optimising Phase Change Material thermal energy storage systems for a sustainable future

Status: Active
Total funding: £0
From: Nov. 1, 2022
To: April 30, 2026
Organisations: 1
People: 0


Global CO2 storage capacity: Modelling limitations of geography and injectivity

Status: Active
Total funding: £0
From: Sept. 30, 2020
To: March 31, 2024
Organisations: 1
People: 2

Bayesian reconstruction of infectious diseases transmission flows at the individual and population levels

Status: Active
Total funding: £0
From: Sept. 30, 2019
To: Dec. 31, 2023
Organisations: 1
People: 1


Bayesian reconstruction of infectious diseases transmission flows at the individual and population levels

Status: Active
Total funding: £0
From: Sept. 30, 2019
To: Dec. 31, 2023
Organisations: 1
People: 1

Quantifying the true carbon removal potential of enhanced rock weathering

Status: Active
Total funding: £4,201,695
From: Feb. 16, 2024
To: Feb. 15, 2027
Organisations: 1
People: 4


Designing Distributed Direct Air Capture (DAC) of CO2 in ambient conditions using Electroswing Systems

Status: Active
Total funding: £0
From: Oct. 3, 2021
To: Sept. 30, 2025
Organisations: 1
People: 1

Biomimetic Water Based Lubrication Development: Nanoencapsulation with Liposomes

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: Aug. 31, 2023
Organisations: 2
People: 3


Technology Transformation to Support Flexible and Resilient Local Energy Systems

Status: Closed
Total funding: £4,043,790
From: June 30, 2020
To: Sept. 30, 2023
Organisations: 7
People: 6

EPSRC Centre for Doctoral Training in Nuclear Energy: Building UK Civil Nuclear Skills for Global Markets.

Status: Closed
Total funding: £20,887,020
From: March 31, 2014
To: Sept. 30, 2023
Organisations: 25
People: 7


Thermal Hydraulics for Boiling and Passive Systems

Status: Closed
Total funding: £3,985,730
From: March 18, 2013
To: Dec. 17, 2015
Organisations: 2
People: 6

Assessing the feasibility of vertical farming for second generation bioenergy crops

Status: Closed
Total funding: £1,827,635
From: Jan. 1, 2018
To: April 19, 2020
Organisations: 5
People: 2


HubNet: Research Leadership and Networking for Energy Networks (Extension)

Status: Closed
Total funding: £10,249,375
From: May 31, 2016
To: Sept. 30, 2018
Organisations: 7
People: 3

Investigation of Practical Electro-catalysis using the Floating Electrode

Status: Closed
Total funding: £0
From: Oct. 14, 2017
To: Jan. 14, 2022
Organisations: 2
People: 1


Probing surface-molecule interactions of perovskite catalysts

Status: Closed
Total funding: £67,180
From: April 30, 2014
To: June 30, 2015
Organisations: 1
People: 1

Biomass Derived Transport Fuels via Fischer-Tropsch Synthesis

Status: Closed
Total funding: £0
From: March 31, 2016
To: Dec. 30, 2019
Organisations: 1
People: 2


Siemens-EPSRC: Blockchain-enabled cloud-edge coordination for demand side manangement

Status: Closed
Total funding: £251,725
From: March 1, 2022
To: Feb. 28, 2023
Organisations: 2
People: 2

Reconfigurable Distribution Networks

Status: Closed
Total funding: £6,119,300
From: July 13, 2014
To: Dec. 31, 2017
Organisations: 9
People: 6


Solar Fuels

Status: Closed
Total funding: £1,264,855
From: July 31, 2013
To: April 30, 2017
Organisations: 3
People: 2

Prediction of power losses in electric vehicle transmissions

Status: Closed
Total funding: £0
From: Sept. 5, 2019
To: March 5, 2023
Organisations: 1
People: 1


Polymeric Additives in Lubricants for Electric Vehicle Powertrains

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: March 31, 2023
Organisations: 1
People: 1

Impact of hybrid/electric vehicles on urban air pollution

Status: Closed
Total funding: £0
From: Nov. 1, 2018
To: Oct. 31, 2022
Organisations: 2
People: 1


Modelling the eco-hydraulic impacts of tidal energy projects

Status: Closed
Total funding: £157,470
From: Nov. 1, 2017
To: April 30, 2018
Organisations: 2
People: 2

Energy-Use Minimisation via High Performance Heat-Power-Cooling Conversion and Integration: A Holistic Molecules to Technologies to Systems Approach

Status: Closed
Total funding: £7,867,610
From: Dec. 15, 2016
To: Sept. 14, 2021
Organisations: 28
People: 8


Nano-structured Catalysts for CO2 Transformation to Fuels and Products

Status: Closed
Total funding: £7,440,825
From: April 30, 2013
To: April 30, 2017
Organisations: 15
People: 5

Improving Prediction of Fronts

Status: Closed
Total funding: £1,527,740
From: March 30, 2014
To: May 31, 2017
Organisations: 4
People: 1


Revolutionary Electric Vehicle Battery (REVB)

Status: Closed
Total funding: £4,137,510
From: Jan. 1, 2014
To: May 5, 2017
Organisations: 2
People: 3

Nuclear Universities Consortium for Learning, Engagement And Research: NUCLEAR

Status: Closed
Total funding: £77,673,270
From: April 30, 2011
To: Oct. 31, 2019
Organisations: 1
People: 6


Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels

Status: Closed
Total funding: £3,325,150
From: Dec. 1, 2016
To: Nov. 30, 2020
Organisations: 12
People: 1

Discontinuous and Continuous Virtual Element Methods (VEM) for Robust Meshing and Modelling of Complex Geometries in Radiation Shielding Analysis and

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: June 30, 2021
Organisations: 2
People: 1


Optimisation of prefabricated construction processes

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: March 31, 2021
Organisations: 2
People: 3

System Architecture Challenges: Supergen+ for HubNet

Status: Closed
Total funding: £3,819,895
From: Jan. 1, 2015
To: Dec. 31, 2016
Organisations: 3
People: 13


Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions

Status: Closed
Total funding: £505,310
From: May 31, 2018
To: June 30, 2020
Organisations: 7
People: 1

Investigating carbon formation in solid oxide fuel cell range extenders operating on sustainable alcohol fuels for electric vehicles

Status: Closed
Total funding: £4,563,395
From: Sept. 30, 2010
To: Sept. 30, 2015
Organisations: 1
People: 1


Multi-species effects in magnetically driven implosions

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: May 30, 2023
Organisations: 1
People: 2

A Radiation-Hydrodynamic ALE Code for Laser Fusion Energy

Status: Closed
Total funding: £1,075,300
From: Sept. 30, 2011
To: Sept. 30, 2013
Organisations: 1
People: 1


The UK Inertial Fusion Energy Network

Status: Closed
Total funding: £1,608,510
From: Nov. 1, 2013
To: Oct. 31, 2015
Organisations: 2
People: 1

A Study of the Combined Effects of Displacement Damage and Helium Accumulation in Model Nuclear Materials

Status: Closed
Total funding: £4,449,190
From: Feb. 24, 2015
To: Dec. 31, 2019
Organisations: 8
People: 2


A combined peridynamics and FE modelling approach to nuclear power plant materials

Status: Closed
Total funding: £461,885
From: Feb. 25, 2013
To: Aug. 24, 2014
Organisations: 4
People: 1

Advanced Waste Management Strategies for High Dose Spent Adsorbents

Status: Closed
Total funding: £958,430
From: Nov. 30, 2015
To: March 29, 2018
Organisations: 5
People: 2


Data-Driven Power System Operation

Status: Closed
Total funding: £0
From: Jan. 1, 2017
To: June 30, 2020
Organisations: 1
People: 2

Determination of Surface and Interface Processes in Materials Science

Status: Closed
Total funding: £11,604,120
From: July 31, 2009
To: July 31, 2013
Organisations: 1
People: 8


Engineered bulk heterojunction inorganic:organic hybrid photovoltaics

Status: Closed
Total funding: £499,540
From: Sept. 30, 2012
To: Sept. 30, 2013
Organisations: 2
People: 1

Novel Adaptive Filtering Techniques for Multidimensional Signals

Status: Closed
Total funding: £1,649,235
From: Feb. 1, 2010
To: Jan. 31, 2013
Organisations: 3
People: 1


AGRI-SCIENCE CHEMICAL BIOLOGY NETWORK: AGRI-net

Status: Closed
Total funding: £1,169,940
From: May 26, 2011
To: May 12, 2014
Organisations: 8
People: 2

ISCF Wave 1:Designing Electrodes for Na Ion Batteries via Structure Electrochemical Performance Correlations

Status: Closed
Total funding: £4,032,880
From: Jan. 1, 2019
To: Oct. 31, 2021
Organisations: 2
People: 5


Engineering halide perovskites for artificial leaves

Status: Closed
Total funding: £311,305
From: Nov. 1, 2019
To: Sept. 30, 2020
Organisations: 1
People: 1

Core Support for Collaborative Research in Glycobiology

Status: Closed
Total funding: £7,051,625
From: June 30, 2013
To: June 30, 2017
Organisations: 29
People: 3


Attosecond Electron Dynamics in Molecular and Condensed Phase Systems

Status: Closed
Total funding: £29,192,545
From: May 31, 2011
To: May 31, 2017
Organisations: 3
People: 9

Network for the sustainable use of energy in water and wastewater treatment

Status: Closed
Total funding: £458,260
From: Nov. 1, 2006
To: Oct. 31, 2009
Organisations: 17
People: 2


Materials Informatics for Solar Energy Conversion

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: Sept. 30, 2021
Organisations: 1
People: 1

Reliable and Efficient System for Community Energy Solution- RESCUES

Status: Closed
Total funding: £4,775,460
From: Feb. 1, 2014
To: March 29, 2018
Organisations: 6
People: 5


Centre for Synthetic Biology and Innovation at Imperial College

Status: Closed
Total funding: £23,550,700
From: Jan. 7, 2009
To: Oct. 6, 2014
Organisations: 1
People: 4

EPSRC Centre for Doctoral Training in Industrial Functional Coatings: COATED2

Status: Closed
Total funding: £13,477,350
From: May 17, 2015
To: March 31, 2023
Organisations: 18
People: 2


Modelling Extreme Free-Surface Flows: applications to breaking waves, wave-structure and wave-vessel interactions

Status: Closed
Total funding: £1,854,290
From: July 8, 2008
To: April 8, 2012
Organisations: 7
People: 1

Killing two birds with one stone: Can fuel cells operate on a high energy density fuel derived from coal?

Status: Closed
Total funding: £940,245
From: March 31, 2008
To: Sept. 30, 2009
Organisations: 1
People: 1


Asymptotic solutions of the plasmonic eigenvalue problem and applications

Status: Closed
Total funding: £975,500
From: Nov. 1, 2018
To: Feb. 20, 2021
Organisations: 2
People: 1

Waste water re-mediation and power generation using an electrochemical device

Status: Closed
Total funding: £760,960
From: Feb. 1, 2016
To: April 30, 2017
Organisations: 3
People: 1


RESEARCH COUNCILS UK ENERGY PROGRAMME: ENERGY STRATEGY FELLOWSHIP

Status: Closed
Total funding: £18,767,910
From: March 31, 2012
To: March 31, 2017
Organisations: 6
People: 2

Self-assembled organic photovoltaic materials

Status: Closed
Total funding: £1,585,260
From: March 3, 2014
To: Sept. 30, 2017
Organisations: 5
People: 1


HubNet: Research Leadership and Networking for Energy Networks

Status: Closed
Total funding: £23,729,995
From: May 31, 2011
To: May 31, 2016
Organisations: 7
People: 15

Improving stability of iridium oxide based anodes for water electrolysis

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: Dec. 31, 2022
Organisations: 3
People: 1


New-ACE: A Network for New Academics in Control Engineering

Status: Closed
Total funding: £366,905
From: Sept. 30, 2007
To: Sept. 30, 2010
Organisations: 4
People: 2

Tidal energy operational and spatial planning optimisation

Status: Closed
Total funding: £1,771,370
From: Dec. 1, 2017
To: Sept. 30, 2018
Organisations: 6
People: 2


Hydrothermal Upgrading of Biomass/Lignin

Status: Closed
Total funding: £0
From: Nov. 1, 2018
To: July 31, 2022
Organisations: 1
People: 1

Broadband Coupling of Surface Plasmons in Metal Nanoparticles with Slow Photons in WO3 Inverse Opals as a Novel Photon Management Approach for Solar W

Status: Closed
Total funding: £0
From: Nov. 1, 2016
To: Nov. 30, 2020
Organisations: 1
People: 1


Control For Energy and Sustainability

Status: Closed
Total funding: £27,682,470
From: Sept. 30, 2009
To: March 31, 2015
Organisations: 9
People: 12

Transport through Carbon electrodes and New Catalysts for an Organic-Air Hybrid Redox Flow Battery

Status: Closed
Total funding: £0
From: Feb. 1, 2018
To: July 31, 2021
Organisations: 2
People: 2


Optimisation of large concrete DfMA structures for the Nuclear Industry

Status: Closed
Total funding: £1,335,485
From: July 4, 2013
To: July 4, 2016
Organisations: 4
People: 2

Atomic and Macro-scale Studies of Surface Processes: Towards a Mechanistic Understanding of Surface Reactivity and Radionuclide Binding Mechanisms

Status: Closed
Total funding: £4,807,160
From: March 31, 2012
To: March 31, 2016
Organisations: 1
People: 6


Validation & Verification for Critical Heat Flux and CFD

Status: Closed
Total funding: £1,037,475
From: Aug. 31, 2011
To: May 31, 2015
Organisations: 2
People: 4

New and Renewable Solar Routes to Hydrogen Energy

Status: Closed
Total funding: £20,533,430
From: Sept. 30, 2007
To: Sept. 30, 2012
Organisations: 3
People: 8


Multi-scale Energy Systems Modelling Encompassing Renewable, Intermittent, Stored Energy and Carbon Capture and Storage (MESMERISE-CCS)

Status: Closed
Total funding: £9,965,740
From: Oct. 19, 2014
To: Oct. 19, 2018
Organisations: 12
People: 5

Coal-Air fuel cells and CO2 utilisation

Status: Closed
Total funding: £0
From: Sept. 30, 2016
To: Oct. 31, 2017
Organisations: 2
People: 1


Investigations of HTGR Reactor Building Response to Break in Primary Coolant Boundary

Status: Closed
Total funding: £2,096,865
From: Jan. 1, 2020
To: Dec. 31, 2022
Organisations: 2
People: 3

Grace Time

Status: Closed
Total funding: £3,405,655
From: Dec. 1, 2015
To: May 31, 2020
Organisations: 3
People: 6


Adaptive hierarchical radiation transport methods to meet future challenges in reactor physics

Status: Closed
Total funding: £5,796,670
From: Dec. 1, 2011
To: Nov. 30, 2015
Organisations: 4
People: 8

Modelling hyperbolic and elliptic elasticity with discontinuous coefficients using an error driven adaptive isogeometric basis

Status: Closed
Total funding: £382,580
From: Sept. 30, 2022
To: Sept. 30, 2023
Organisations: 1
People: 2


Using individual metabolism and body size to predict climate warming impacts on aquatic food webs

Status: Closed
Total funding: £923,000
From: March 1, 2013
To: Sept. 30, 2014
Organisations: 1
People: 3

Coal-Air fuel cells and CO2 utilisation

Status: Closed
Total funding: £0
From: Feb. 1, 2018
To: May 31, 2018
Organisations: 2
People: 1


Opportunities for Climate Mitigation and Sustainable Development (OPTIMISM)

Status: Closed
Total funding: £1,315,415
From: Feb. 14, 2019
To: Feb. 13, 2022
Organisations: 4
People: 8

Self-organized nanostructures and transparent conducting electrodes for low cost scaleable organic photovoltaic devices

Status: Closed
Total funding: £5,955,860
From: April 30, 2008
To: April 30, 2011
Organisations: 3
People: 5


Critical Analysis of Spent Fuel Structure in Radionuclide Release

Status: Closed
Total funding: £5,964,415
From: Oct. 2, 2016
To: Oct. 2, 2022
Organisations: 16
People: 3

Performance and Reliability of Metallic Materials for Nuclear Fission Power Generation

Status: Closed
Total funding: £2,090,585
From: Sept. 30, 2010
To: Sept. 30, 2014
Organisations: 2
People: 7


Carbides for Future Fission Environments (CAFFE)

Status: Closed
Total funding: £2,276,080
From: June 30, 2015
To: June 30, 2019
Organisations: 2
People: 4

Fundamental Properties of Thoria Based Mixed Oxides

Status: Closed
Total funding: £1,912,675
From: March 31, 2013
To: Sept. 30, 2017
Organisations: 6
People: 1


Development and Validation of Thermal-Hydraulic ... in BWR's and PWR's: Can modern CFD models reliably predict DNB for nuclear power applications?

Status: Closed
Total funding: £2,976,205
From: Aug. 31, 2018
To: Aug. 31, 2022
Organisations: 2
People: 5

COMPUTATIONAL MODELLING FOR ADVANCED NUCLEAR POWER PLANTS

Status: Closed
Total funding: £7,846,155
From: Dec. 20, 2010
To: Dec. 19, 2014
Organisations: 1
People: 12


A new simulation and optimisation platform for marine technology

Status: Closed
Total funding: £2,173,555
From: March 1, 2015
To: Aug. 28, 2018
Organisations: 10
People: 6

EnergyScapes and Ecosystem Services

Status: Closed
Total funding: £106,715
From: April 30, 2010
To: April 30, 2011
Organisations: 1
People: 1


Dislocation based modelling of deformation and fracture in real engineering alloys

Status: Closed
Total funding: £3,340,260
From: Nov. 1, 2015
To: Jan. 31, 2021
Organisations: 7
People: 2

Indo-UK Civil Nuclear Network

Status: Closed
Total funding: £1,022,665
From: Nov. 1, 2015
To: Oct. 31, 2019
Organisations: 2
People: 3


Reactor core-structure re-location modelling for severe nuclear accidents

Status: Closed
Total funding: £1,220,355
From: Nov. 30, 2014
To: April 29, 2017
Organisations: 2
People: 8

Investigation of the safe removal of fuel debris: multi-physics simulation

Status: Closed
Total funding: £2,520,115
From: Nov. 1, 2016
To: Sept. 30, 2019
Organisations: 3
People: 2


Indo - UK: Premature, Oscillation-Induced Critical Heat Flux ("Premature OICHF")

Status: Closed
Total funding: £563,645
From: Dec. 1, 2015
To: Nov. 30, 2018
Organisations: 2
People: 4

Atomistic Scale Study of Radiation Effects in ABO3 Perovskites

Status: Closed
Total funding: £1,204,395
From: May 20, 2014
To: May 20, 2018
Organisations: 1
People: 1


Modelling surface effects in two-phase fluid processes across scales

Status: Closed
Total funding: £1,969,210
From: Aug. 31, 2020
To: Jan. 31, 2022
Organisations: 6
People: 2

Predictive Modelling for Nuclear Engineering

Status: Closed
Total funding: £3,310,750
From: Jan. 1, 2016
To: June 18, 2017
Organisations: 21
People: 2


Realising the Commercial Potential of the Multi-Physics and Multi-Scale FETCH Technology for Nuclear Safety Applications

Status: Closed
Total funding: £529,605
From: Aug. 31, 2010
To: Aug. 31, 2011
Organisations: 1
People: 7

The UK Nuclear Data Network

Status: Closed
Total funding: £4,918,770
From: March 31, 2016
To: March 31, 2022
Organisations: 11
People: 3


MBase: The Molecular Basis of Advanced Nuclear Fuel Separations

Status: Closed
Total funding: £660,780
From: May 31, 2010
To: Nov. 30, 2013
Organisations: 10
People: 4

Future-proofing facilities management (Future FM )

Status: Closed
Total funding: £4,897,000
From: Sept. 29, 2014
To: March 31, 2018
Organisations: 10
People: 4


From Individuals to Ecosystems: Scaling metabolic theory to predict ecosystem function with global change

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: June 30, 2021
Organisations: 1
People: 1

Magnetic writing in nanostructured arrays

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: June 30, 2022
Organisations: 1
People: 4


Potential Drop Monitoring of Creep Damage

Status: Closed
Total funding: £1,420,740
From: Dec. 31, 2012
To: Dec. 30, 2015
Organisations: 4
People: 2

Immersion cooling of lithium-ion batteries with dielectric fluids

Status: Closed
Total funding: £0
From: Sept. 22, 2019
To: Sept. 30, 2022
Organisations: 2
People: 2


Shock/turbulence interactions in dense gases

Status: Closed
Total funding: £501,105
From: June 29, 2014
To: June 29, 2015
Organisations: 3
People: 1

Quantifying Oceanic Whitecap Energy Dissipation and Bubble-Mediated Air-Sea Fluxes

Status: Closed
Total funding: £2,847,515
From: Sept. 30, 2019
To: Sept. 30, 2023
Organisations: 5
People: 1


SOPs annd PECs in distribution networks - control interactions and operational logic

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: Dec. 31, 2022
Organisations: 1
People: 2

Advanced SOFC technologies for low carbon, energy efficient and affordable power

Status: Closed
Total funding: £1,942,825
From: June 30, 2007
To: June 30, 2010
Organisations: 9
People: 2


Business, Economics, Planning and Policy for Energy Storage in Low-Carbon Futures

Status: Closed
Total funding: £5,087,505
From: Aug. 31, 2014
To: Sept. 30, 2017
Organisations: 12
People: 3

Resilient and Sustainable Infrastructure Systems Design and Analysis

Status: Closed
Total funding: £0
From: Nov. 12, 2019
To: May 11, 2023
Organisations: 1
People: 2


DEMSIS: Digital energy management services in supermarket buildings via cloud-based solutions

Status: Closed
Total funding: £251,085
From: March 1, 2022
To: Nov. 30, 2022
Organisations: 4
People: 3

SusTEM Network: Sustainhermal Energy Management Network

Status: Closed
Total funding: £771,140
From: Dec. 1, 2013
To: May 31, 2016
Organisations: 19
People: 1


Multilevel Inverter Topologies for MVDC

Status: Closed
Total funding: £0
From: Dec. 1, 2017
To: May 31, 2021
Organisations: 1
People: 1

PLATFORM GRANT RENEWAL - ELECTRICAL ENERGY INFRASTRUCTURE TO 2050

Status: Closed
Total funding: £1,456,440
From: Dec. 15, 2007
To: Dec. 14, 2011
Organisations: 5
People: 1


ZEFAL The Zero Fault Level Generator for Active Urban Networks

Status: Closed
Total funding: £390,105
From: March 31, 2008
To: March 31, 2010
Organisations: 1
People: 3

Designing low carbon pathways for rural electrification

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: June 30, 2022
Organisations: 2
People: 1


Investigation of Technologies for Fault Level Management in Future Distribution Networks

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: Feb. 28, 2022
Organisations: 1
People: 2

Advanced modelling and operation of multiple voltage source inverters for distributed generation

Status: Closed
Total funding: £1,010,115
From: Sept. 30, 2007
To: Sept. 30, 2010
Organisations: 1
People: 2


Control of inverter-based distributed generation in low-inertia power systems

Status: Closed
Total funding: £0
From: Sept. 29, 2019
To: June 30, 2023
Organisations: 1
People: 2

DD-DSM: Demonstration of Distributed Demand-side Management as a service to the UK grid operator

Status: Closed
Total funding: £1,111,385
From: Jan. 1, 2009
To: Dec. 31, 2010
Organisations: 1
People: 1


3D audio techniques for acoustic monitoring of rainforest biodiversity

Status: Closed
Total funding: £0
From: Sept. 28, 2018
To: Sept. 28, 2022
Organisations: 1
People: 1

"The Quantum Ratchet Concept for Ultra efficient Solar Cells"

Status: Closed
Total funding: £6,570,720
From: May 31, 2013
To: May 31, 2018
Organisations: 5
People: 3


COnsumer-centric Privacy in smart Energy gridS

Status: Closed
Total funding: £1,714,420
From: Dec. 18, 2015
To: March 29, 2019
Organisations: 4
People: 1

Developing strategies and a toolbox for metabolic engineering of thermophiles for ethanol production

Status: Closed
Total funding: £1,690,435
From: Feb. 1, 2007
To: May 31, 2010
Organisations: 2
People: 1


Differentially Private Smart Meter Data Markets: An Interdisciplinary Approach

Status: Closed
Total funding: £0
From: Jan. 1, 2019
To: March 31, 2022
Organisations: 1
People: 2

Algorithms for Industrial Demand-Side Management Under Uncertainty

Status: Closed
Total funding: £3,505,420
From: Aug. 25, 2020
To: Aug. 25, 2023
Organisations: 5
People: 2


Plug and play fault-tolerant control

Status: Closed
Total funding: £0
From: Sept. 30, 2016
To: March 31, 2020
Organisations: 1
People: 1

RHYTHM: Resilient Hybrid Technology for High-Value Microgrids

Status: Closed
Total funding: £4,926,215
From: June 30, 2016
To: March 31, 2019
Organisations: 5
People: 5


Market Design of a Blockchain-enabled, Peer-to-Peer, Low-carbon Microgrid

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: Dec. 31, 2022
Organisations: 2
People: 1

Energy Storage Network

Status: Closed
Total funding: £2,469,065
From: Sept. 30, 2012
To: March 31, 2016
Organisations: 2
People: 2


Developing novel molecular tools for characterising food web responses to climate change

Status: Closed
Total funding: £0
From: Oct. 2, 2015
To: Sept. 30, 2019
Organisations: 1
People: 1

MODELLING METASURFACES

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: March 31, 2021
Organisations: 5
People: 1


Towards a unified approach for the hydrodynamic modelling of WECs: Effective linkage of non-linearity and viscous damping in potential flow models

Status: Closed
Total funding: £502,305
From: Oct. 2, 2014
To: Oct. 2, 2015
Organisations: 3
People: 1

Investigation of Water Oxidizing Catalysis for Renewable Energy

Status: Closed
Total funding: £2,453,415
From: Oct. 12, 2008
To: Oct. 12, 2013
Organisations: 1
People: 1


Climate-scale analysis of changing air and water masses

Status: Closed
Total funding: £1,569,320
From: Jan. 1, 2014
To: June 30, 2017
Organisations: 9
People: 3

Validating Ground Motion Models For Critical Engineered Structures Using Fragile Geologic Features

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: Sept. 30, 2021
Organisations: 1
People: 4


Modelling Marine Renewable Energy Devices; Designing for Survivability

Status: Closed
Total funding: £5,198,085
From: June 29, 2012
To: Dec. 29, 2015
Organisations: 8
People: 7

CO2 injection and storage - Short and long-term behaviour at different spatial scales

Status: Closed
Total funding: £6,061,020
From: Nov. 1, 2013
To: Aug. 31, 2017
Organisations: 3
People: 8


Large-area electronics based on two-dimensional atomically thin materials

Status: Closed
Total funding: £515,355
From: June 30, 2013
To: June 30, 2014
Organisations: 6
People: 1

Innovative concepts from Electrodes to Stacks

Status: Closed
Total funding: £5,021,945
From: Feb. 1, 2015
To: July 31, 2018
Organisations: 8
People: 4


Developing an experimental functional map of polymer electrolyte fuel cell operation

Status: Closed
Total funding: £1,505,520
From: March 31, 2009
To: March 31, 2012
Organisations: 6
People: 2

Electrodes by Design - Microstructural Engineering of High Performance Electrodes for Solid Oxide Fuel Cells

Status: Closed
Total funding: £6,236,825
From: April 30, 2015
To: Oct. 31, 2018
Organisations: 6
People: 6


AURA-NMS: Autonomous Regional Active Network Management System

Status: Closed
Total funding: £12,561,680
From: Jan. 1, 2007
To: June 30, 2010
Organisations: 8
People: 15

Novel diagnostic tools and techniques for monitoring and control of SOFC stacks - understanding mechanical and structural change

Status: Closed
Total funding: £4,002,345
From: May 31, 2015
To: Nov. 30, 2018
Organisations: 1
People: 4


Transformation of the Top and Tail of Energy Networks

Status: Closed
Total funding: £20,660,355
From: Sept. 30, 2011
To: Sept. 30, 2015
Organisations: 4
People: 22

MSc Environmental Technology

Status: Closed
Total funding: £1,269,030
From: Aug. 31, 2006
To: Aug. 31, 2009
Organisations: 1
People: 2


Very Low Field 2.35 T Solid State NMR Console and Fast MAS NMR Probe for the Study of Paramagnetic Materials Systems

Status: Closed
Total funding: £324,985
From: July 31, 2013
To: July 31, 2015
Organisations: 10
People: 1

Understanding Bose-Einstein Condensation of Light

Status: Closed
Total funding: £1,277,340
From: Jan. 1, 2015
To: Dec. 31, 2017
Organisations: 3
People: 2


Pore scale release and transport of oil by low salinity water

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: Dec. 31, 2022
Organisations: 2
People: 2

Support for the UK Car-Parrinello Consortium

Status: Closed
Total funding: £118,555
From: Nov. 1, 2008
To: Oct. 31, 2012
Organisations: 1
People: 2


Analysis and control of electrical networks dominated by power electronic converters

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: June 30, 2023
Organisations: 1
People: 2

Smart homes, towards individualised campaigns to manage domestic energy consumption

Status: Closed
Total funding: £0
From: Sept. 30, 2016
To: March 31, 2020
Organisations: 1
People: 2


Smart homes, towards individualised campaigns to manage domestic energy consumption

Status: Closed
Total funding: £0
From: Sept. 30, 2016
To: March 31, 2020
Organisations: 1
People: 2

Stability and Control of Power Networks with Energy Storage (STABLE-NET)

Status: Closed
Total funding: £5,240,400
From: Sept. 29, 2014
To: March 29, 2018
Organisations: 11
People: 6


Metal substrate mounted flexible dye sensitised semiconductor solar cells

Status: Closed
Total funding: £2,540,640
From: Feb. 12, 2007
To: May 11, 2010
Organisations: 3
People: 2

Essays in environmental economics: assessing externalities from distributed infrastructure

Status: Closed
Total funding: £0
From: Sept. 30, 2016
To: March 31, 2021
Organisations: 1
People: 1


Enhanced Renewable Integration through Flexible Transmission Options (ERIFT)

Status: Closed
Total funding: £4,402,155
From: March 31, 2013
To: March 31, 2016
Organisations: 4
People: 5

EPSRC - Energy Research Senior Fellow

Status: Closed
Total funding: £5,621,050
From: July 31, 2006
To: July 31, 2014
Organisations: 1
People: 1


Energy research development manager at Imperial College London (Linked to EP/E011705)

Status: Closed
Total funding: £966,880
From: July 31, 2006
To: July 31, 2009
Organisations: 1
People: 2

The Synthesis of Mathematical and Data Driven Modelling of Complex Physical Systems

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: Dec. 31, 2022
Organisations: 2
People: 2


ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing

Status: Closed
Total funding: £5,606,540
From: Sept. 30, 2017
To: March 31, 2020
Organisations: 14
People: 5

FENGBO-WIND - Farming the ENvironment into the Grid: Big data in Offshore Wind

Status: Closed
Total funding: £4,062,070
From: July 2, 2017
To: Jan. 2, 2021
Organisations: 15
People: 5


SWEPT2

Status: Closed
Total funding: £355,040
From: April 30, 2015
To: April 30, 2018
Organisations: 1
People: 1

Maximising the Carbon Impact of Wind Power

Status: Closed
Total funding: £2,357,400
From: Nov. 1, 2015
To: April 30, 2018
Organisations: 9
People: 4


KES - Kite Energy Scheme

Status: Closed
Total funding: £495,355
From: May 31, 2016
To: Nov. 30, 2018
Organisations: 1
People: 1

AI applications in future energy markets: Market implications and regulatory requirements

Status: Closed
Total funding: £0
From: Sept. 30, 2020
To: Nov. 30, 2021
Organisations: 2
People: 2


Determining ancient magnetic field strengths from the Earth and Solar System

Status: Closed
Total funding: £3,011,730
From: Jan. 1, 2019
To: June 30, 2022
Organisations: 2
People: 3

Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate

Status: Closed
Total funding: £493,605
From: July 27, 2016
To: Aug. 28, 2017
Organisations: 2
People: 1


Meteorites as free sample-returns: Operation of the UK Desert Fireball Network

Status: Closed
Total funding: £1,503,095
From: Sept. 27, 2008
To: Sept. 27, 2011
Organisations: 6
People: 1

Engineering the bacterium Rhodopseudomonas palustris as a platform for electrosynthetic bioproduction

Status: Closed
Total funding: £2,748,810
From: March 1, 2018
To: Jan. 28, 2023
Organisations: 1
People: 3


Beyond Iron in the Ocean: Trace metal micronutrients and the carbon cycle (BIO-Trace)

Status: Closed
Total funding: £2,806,165
From: Jan. 1, 2018
To: June 30, 2019
Organisations: 3
People: 2

High Temperature, High Efficiency PV-Thermal Solar System

Status: Closed
Total funding: £5,544,675
From: July 31, 2015
To: Jan. 31, 2019
Organisations: 3
People: 6


Future Vaccine Manufacturing Hub: Advancing the manufacture and deployment of cost effective vaccines

Status: Closed
Total funding: £62,759,750
From: Dec. 1, 2017
To: Sept. 1, 2023
Organisations: 15
People: 14

Sustainable Sunlight Driven Bioproduction of Multi Purpose Chemicals

Status: Closed
Total funding: £0
From: Sept. 27, 2019
To: Dec. 20, 2022
Organisations: 1
People: 2


Sustainable excretable biofuels process design and optimisation

Status: Closed
Total funding: £3,040,000
From: May 21, 2017
To: May 21, 2020
Organisations: 5
People: 2

Trajectory Control of Very Flexible Aircraft

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: March 31, 2022
Organisations: 1
People: 1


A centre for doctoral training on the theory and simulation of materials

Status: Closed
Total funding: £32,091,475
From: Sept. 30, 2009
To: March 31, 2018
Organisations: 2
People: 3

Continuous monitoring of rainforest biodiversity via acoustic signal processing

Status: Closed
Total funding: £724,000
From: May 30, 2014
To: May 30, 2015
Organisations: 2
People: 3


Enabling Oxidation Reactions on a Large Scale: Combining Electrochemistry with Flow

Status: Closed
Total funding: £2,182,095
From: March 7, 2009
To: Sept. 6, 2011
Organisations: 2
People: 3

Oxidation of nickel superalloys for aero-engine applications

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: Oct. 20, 2023
Organisations: 2
People: 2


Instilling Defect-Tolerance in ABZ2 Photovoltaic Materials

Status: Closed
Total funding: £2,186,490
From: June 30, 2021
To: Sept. 30, 2022
Organisations: 8
People: 1

Digital City Exchange

Status: Closed
Total funding: £29,652,395
From: Sept. 18, 2011
To: Sept. 18, 2017
Organisations: 2
People: 14


High stability and high efficiency printable photovoltaics (OPV) for large-scale energy production

Status: Closed
Total funding: £4,323,275
From: Sept. 30, 2008
To: Jan. 31, 2013
Organisations: 5
People: 4

Electroreduction of Carbon Dioxide to Sustainable Fuels

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: March 31, 2023
Organisations: 1
People: 1


iTurbo: Exhaust Energy Recovery in Low Carbon Vehicles by Intelligent Turbocharging

Status: Closed
Total funding: £962,075
From: July 3, 2010
To: Jan. 3, 2012
Organisations: 1
People: 2

DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS

Status: Closed
Total funding: £580,095
From: Sept. 30, 2007
To: Sept. 30, 2010
Organisations: 1
People: 1


ENGINEERING SYNTHETIC MICROBIAL COMMUNITIES FOR BIOTECHNOLOGY

Status: Closed
Total funding: £1,947,460
From: Nov. 12, 2018
To: March 11, 2023
Organisations: 7
People: 1

IONIC-LIQUID IN CONFINED ENVIRONMENTS: EXPERIMENTS AND SIMULATION

Status: Closed
Total funding: £1,548,890
From: Feb. 1, 2010
To: April 30, 2013
Organisations: 9
People: 1


A bidirectional power/data transfer platform based on electro-optical effects in standard CMOS

Status: Closed
Total funding: £765,775
From: Oct. 11, 2009
To: Oct. 11, 2012
Organisations: 3
People: 1

Directed Assembly of High Aspect Ratio Nanoparticles for Hierarchical Materials

Status: Closed
Total funding: £6,909,690
From: Nov. 17, 2008
To: March 31, 2014
Organisations: 9
People: 1


Advanced Gas Turbine cycles for high efficiency and sustainable future conventional generation

Status: Closed
Total funding: £4,859,930
From: May 31, 2015
To: Nov. 30, 2018
Organisations: 4
People: 7

Optimal sensor deployment and data analytics for power distribution network visibility and control

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: May 31, 2022
Organisations: 1
People: 2


Integrated Functional Materials for System-in-Package Applications

Status: Closed
Total funding: £2,139,365
From: Sept. 30, 2006
To: March 31, 2010
Organisations: 1
People: 2

New click reactions for conjugated polymers

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: April 30, 2021
Organisations: 1
People: 1


Opening New Fuels for UK Generation

Status: Closed
Total funding: £5,178,025
From: March 31, 2015
To: Sept. 30, 2018
Organisations: 11
People: 13

RF Energy Harvesting Communications

Status: Closed
Total funding: £492,055
From: Dec. 22, 2014
To: Dec. 21, 2015
Organisations: 4
People: 1


A Firm-level evaluation of the European Union Emissions Trading System

Status: Closed
Total funding: £398,805
From: June 28, 2012
To: Dec. 28, 2014
Organisations: 1
People: 4

Application of metabolic flux and transcript analyses to understanding the physiology of engineered geobacillus thermoglucosidasius

Status: Closed
Total funding: £416,405
From: Sept. 30, 2010
To: Sept. 30, 2014
Organisations: 2
People: 3


Measuring the progress towards transforming the global energy system (using / building from the Pacala and Socolow wedges approach

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: Dec. 31, 2022
Organisations: 1
People: 2

Development and application of an in silico metabolic model of Geobacillus thermoglucosidasius

Status: Closed
Total funding: £499,660
From: Sept. 30, 2011
To: Jan. 31, 2013
Organisations: 2
People: 2


Hydrogen and Fuel Cells Hub Extension (H2FC SUPERGEN)

Status: Closed
Total funding: £16,865,580
From: April 30, 2017
To: Dec. 31, 2022
Organisations: 7
People: 11

Hydrogen and Fuel Cell Supergen Hub

Status: Closed
Total funding: £20,504,775
From: April 30, 2012
To: April 30, 2017
Organisations: 6
People: 14


Development of Geobacillus thermoglucosidasius as a robust platform for production of chemicals from renewables through modelling and experimentation

Status: Closed
Total funding: £2,184,035
From: Jan. 23, 2012
To: April 15, 2012
Organisations: 2
People: 2

Energy Systems and Renewables in Brazil - A Focus on Photovoltaics (PV)

Status: Closed
Total funding: £17,210
From: May 31, 2009
To: Oct. 31, 2009
Organisations: 1
People: 1


Space Weather Impacts on Ground-based Systems (SWIGS)

Status: Closed
Total funding: £1,584,030
From: April 30, 2017
To: April 30, 2022
Organisations: 10
People: 2

Parallelising Mixed-Integer Optimisation: Energy Efficiency Applications

Status: Closed
Total funding: £1,007,420
From: March 1, 2017
To: Feb. 28, 2018
Organisations: 4
People: 1


Cyber-physical System Modelling for Cyber-security Analysis in Electricity Systems

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: Dec. 31, 2021
Organisations: 1
People: 2

JPI Urban Europe/NSFC: Socio-Techno-Economic Pathways for sustainable Urban energy develoPment

Status: Closed
Total funding: £1,521,085
From: April 30, 2019
To: Jan. 31, 2023
Organisations: 2
People: 3


Energy Futures DTC

Status: Closed
Total funding: £2,217,535
From: April 6, 2010
To: April 6, 2015
Organisations: 1
People: 4

SPONSORSHIP AWARD: Urban-scale Building Energy Network

Status: Closed
Total funding: £116,405
From: May 29, 2014
To: May 29, 2015
Organisations: 7
People: 5


UK Energy Research Centre Phase 3

Status: Closed
Total funding: £67,659,805
From: April 30, 2014
To: Aug. 31, 2019
Organisations: 11
People: 24

Non-pathogenic Type III Secretion system-based tools for delivery of bioactive proteins into plant cells

Status: Closed
Total funding: £0
From: Sept. 29, 2017
To: Sept. 1, 2021
Organisations: 3
People: 2


Ionic liquid biorefining: lignocellulose deconstruction and bio-derived renewable polymers

Status: Closed
Total funding: £0
From: Oct. 19, 2016
To: April 19, 2020
Organisations: 1
People: 2

The Sc2.0 UK Genome Engineering Resource (SUGER)

Status: Closed
Total funding: £4,903,405
From: Sept. 30, 2013
To: June 30, 2018
Organisations: 2
People: 4


Ionic liquid biorefining: lignocellulose deconstruction and bio-derived renewable polymers

Status: Closed
Total funding: £0
From: Oct. 19, 2016
To: April 19, 2020
Organisations: 1
People: 2

Food Security and Land Use: The Telecoupling Challenge

Status: Closed
Total funding: £277,185
From: Feb. 1, 2015
To: Dec. 31, 2020
Organisations: 2
People: 1


Assessment of Integrated Microalgal-Bacterial Ecosystems for Bioenergy Production - Optimization-based Methodology

Status: Closed
Total funding: £496,905
From: Feb. 1, 2012
To: Jan. 31, 2013
Organisations: 5
People: 1

Melt-spinning of ionoSolv lignin for sustainable carbon fibre production

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: June 28, 2019
Organisations: 1
People: 2


Energy Storage for Low Carbon Grids

Status: Closed
Total funding: £28,105,080
From: Sept. 30, 2012
To: June 30, 2018
Organisations: 45
People: 16

Supergen Energy Networks hub 2018

Status: Closed
Total funding: £25,917,925
From: Sept. 30, 2018
To: June 30, 2020
Organisations: 37
People: 9


Resilient Electricity Networks for a productive Grid Architecture (RENGA)

Status: Closed
Total funding: £4,920,740
From: April 30, 2018
To: April 30, 2022
Organisations: 3
People: 7

DC networks, power quality and plant reliability

Status: Closed
Total funding: £1,791,210
From: Nov. 1, 2019
To: April 30, 2023
Organisations: 1
People: 1


Grid Economics, Planning and Business Models for Smart Electric Mobility

Status: Closed
Total funding: £5,028,850
From: Dec. 31, 2013
To: Dec. 30, 2016
Organisations: 12
People: 6

Dispersive Mixing in Multicomponent Multiphase Flow: Numerical and Physical Effects

Status: Closed
Total funding: £1,659,430
From: Sept. 30, 2008
To: Sept. 30, 2011
Organisations: 1
People: 1


Lead Doc - An integrated assessment of UK Shale resource distribution based on fundamental analyses of shale mechanical & fluid properties.

Status: Closed
Total funding: £1,399,250
From: Aug. 31, 2018
To: Aug. 31, 2022
Organisations: 5
People: 5

MASTER - Proposal for providing work to continue activity of the UK Energy Research Centre (UKERC) 2009 - 2014

Status: Closed
Total funding: £92,646,480
From: April 30, 2009
To: April 30, 2014
Organisations: 46
People: 24


Design Toolbox for Energy Efficiency in the Process Industry

Status: Closed
Total funding: £2,425,270
From: Sept. 30, 2009
To: Sept. 30, 2013
Organisations: 1
People: 1

Advances Polymer material for Energy Security - POLYMAT

Status: Closed
Total funding: £1,733,550
From: Sept. 30, 2015
To: Jan. 31, 2019
Organisations: 6
People: 1


A global framework for quantifying the ecosystem service impacts of oil and biofuel production

Status: Closed
Total funding: £1,052,005
From: Nov. 1, 2011
To: Oct. 31, 2013
Organisations: 1
People: 2

New Research Directions for Solid Oxide Fuel Cell Science and Engineering

Status: Closed
Total funding: £4,510,220
From: March 1, 2008
To: Feb. 28, 2013
Organisations: 3
People: 4


Development of a Novel Tunnel-junction-free Concentrator Cell and its Evaluation for a Smart Windows Application

Status: Closed
Total funding: £2,642,435
From: March 13, 2006
To: March 12, 2010
Organisations: 3
People: 1

Solving fuel cell degradation issues to achieve high efficiency combined heat and power

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: March 31, 2023
Organisations: 1
People: 2


EPSRC Fellowships in Manufacturing - "Manufacturing Routes for Organic Room-Temperature MASER"

Status: Closed
Total funding: £11,042,190
From: April 30, 2013
To: Jan. 31, 2019
Organisations: 11
People: 2

Carbon Capture and Storage: Realising the Potential

Status: Closed
Total funding: £613,750
From: March 31, 2010
To: March 31, 2012
Organisations: 1
People: 3


Vanadium-Hydrogen flow battery for energy storage applications - a feasibility study

Status: Closed
Total funding: £740,055
From: April 30, 2015
To: July 31, 2016
Organisations: 1
People: 1

Improving tidal energy feasibility with advanced modelling and optimisation techniques.

Status: Closed
Total funding: £0
From: June 30, 2018
To: Dec. 30, 2021
Organisations: 1
People: 1


Sincere: Selective ion-conductive ceramic electrolytes

Status: Closed
Total funding: £492,680
From: June 30, 2016
To: June 30, 2017
Organisations: 6
People: 1

Beyond structural; multifunctional composites that store electrical energy

Status: Closed
Total funding: £4,182,030
From: Feb. 1, 2017
To: July 31, 2021
Organisations: 7
People: 4


ISCF Wave 1: Translational Energy Storage Diagnostics (TRENDs)

Status: Closed
Total funding: £5,018,540
From: Sept. 30, 2017
To: Dec. 31, 2020
Organisations: 7
People: 8

Miniatuarised Fuel Cells from Biomass

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: Sept. 30, 2023
Organisations: 1
People: 0


Improved Estimation of Anisotropic Neutron Diffusion Coefficients for Neutron Streaming in Advanced Gas Cooled Reactors (AGRs): Application to Steam I

Status: Closed
Total funding: £0
From: Sept. 2, 2018
To: March 2, 2022
Organisations: 2
People: 1

Probability, Uncertainty and Risk in the Natural Environment

Status: Closed
Total funding: £1,038,945
From: Aug. 19, 2012
To: Aug. 19, 2016
Organisations: 1
People: 2


The Changing Shape of Magnetic Refrigeration: an investigation of adaptive magnetic materials

Status: Closed
Total funding: £1,640,665
From: July 31, 2012
To: Oct. 31, 2015
Organisations: 4
People: 1

Comparative assessment and region-specific optimisation of GGR

Status: Closed
Total funding: £8,249,940
From: June 30, 2017
To: Dec. 31, 2021
Organisations: 14
People: 11


Selection and Optimization of Radiation Detector Materials

Status: Closed
Total funding: £481,850
From: Feb. 1, 2007
To: Jan. 31, 2010
Organisations: 3
People: 1

Isothermal Refining by Organic Solvent Nanofiltration - ISOREF

Status: Closed
Total funding: £1,473,325
From: Feb. 1, 2015
To: Jan. 31, 2017
Organisations: 2
People: 2


Quantum-Interference-Enhanced Thermoelectricity (QUIET).

Status: Closed
Total funding: £2,915,540
From: Sept. 30, 2016
To: Aug. 31, 2017
Organisations: 1
People: 3

Understanding CO2 Reduction Catalysts

Status: Closed
Total funding: £1,476,145
From: Jan. 5, 2015
To: Jan. 3, 2017
Organisations: 1
People: 2


Investigating the impacts of shifting to a plant-based diet on society and the environment

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: March 17, 2023
Organisations: 1
People: 2

Co-Chair of Working Group III (Mitigation) of the Intergovernmental Panel on Climate Change: Scientific Support

Status: Closed
Total funding: £26,903,092
From: March 31, 2017
To: Sept. 30, 2023
Organisations: 7
People: 4


Future Infrastructure Forum (FIF) - a network for resilient and sustainable infrastructure

Status: Closed
Total funding: £719,040
From: Oct. 2, 2011
To: April 2, 2013
Organisations: 44
People: 1

Stochastic ultrasonic scattering from the tips of rough cracks

Status: Closed
Total funding: £2,076,840
From: March 31, 2017
To: Aug. 31, 2020
Organisations: 11
People: 2


Improving the Reliability, Longevity and Lifetime Performance of Magnetic Cooling Technology [Energy Catalyst: R3 Mid-Stage]

Status: Closed
Total funding: £1,817,330
From: Nov. 1, 2016
To: April 30, 2019
Organisations: 2
People: 2

Network to Investigate Sustainable Economic and Ecological models of Peripheral Urban Functional Units

Status: Closed
Total funding: £1,417,580
From: Nov. 1, 2007
To: Sept. 30, 2010
Organisations: 1
People: 3


Improving Inspection Reliability through Data Fusion of Multi-View Array Data

Status: Closed
Total funding: £1,438,850
From: March 31, 2016
To: March 31, 2019
Organisations: 5
People: 1

Delivering sustainable water systems by optimising existing infrastructure via improved knowledge, understanding and technology - project NEPTUNE

Status: Closed
Total funding: £11,729,425
From: March 23, 2007
To: Sept. 22, 2010
Organisations: 4
People: 17


Digital Economy Sustainable Society Network+

Status: Closed
Total funding: £7,482,030
From: May 2, 2012
To: June 30, 2016
Organisations: 34
People: 3

Molecular Cage Membranes for PX Separation

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: Sept. 30, 2023
Organisations: 2
People: 1


High-efficiency Hybrid Solar Cells for Micro-generation

Status: Closed
Total funding: £1,375,895
From: Oct. 31, 2007
To: Oct. 30, 2010
Organisations: 1
People: 2

International Collaboration in Chemistry: Novel Approaches to Molecular Assembly in Polymers for Solar Energy Conversion

Status: Closed
Total funding: £1,205,840
From: Oct. 3, 2010
To: July 31, 2014
Organisations: 2
People: 2


Reduced Energy Recycling of Lead Acid Batteries (RELAB)

Status: Closed
Total funding: £6,477,590
From: Dec. 1, 2016
To: Nov. 30, 2021
Organisations: 3
People: 5

The future is low-carbon energy

Status: Closed
Total funding: £73,300
From: Sept. 12, 2010
To: Sept. 12, 2011
Organisations: 1
People: 1


Migration of CO2 through North Sea Geological Carbon Storage Sites: Impact of Faults, Geological Heterogeneities and Dissolution

Status: Closed
Total funding: £3,501,440
From: April 30, 2016
To: April 30, 2021
Organisations: 2
People: 4

Development of Unified Experimental and Theoretical Approach to Predict Reactive Transport in Subsurface Porous Media

Status: Closed
Total funding: £1,973,135
From: March 31, 2014
To: Sept. 30, 2017
Organisations: 5
People: 2


Development of detectability criteria to quantify defects visibility in simulated radiographic images of industrial structures

Status: Closed
Total funding: £0
From: April 10, 2016
To: Oct. 10, 2019
Organisations: 2
People: 1

Mathematical and Computational Modelling of Nuclear Criticality Safety in Particulate Dispersed Multiphase Media

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: June 30, 2022
Organisations: 2
People: 1


Computational Modelling and Simulation of Low Source Start-up and Power Ascension in Advanced Nuclear Power Plants (NPP)

Status: Closed
Total funding: £0
From: Sept. 30, 2018
To: March 31, 2022
Organisations: 2
People: 1

Indiacool - UK-India Solar Cooling Innovation (Energy Catalyst Mid-stage Programme)

Status: Closed
Total funding: £500,295
From: March 6, 2017
To: July 5, 2018
Organisations: 8
People: 1


Electric Vehicle Charging Infrastructure in London: V2G solutions to enable EV charging and grid services

Status: Closed
Total funding: £0
From: Sept. 30, 2017
To: Dec. 31, 2021
Organisations: 1
People: 2

Hollow Fibre Solid Oxide Fuel Cells

Status: Closed
Total funding: £1,086,885
From: May 31, 2007
To: Sept. 30, 2010
Organisations: 1
People: 2


Characterization and optimization of new fluorite-related oxide ion conductors

Status: Closed
Total funding: £699,470
From: Nov. 1, 2006
To: April 30, 2010
Organisations: 1
People: 1

The Flexible Fuel Cell

Status: Closed
Total funding: £1,087,455
From: Sept. 30, 2009
To: March 31, 2013
Organisations: 8
People: 1


Control of structure, strain and chemistry: a route to designer fuel cell interfaces

Status: Closed
Total funding: £5,380,215
From: March 31, 2015
To: March 31, 2019
Organisations: 6
People: 6

Development of novel mesoporous Pd based electrocatalysts for methanol tolerant oxygen reduction

Status: Closed
Total funding: £1,778,170
From: July 31, 2011
To: Jan. 31, 2015
Organisations: 3
People: 1


Collaborative Research Opportunities in Energy with South Africa: Ab-Initio development and testing of fuel cell catalysts

Status: Closed
Total funding: £3,093,005
From: Oct. 4, 2009
To: Oct. 4, 2013
Organisations: 6
People: 4

"Mind the Gap" - jumping the hurdles limiting polymer fuel cell performance and commercialisation

Status: Closed
Total funding: £5,189,705
From: Nov. 30, 2011
To: Aug. 31, 2015
Organisations: 5
People: 4


New Technologies for Selective Carbon Dioxide Reduction

Status: Closed
Total funding: £58,795
From: Aug. 31, 2022
To: Aug. 31, 2023
Organisations: 2
People: 1

WAMS based self-tuning FACTS controllers for improved utilisation of existing power transmission assets

Status: Closed
Total funding: £1,283,260
From: July 2, 2008
To: July 2, 2011
Organisations: 4
People: 1


Space-time meta-surfaces for light waves

Status: Closed
Total funding: £1,009,970
From: Jan. 18, 2021
To: Jan. 17, 2023
Organisations: 1
People: 3

DEVELOPING THE NEXT GENERATION OF HYDROGEN ASSISTED FRACTURE MODELS

Status: Closed
Total funding: £0
From: Sept. 30, 2019
To: June 30, 2023
Organisations: 1
People: 1


Assessing the utility of the 2050 calculators as tools for decision makers on trade-offs and policies through an AFOLU and a smart land use lens.

Status: Closed
Total funding: £0
From: Dec. 2, 2019
To: June 1, 2023
Organisations: 1
People: 0

The Sustainable Agricultural Transition: how to promote climate-beneficial measures with farmers in arable farmlands and within the livestock sector

Status: Closed
Total funding: £0
From: Sept. 30, 2021
To: Oct. 3, 2022
Organisations: 1
People: 2



People in CoPED

Addresses
Imperial College London

London
SW7 2AZ