Home Projects Energy Project Search Request Permission to Contribute # Title Funder Funding Start End Status 1321 Optimisation of hydrogen and/or Ammonia based fuel utilisation in Gas Turbines EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 1322 Optimisation of hydrogen and/or Ammonia based fuel utilisation in Gas Turbines EPSRC £0 Sept. 30, 2020 June 30, 2021 Closed 1323 HISTORIC - Advanced Acquisition Programme for Vision 2010 Gas Turbine Systems (ATAP-10) Innovate UK £34,628,800 April 30, 2003 Oct. 31, 2007 Closed 1324 Gas-Turbine and Governor Modelling and Benefits of Integrated Control of Embedded Generation Plant EPSRC £331,964 March 31, 2006 March 30, 2009 Closed 1325 Feasibility of an Innovative Methodology for Testing Marine Current Turbines in Unsteady Flow EPSRC £69,958 March 31, 2008 June 29, 2009 Closed 1326 HISTORIC - Decommissiong of Seaflow turbine pile at Lynmouth - balance of funding from Seaflow project Innovate UK £58,446 Jan. 1, 2006 June 29, 2008 Closed 1327 The Drop Keel Concept: an Assembly Focused Solution to Commercial Deep Water Floating Wind Turbine Development Innovate UK £279,808 March 1, 2019 Sept. 29, 2019 Closed 1328 Advanced Gas Turbine cycles for high efficiency and sustainable future conventional generation EPSRC £1,943,972 May 31, 2015 Nov. 30, 2018 Closed 1329 Enabling technology for robotic inspection and maintenance of offshore wind turbine blades Innovate UK £117,252 Dec. 1, 2017 Aug. 30, 2018 Closed 1330 Experimental and Numerical analysis of a Floating Offshore Wind Turbine in waves and wind EPSRC £0 Aug. 31, 2019 Aug. 30, 2023 Active 1331 HydroPinPoint - Optimising the site selection of micro-hydro turbines in rivers in the UK and Overseas NERC £16,022 April 21, 2016 Sept. 20, 2016 Closed 1332 Flow control to mitigate fatigue load through the use of flexible tidal turbine blades EPSRC £192,096 Sept. 30, 2014 June 29, 2015 Closed 1333 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 1334 SENSE - Self Erecting Nacelle and Service System (for a large offshore wind turbine) Innovate UK £278,434 Sept. 30, 2016 Sept. 29, 2017 Closed 1335 Initial Research phase of momentum reversal lift turbine for tidal stream energy Innovate UK £360,848 Jan. 1, 2008 June 29, 2009 Closed 1336 Measured dynamic loading and power performance of tidal turbines in realistic flow conditions EPSRC £371,400 Sept. 30, 2014 Sept. 29, 2015 Closed 1337 Use of Endwall Contouring to Improve the Efficiency of Gas Turbines EPSRC £0 June 30, 2019 Sept. 29, 2023 Active 1338 A new design concept for a 25kW micro gas turbine for a hybrid car Innovate UK £10,000 Nov. 1, 2014 April 29, 2015 Closed 1339 New Research Directions for Solid Oxide Fuel Cell Science and Engineering EPSRC £1,804,088 March 1, 2008 Feb. 28, 2013 Closed 1340 Basic Research phase of Combined Lift-Momentum-Reversal Turbine for Tidal Stream EPSRC £195,128 Dec. 1, 2007 Feb. 28, 2009 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « … 62 63 64 65 66 67 68 69 70 71 72 … »