# Title Funder Funding Start End Status
9441 ISCF Wave 1: North East Centre for Energy Materials UUI
£9,168,370
Sept. 30, 2017 May 25, 2021 Closed
9442 Energy Harvesting Triboelectric Nano-Generators for the Internet-of-Things EPSRC
£3,163,130
Aug. 31, 2019 Aug. 31, 2024 Active
9443 Virtual Wave Structure Interaction (WSI) Simulation Environment EPSRC
£1,616,720
Oct. 31, 2013 March 31, 2017 Closed
9444 Beach change over individual wave cycles on sand and gravel beaches NERC
£380,980
Feb. 1, 2008 Jan. 31, 2010 Closed
9445 Beach morphological response to surface and subsurface flows: measurement and modelling EPSRC
£30,740
Nov. 1, 2009 Feb. 28, 2010 Closed
9446 Understanding How Marine Renewable Device Operations Influence Fine Scale Habitat Use and Behaviour of Marine Vertebrates (RESPONSE) NERC
£1,556,900
Sept. 29, 2011 Nov. 30, 2016 Closed
9447 Integrated Microwave Amplifiers for Electrosurgical Applications EPSRC
£496,215
April 26, 2016 May 31, 2017 Closed
9448 Kinetic plasma turbulence in space and astrophysical flows STFC
£1,660,050
March 31, 2010 March 31, 2012 Closed
9449 Bionic Adaptive Stretchable Materials for WEC (BASM-WEC) EPSRC
£4,952,605
Sept. 30, 2021 Jan. 31, 2025 Active
9450 High rate composites for electric vehicles Innovate UK
£551,425
April 30, 2021 Dec. 31, 2022 Closed
9451 Integrated prediction of 3D wave-induced liquefaction around breakwater heads EPSRC
£2,322,275
May 31, 2009 Aug. 31, 2012 Closed
9452 A novel integrated approach to efficiently model viscous effects on wave-structure interaction in extreme sea EPSRC
£500,530
Nov. 30, 2015 Nov. 29, 2017 Closed
9453 Synchronous Reluctance Machines for Electric Vehicles EPSRC
£0
Sept. 30, 2022 April 1, 2026 Active
9454 Reliability and Efficiency of Electric Vehicle Transmissions EPSRC
£0
Oct. 2, 2020 March 31, 2024 Active
9455 CHANGING THE WAY WE CHARGE ELECTRIC VEHICLES Innovate UK
£15,638,555
March 31, 2017 March 31, 2018 Closed
9456 TOBEV: Thermally Optimised Battery Electric Vehicle Innovate UK
£1,487,990
July 31, 2021 March 31, 2022 Closed
9457 Electric Vehicle Battery Remanufacturing (EV BATT-RE) Innovate UK
£121,250
May 31, 2013 Sept. 30, 2013 Closed
9458 Aggregative charging control of electric vehicle populations EPSRC
£502,070
Jan. 1, 2018 April 30, 2019 Closed
9459 Ultra Low Cost Electric Vehicle Platform Innovate UK
£969,825
June 30, 2019 July 31, 2020 Closed
9460 Electric vehicle suitability and infrastructure procurement software Innovate UK
£728,745
Sept. 30, 2020 Aug. 31, 2021 Closed
Reset