# Title Funder Funding Start End Status
7141 Developments for Run 2 of the AWAKE experiment STFC
£0
Sept. 30, 2021 March 30, 2025 Active
7142 MULTISPECTRAL QUANTITATIVE IMAGE RECONSTRUCTION METHODS FOR PHOTOACOUSTIC MOLECULAR IMAGING EPSRC
£654,652
March 10, 2006 June 8, 2009 Closed
7143 AWAKE-UK II STFC
£565,298
March 31, 2020 March 30, 2023 Active
7144 Velocity-SED Correlations in Type 1a Supernovae STFC
£0
Sept. 30, 2020 March 31, 2024 Active
7145 Studies of intramolecular and photoionization dynamics through the technique of time-resolved photoelectron imaging EPSRC
£0
Sept. 30, 2018 May 12, 2019 Closed
7146 Time-Resolved Photoelectron Spectroscopy using Hollow-Core Photonic Crystal Fibres EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
7147 The Host Galaxies of Long-Duration Gamma-Ray Bursts as High-Redshift Cosmological Probes STFC
£0
Sept. 30, 2018 March 30, 2022 Active
7148 Fs-VUV Generation: Mapping the Reaction Co-ordinate in Photochemical Dynamics EPSRC
£906,672
July 31, 2013 July 13, 2017 Closed
7149 Optimum topology for power handling in dual bandpass filters EPSRC
£0
Aug. 31, 2016 Oct. 31, 2019 Closed
7150 Study of the spectral energy distributions and variability of a large X-ray selected sample of AGN STFC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
7151 Vibrational energy distributions in large built-up structures - a wave chaos approach EPSRC
£219,102
Jan. 1, 2009 June 29, 2012 Closed
7152 Vibrational energy distributions in large built-up structures - a wave chaos approach EPSRC
£435,378
Jan. 1, 2009 Dec. 31, 2011 Closed
7153 Developing a new and novel spectral energy distribution fitting code STFC
£0
Sept. 18, 2016 May 30, 2020 Closed
7154 Measurement of the electron energy distribution at AWAKE STFC
£0
Sept. 30, 2015 March 31, 2019 Closed
7155 Novel Pyro-Gasification Technology for Hydrogen Production from Solid Waste EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
7156 Event Detection using Pattern Analytics Platform (EDPAP) Innovate UK
£560,906
May 31, 2017 March 30, 2018 Closed
7157 Integrated Energy Systems for Commercial Vehicles Innovate UK
£235,772
March 31, 2018 March 31, 2019 Closed
7158 Integrated Infrastructure for Sustainable Thermal Energy Provision (IN-STEP) EPSRC
£1,166,214
June 28, 2018 Dec. 12, 2022 Active
7159 REPSCORE - Renewable Energy Performance Score Innovate UK
£341,210
May 31, 2018 May 30, 2019 Closed
7160 Charging Hub Buffer Battery Feasibility Study - CHUBBY Innovate UK
£98,372
Jan. 1, 2019 March 31, 2019 Closed
Reset