# Title Funder Funding Start End Status
4901 MacroBioCrude: Developing an Integrated Supply and Processing Pipeline for the Sustained Production of Ensiled Macroalgae-derived Hydrocarbon Fuels EPSRC
£232,106
Feb. 1, 2013 Sept. 29, 2018 Closed
4902 THE INFLUENCE OF SAND-MUD INTERACTIONS ON MIXED SEDIMENT DYNAMICS EPSRC
£198,782
July 31, 2013 Jan. 31, 2015 Closed
4903 Lowering the Energy Demand and Broadening the Scope of Renewable Polymer Manufacture EPSRC
£597,288
April 20, 2015 Jan. 31, 2017 Closed
4904 Southern Ocean carbon indices and metrics (SARDINE) NERC
£589,936
Jan. 1, 2020 Aug. 30, 2023 Active
4905 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC
£201,240
Nov. 1, 2012 April 29, 2014 Closed
4906 Mechanistic controls of surface warming by ocean heat and carbon uptake NERC
£810,120
May 31, 2016 Aug. 30, 2019 Closed
4907 NI: CONFLUENCE - Disentangling the role of rivers as greenhouse gas conduits NERC
£166,054
Dec. 31, 2020 Dec. 30, 2022 Closed
4908 Global carbon cycle feedbacks from massive volcanism NERC
£0
Sept. 30, 2020 Sept. 26, 2027 Active
4909 Integrated Carbon, Waste and Cost Modelling for Design of Low Impact Buildings EPSRC
£298,832
Feb. 1, 2010 Jan. 31, 2012 Closed
4910 Phase 1 BPE for Cross Lane Development, Royston, Barnsley Innovate UK
£57,600
April 30, 2011 June 29, 2012 Closed
4911 EPSRC Centre for Doctoral Training in Future Innovation in Non-Destructive evaluation (FIND) EPSRC
£8,382,553
Sept. 30, 2019 March 30, 2028 Active
4912 Thermal management in commercial bread baking EPSRC
£933,192
Sept. 30, 2009 June 29, 2013 Closed
4913 Impact of Grid Forming Converters on Power System Stability EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
4914 Composite Cable Sleeper (CoCaSl) Innovate UK
£365,244
Dec. 1, 2017 Nov. 30, 2018 Closed
4915 Fundamental physical properties of graphene reinforced concrete EPSRC
£0
Sept. 30, 2015 March 31, 2019 Closed
4916 Fire Science In High-Rise Timber Buildings EPSRC
£0
Sept. 29, 2019 May 11, 2023 Active
4917 MLE Truck - Mega Low Emission Truck Innovate UK
£314,718
Aug. 31, 2017 Feb. 28, 2019 Closed
4918 Re-imagining industrial by-products to create a circular approach in the steel and cement industries. Innovate UK
£2,419,296
Sept. 30, 2021 March 30, 2023 Active
4919 (HeRO) Hybrid-enabled Remote Operations Innovate UK
£525,842
Aug. 31, 2021 March 30, 2022 Active
4920 Development and application of an in silico metabolic model of Geobacillus thermoglucosidasius BBSRC
£142,832
Feb. 1, 2013 Sept. 29, 2015 Closed
Reset